Loma Linda, California Building Permit Guide

To get a building permit in Loma Linda, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Loma Linda’s Building and Safety Division, part of the Community Development Department at the Civic Center on Barton Road, issues building, electrical, plumbing, mechanical, grading and demolition permits inside city limits, with every application filed through the city’s Online Permit Portal.

Authority: City of Loma Linda Building and SafetyOffice: 25541 Barton RoadPhone: 909-799-2836
Counter
8–10 a.m., Mon–ThuBuilding staff at the counter and phone
Inspections
11 a.m.–1 p.m.Monday to Friday; confirm before 11 a.m.
Simple permits
Same day to 2 daysComplex projects 15–30 working days
Water heater or HVAC change-out
$85Flat permit fee, November 2025 schedule

In Loma Linda, the city’s Building and Safety Division issues building, plumbing, electrical, mechanical, grading and demolition permits for all work inside city limits. Applications and plans must be filed through the Online Permit Portal, and building staff are at the counter and on the phone only from 8:00 to 10:00 a.m., Monday to Thursday, at the Civic Center, 25541 Barton Road. Inspections are made between 11:00 a.m. and 1:00 p.m., and flat permits such as a water heater or HVAC change-out cost $85.

What requires a building permit in Loma Linda?

The division’s FAQ says building permits are required for most buildings and structures, and it treats almost anything built on or attached to the ground as a structure. Electrical, plumbing and mechanical work needs its own separate permits, and the Building Division tells applicants which ones apply.

Permit required

  • New buildings, additions and accessory dwelling units
  • Fences, and walls taller than 18 inches
  • Most antennas
  • Pools more than 18 inches deep, and in-ground or above-ground spas
  • Patio covers, decks and balconies, block, garden and retaining walls (the city publishes a standard for each)
  • Re-roofs, water heater replacements and HVAC change-outs
  • Solar photovoltaic systems
  • Grading involving more than 1 foot of fill or more than 50 cubic yards of earth
  • Demolition

Generally no permit

  • Tool and storage sheds, playhouses and similar accessory buildings with less than 120 square feet of floor space, if designed as portable buildings

Even buildings and structures that need no building permit, including temporary or portable ones, must meet the city’s development standards, so the city advises talking to planning staff before putting anything up. Fences and walls also go through a $125 Planning review, and patios and other small structures a $125 patio and small structure review.

What the city decides and what the state holds

The City Council approved Loma Linda’s development impact fees, and the city sets its own fee schedule, zoning, design review through precise plans of design, and historic review through certificates of appropriateness. Its Fire Department charges its own solar fees and performs a fire final on solar systems. The building standards themselves and contractor licenses come from the state.

Loma Linda building department: who handles permitting

The Community Development Department, headed by Community Development Director Lorena Matarrita, contains the Planning Division and the Building and Safety Division. Building and Safety plan checks every proposed construction project, including additions and alterations, inspects new construction, additions, structural alterations and demolitions, calculates fees and issues building, plumbing, electrical, mechanical, grading and demolition permits. Property outside the city is permitted by San Bernardino County.

Short on time to read all of this?

Get a free quote →
Loma Linda permit contacts
DetailInformation
Building and SafetyCivic Center, 25541 Barton Road, Loma Linda, CA 92354; 909-799-2836; CommDev@lomalinda-ca.gov
Building counter and phone8:00 to 10:00 a.m., Monday to Thursday only
City Hall hours7:00 a.m. to 5:30 p.m., Monday to Thursday; closed Fridays; appointments recommended; main line 909-799-2800
Inspection requests909-799-2830 or 909-799-2836, or email the Building and Safety inbox; inspections 11:00 a.m. to 1:00 p.m., Monday to Friday
Online Permit PortalLoma Linda Online Permit Portal (applications, electronic plans, fees, progress, approved permits)
Planning: zoning questionsPlanning Technician, 909-799-2899
Planning: land use and entitlementsAssociate Planner, 909-799-2827

Loma Linda permit types

The Permit Applications page links the portal instructions, the owner-builder packet, a deputy inspector registration form, plan check requirement lists for new residential, new commercial and tenant improvement projects, a room addition and ADU checklist, residential solar minimum requirements, and building standards for patios, block walls, retaining walls, garden walls and decks or balconies.

Residential permits

  • New houses: the residential plan check list calls for five full sets of plans, two sets of structural calculations and two sets of Title 24 energy calculations on sheets at least 24 by 36 inches, with the Planning conditions of approval worked into the plans and all plan check fees paid at submittal. The cover sheet shows the legal description, project description, deferred submittals, building use, current codes and a vicinity map, and the person preparing the plans signs them with a certification or registration number. Without a soils report, the maximum allowable soil pressure is 1,000 pounds per square foot.
  • Additions under 500 square feet and ADUs: three complete plan sets with a scaled site plan, legal description, lot size and setbacks, foundation, floor, roof and elevation plans, and two sets of Title 24 calculations.
  • Residential solar: two sets of 11 by 17 inch plans with the module layout, single-line diagram, attachment and grounding details and a roof plan showing 3-foot fire setbacks; roof load calculations are needed if the added load is over 6.5 pounds per square foot, and a fire final inspection must pass before the building final.
  • Simple projects: patio covers and fences can usually be checked immediately, and at most within one to two days.

Commercial permits

New commercial buildings and tenant improvements follow their own plan check requirement lists. Commercial solar pays a building fee of $545 for up to 50 kW plus $3.50 per kW from 51 to 250 kW and $2.50 per kW above 250 kW, and the Fire Department’s solar fees are charged on top. A change of tenant or owner needs a $150 land use permit (zoning clearance), a change of land use a $280 one, and sign permits need Planning design review ($555) and a building plan check ($210). Complex projects take 15 to 30 working days to check.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Planning first: the city recommends a preliminary site plan review with planning staff before detailed drawings; every development project files an application checklist and an environmental information form.
  • Entitlements: larger projects need a precise plan of design (minor $2,140, administrative; major $7,715 to $9,160, Planning Commission or Council), and some need a conditional use permit; a preliminary development review costs $3,380, with half credited if the project is filed.
  • New houses and ADUs: Planning charges $1,870 to review a new single-family house and $805 for a new ADU or junior ADU ($555 for a conversion).
  • Historic review: a certificate of appropriateness costs $645.
  • Lots: a lot line adjustment costs $2,495 and an SB 9 lot split $6,040.
  • Grading: more than 1 foot of fill or 50 cubic yards of earth moved requires a grading permit.

Loma Linda building permit fees

Building plan check and permit fees are calculated from the total construction valuation and standard square-footage valuation tables, plus flat rates for HVAC, electrical and plumbing items; the valuation-based amounts are not printed in the city’s fee schedule, and the FAQ says permit fees start at $39.50. The November 2025 fee schedule for planning and building services lists the flat building permits and the Planning reviews that go with them.

Flat permits and reviews (November 2025 fee schedule)
ItemFee
Water heater permit$85
HVAC change-out permit$85
Re-roof permit$170
Above-ground spa / in-ground pool / in-ground spa$170 / $420 / $420
Residential solar PV$275, plus $15 per kW above 15 kW
Commercial solar PV$545 up to 50 kW, plus $3.50 per kW for 51–250 kW and $2.50 per kW above 250 kW
Planning review of building plans, minor / major$115 / $155
Fence or wall review; patio or small structure review$125 each
New single-family residence (Planning)$1,870
ADU or JADU, new / conversion$805 / $555
Land use permit: change of tenant or owner / change of use / backflow$150 / $280 / $125
Home occupation permit$170
Minor variance, owner-occupied single-family home$250
Zoning verification letter$585

Rather talk it over?

Call 1-855-478-4290 →

Worked example: a 20 kW residential rooftop solar system pays the $275 base fee plus five kilowatts above 15 kW at $15 each, or $350.

Development impact fees are collected for all new construction before the building permit is issued. Staff complete the impact fee worksheet for the applicant, and the fees are paid at the Finance Department; the worksheet was approved by the City Council on June 14, 2022 and April 11, 2023.

Development impact fees per new detached house (city worksheet)
FeeDetached house
Parkland acquisition and development$10,742
Water generation, storage and distribution$7,650
Regional circulation$4,511
Public meeting facilities$2,482
Fire suppression facilities$1,476
Wastewater collection$1,380
Local circulation$1,337
Storm drainage$1,251
General government facilities$179

Those rows total $31,008 for a detached house. The worksheet adds an art in public places charge based on project value, 0.25% for residential and 0.5% for commercial or industrial projects. School district fees are paid directly to the school district, sewer capacity fees to the City of San Bernardino, and water connection fees through the city’s Public Works Department.

Trade permits and who may pull them in Loma Linda

Building and Safety issues electrical, plumbing and mechanical permits separately from the building permit. Common replacements have flat fees, $85 for a water heater or an HVAC change-out and $170 for a re-roof, and other trade work is charged at flat rates per HVAC system or electrical and plumbing fixture.

Rather not deal with the building department?

Get a free quote →

The FAQ explains that either a licensed contractor or the property owner obtains the building permit; a friend or relative can apply for the owner with a letter of authorization. Owner-builders use the city’s owner-builder packet and form from the Permit Applications page, and special inspectors register with the city on the deputy inspector registration form.

How to apply for a Loma Linda building permit

1. Talk to Planning

Bring or send a preliminary site plan showing the lot, streets and existing and proposed buildings; staff advise on setbacks and the level of drawings needed.

2. Register in the portal

Create an account in the Online Permit Portal, using the city’s posted portal instructions.

3. Prepare plans

Follow the plan check requirement list for the project type and the city standards for patios, walls and decks.

4. Submit and pay plan check

Upload the application and electronic plans; plan check fees are due at submittal.

5. Answer corrections

Simple projects are checked within a day or two; complex projects take 15 to 30 working days.

6. Pay remaining fees

Impact fees are collected before issuance; school, sewer capacity and water fees are paid to their own agencies.

7. Download the permit and inspect

Approved permits appear in the portal; schedule inspections by phone or email.

Review, corrections and what causes delay

Because building staff take calls and counter visits only from 8:00 to 10:00 a.m. on Monday to Thursday and City Hall is closed on Fridays, questions are best sent by email or saved for those hours, and the department recommends booking an appointment before coming in. Plans must already carry Planning’s conditions of approval, and structural and Title 24 calculations are part of the minimum submittal.

Loma Linda building inspections

Schedule inspections by calling 909-799-2830 or 909-799-2836 or by email. Building inspections are made between 11:00 a.m. and 1:00 p.m., Monday to Friday. Same-day inspections are not always available, so confirm a same-day request before 11:00 a.m. that morning.

An inspection is needed whenever the next stage of work would cover the stage just finished: wall or addition footings before concrete is poured, framing before insulation and finishes, roof sheathing nailing before underlayment and roofing, and pipes before they are buried. The inspection card issued with the permit shows the stages, the permit holder calls the different departments for their inspections, and the final inspection is booked with the Building Division. Solar systems need a fire final before the building final.

Work must start within 180 days of the permit being issued, and a permit expires if work stops for more than 180 days; the Building Division can be asked for an extension.

Want this handled start to finish?

Get a free quote →

California building code in Loma Linda

Building staff implement the building code and the city’s other construction rules, and the city lists a Fire Code Board of Appeals among its boards; local amendments sit in the municipal code, which the city links from its site. FEMA’s Community Status Book lists the City of Loma Linda (community 065042) as participating in the National Flood Insurance Program, with flood maps effective October 30, 2025.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Loma Linda building permit FAQs

When can I reach Loma Linda Building and Safety?

At the counter or by phone from 8:00 to 10:00 a.m., Monday to Thursday, at 909-799-2836; City Hall is closed on Fridays.

Can I apply in person?

Applications must now be submitted through the Online Permit Portal, including electronic plans and fee payment.

Do I need a permit for a fence or wall?

Yes, for fences and for walls over 18 inches tall; Planning also charges a $125 fence or wall review.

How much is a water heater permit?

$85, the same as an HVAC change-out permit; a re-roof permit is $170.

How long does plan check take?

Simple projects like patio covers and fences are checked immediately or within one to two days; complex projects take 15 to 30 working days.

When do inspections happen?

Between 11:00 a.m. and 1:00 p.m., Monday to Friday; confirm same-day requests before 11:00 a.m.

What impact fees does a new house pay?

The city’s worksheet lists $31,008 per detached house plus an art in public places charge, collected before the permit issues.

Loma Linda permit search and official resources

Applicants track their applications and download approved permits in the Online Permit Portal. For other permit records, contact Building and Safety at 909-799-2836 during counter hours or by email.

Inspections are where schedules slip.

Get a free quote →

Simplify Loma Linda permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Loma Linda sooner?

Let Alliance prepare, file, and track your Loma Linda permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Loma Linda permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.