Building permits in Lomita come from the City of Lomita Building and Safety Division, which now provides plan check, permitting and inspections itself after taking the work over from Los Angeles County; County records and projects already in review were transferred to the City. Plans, fees, corrections and inspection requests run through the City’s GeoCivix portal, and most residential projects first need a Planning Division Pre-Review ($187.13 under the Master Fee Schedule in effect since June 4, 2025). The counter is inside City Hall at 24300 Narbonne Avenue (310-304-3788).
What requires a building permit in Lomita?
Lomita’s building pages do not post their own exemption list, so the practical test is the work types the City routes through permits and Planning review. The Planning Division’s Pre-Review for Building Permit, the staff-level check that comes before plan check, names the projects it covers: additions, new single-family homes, accessory dwelling units, two-unit housing developments, new garages, swimming pools, and landscaping and hardscape. Commercial tenant improvements, signs and changes of use also pass through Planning before a permit is issued.
Planning Pre-Review, then permit
- Room additions and new single-family homes
- Accessory dwelling units and two-unit developments
- New garages
- Swimming pools
- Landscaping and hardscape work
- Commercial tenant improvements and signs (sign review $165.12 per sign)
Extra plans the City asks for
- A boundary and topographic survey for every new building and addition
- A grading and drainage plan when 20 cubic yards or more of earth is moved or the work includes 3 feet of cut or fill (pools and basements excepted)
- A title report for new development on a vacant lot or a subdivision
- Lighting and photometric plans for new commercial, multi-family and mixed-use buildings
Anything not on these lists still goes to Building and Safety: the division asks owners to email BuildingSafety@LomitaCity.com or call 310-304-3788 when they are unsure whether a job needs a permit.
What Lomita decides and what the state sets
The City sets zoning, design review (Lomita has Downtown Design Guidelines and a Pacific Coast Highway Design Review Policy), front-yard landscaping rules, its development taxes and its fee schedule, and it now runs plan check and inspection itself. The construction standards are the state’s Title 24 codes, contractor licensing is a state matter, and the Municipal Code (hosted on Municode) holds any local amendments.
Lomita building department: who handles permitting
For years Lomita bought its building services from Los Angeles County Public Works. The City’s Building and Safety page, updated in May 2026, now says the City provides all building and safety services, including plan check, permitting and inspections, that County records were transferred to the City, and that projects in progress with the County are taken over by the City. One older line on the Planning page still tells owners to take approved projects to the County’s Building and Safety Division; Los Angeles County Public Works’ Building and Safety page also still lists a Lomita contract-city office. The City’s May 2026 Building and Safety page is the newer of these sources and reflects the change, so file with the City.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Building and Safety | Lomita City Hall, 24300 Narbonne Avenue, Lomita, CA 90717 |
| Phone and email | 310-304-3788; BuildingSafety@LomitaCity.com (plan-review status and general questions) |
| Building counter | 8 a.m. to 12 p.m. and 2 p.m. to 4 p.m., Monday to Thursday and every other Friday |
| Online | GeoCivix Building and Permitting Portal (plans, fees, comments, permits, inspections) |
| Planning Division | 310-325-7110 ext. 103; dutyplanner@lomitacity.com; counter 8–11 a.m. and 2–4 p.m. |
| Public Works (right-of-way permits) | 310-325-7110 ext. 155 |
The Planning Division’s office hours are 7:30 a.m. to noon and 1 to 5:30 p.m. on weekdays, closed every other Friday; City Hall is open Monday to Thursday 7:30 a.m. to 5:30 p.m. and every other Friday 8 a.m. to 5 p.m.
Lomita permit types and what comes first
Building permits are applied for in GeoCivix, a third-party system the City launched for building plans; Planning applications, banners, special events, block parties, film permits, residential property reports and the contractor self-haul waste permit use a separate OpenGov (ViewPoint Cloud) portal.
Residential permits
Typical home projects start with a Pre-Review for Building Permit in the Planning portal, which Planning describes as staff-level review for ministerial, by-right work. Some of these are routed to other City departments, County agencies or City consultants before approval. Plans for an addition or accessory structure must label everything on the site plan as existing to remain, existing to be demolished, or new, show setbacks, easements, air-conditioning units and screening, give inside dimensions of a garage, and include floor-area-ratio calculations. Front-yard landscaping that is renovated must be at least 50% drought-tolerant plants with irrigation, and new or altered landscaping over 1,500 square feet must meet Article 82 of the City code (water-efficient landscape review costs $1,433.60).
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
New commercial, multi-family and mixed-use projects add colored renderings, lighting and photometric plans and, for commercial and mixed-use work, a traffic or parking study by a registered traffic engineer. A commercial site with two or more tenants needs a Master Sign Program for a new center or major remodel. Businesses also need a zone clearance ($105.12) as part of the business license process, and a use that needs a conditional use permit goes to the Planning Commission first.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning review. Pre-Review for by-right work; Development Review for site plans with modifications, variances, conditional use permits and subdivisions, which go to the Planning Commission or City Council with newspaper and mailed notice. A one-time pre-application meeting costs $418.30.
- Grading and drainage. Required at 20 cubic yards or 3 feet of cut or fill; Public Works charges grading plan check from $196.77 plus consultant or County cost.
- Right of way. Driveways, trenching, utility connections and street use need a Public Works permit.
- Water service. The City runs its own water system: meter installation is $627.45 plus the meter, and a will-serve letter for water and sewer is $396.28.
Lomita permit fees
Lomita’s Master Fee Schedule was approved by the City Council on June 3, 2025 and took effect on June 4, 2025. It does not print its own building valuation table: the building line reads “LA County Building Fees, Resolution No. 99-21, 100% above county fee”, and a General Plan Update Fee of 5% of the building permit fee is added. Because the City now does its own plan check, ask Building and Safety for the figure on your job before you budget; the portal shows plan-review fees once an application is in.
| Item | Fee |
|---|---|
| Building permit and plan check | LA County building fees under Resolution No. 99-21, “100% above county fee” |
| General Plan Update Fee | 5% of the building permit fee |
| Pre-Review for Building Permit (Planning) | $187.13 |
| Pre-application meeting | $418.30 |
| Zone clearance / zoning letter | $105.12 / $374.27 |
| Sign review, per sign | $165.12 |
| Residential property report | $275.20 |
| Water-efficient landscape review | $1,433.60 |
| Minor / major conditional use permit | $1,651.20 / $4,733.44 |
| Appeal to the Planning Commission or City Council | $1,486.08 |
| Technology surcharge (Planning list) | 4% on all fees |
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Grading plan check, up to 1,000 cubic yards / 1,001–10,000 | $196.77 / $524.95, each plus consultant or LA County cost |
| Paving permit, up to 1,000 sq ft | $672.59 plus permit issuance |
| Trenching or other cut into the right of way, per item | $157.41 |
| Traffic control plan review, per lane, block and phase | $609.84 |
| Sewer connection inspection (City staff) / water connection inspection | $1,009.43 / $1,210.88, each plus issuance |
| Nighttime permits | Fee × 1.5 |
| Development tax (Ordinance 464) | $1,000 per new dwelling unit, trailer space or commercial or industrial unit |
| Park and recreation facilities tax (Ordinance 220) | $300 per new dwelling unit |
| Water facility fee (Ordinance 240) | 1% of valuation for a new single-family home; 1.25% duplex; 1.5% apartments up to two stories and commercial; 2% apartments of three stories or more |
| Parkway tree fee (Resolution 2000-5) | $275 per tree, one per 50 feet of frontage, on permits valued over $10,000 |
The development taxes come from the Planning Division’s summary handout. Its water facility fee excludes additions, remodels and the replacement of one single-family home with another. The same handout notes that work costing more than $35,000 within two years triggers curb, gutter and sidewalk construction along the street frontage under Section 10-5.02 of the City code. A 2025 development impact fee study is posted as an administrative draft; it is not an adopted schedule.
Trade permits and who may pull them
Building and Safety now issues the electrical, plumbing and mechanical permits that go with a building job, and the GeoCivix portal handles them alongside the building permit. Contractors need the state Contractors State License Board license for their trade, and owner-builders may apply for work on their own property under state law.
Lomita’s business license law (Title VI of the Municipal Code) reaches anyone conducting business in the city, whether or not they keep a fixed place of business here, so out-of-town contractors working in Lomita need a City business license. Applications are online, every applicant completes a zoning verification and a stormwater form, and the Business License Division quotes fees at 310-325-7110 ext. 137.
Rather not deal with the building department?
Get a free quote →Construction waste is part of the permit picture: CalMet Services holds the City’s exclusive solid waste franchise, including construction and demolition debris. The alternatives are a City self-haul permit, applied for online, or a licensed contractor hauling debris from its own work in its own or leased equipment, such as a roofer removing an old roof. Planning asks applicants to sign the CalMet customer acknowledgement form.
How to apply for a building permit in Lomita
Look up the parcel on the City zoning map and call the duty planner at 310-325-7110 ext. 103 to confirm whether the job is a Pre-Review or a Development Review.
Submit the Pre-Review ($187.13) or Development Review in the OpenGov planning portal with plans in PDF, the filing fee and the items on the 2026 Planning submittal checklist (survey, grading plan, landscape plan as needed).
After Planning approval, create an account in the GeoCivix Building and Permitting Portal and choose Submit Application.
Upload the construction drawings and supporting documents and pay the plan-review fee in the portal.
Review comments arrive electronically; resubmit revised plans in the same portal and track status on the dashboard.
Get Public Works permits for driveway, utility or street work, settle development taxes and the business license, then obtain the permit in GeoCivix.
Review, corrections and what causes delay
Development Review takes longer than staff review because it needs a staff report, newspaper notice, mailers to neighbors and a public hearing before the Planning Commission or City Council. Projects that start building plan check without Planning approval, plans missing the survey or grading and drainage plan the checklist calls for, and incomplete resubmittals all slow things down. For status questions during review, email BuildingSafety@LomitaCity.com.
Inspections in Lomita
Inspections are requested through the Schedule an Inspection button in the GeoCivix portal, the same place permits are issued, and the applicant dashboard shows required actions on open plan reviews and inspections. City staff inspect the work now that the County no longer serves Lomita. Public Works inspects its own permits, such as sewer and water connections and paving, and its fee list carries an after-hours charge of $131.40 for work after 4 p.m. on weekdays, at weekends and on holidays.
When a home is sold, the seller signs the City’s water conservation certificate before close of escrow, stating that every toilet, faucet and showerhead meets Section 12-4.02 of the Municipal Code: 1.6 gallons per flush for existing toilets or 1.3 for new ones, and 2.5 gallons per minute for showerheads and faucets. Planning also offers residential property reports for $275.20.
Want this handled start to finish?
Get a free quote →Building code in Lomita
Lomita enforces the state codes through its own Building and Safety Division, and its local rules (fence standards in Section 11-30.07, business licensing in Title VI, water conservation in Section 12-4.02) are in the Municipal Code on Municode. FEMA lists Lomita as a participating community in the National Flood Insurance Program, with no special flood hazard area mapped in the city.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Frequently asked questions
Does Los Angeles County still issue building permits in Lomita?
No. The City’s Building and Safety Division says it now provides plan check, permitting and inspections, and that County records and projects already in progress were transferred to the City.
How much is a building permit in Lomita?
The June 2025 Master Fee Schedule ties building fees to Los Angeles County’s fees under Resolution No. 99-21, “100% above county fee”, plus a 5% General Plan Update Fee. Planning Pre-Review adds $187.13. Ask Building and Safety at 310-304-3788 for the figure on your job.
Do I need Planning approval first?
For most building projects, yes. Additions, new homes, ADUs, garages, pools and hardscape go through a staff-level Pre-Review; variances, conditional use permits and subdivisions go to the Planning Commission or City Council.
How do I submit plans?
Through the GeoCivix Building and Permitting Portal, where you upload plans, pay plan check, receive comments, resubmit and obtain the permit.
When is the building counter open?
From 8 a.m. to 12 p.m. and 2 p.m. to 4 p.m., Monday to Thursday and every other Friday, inside City Hall at 24300 Narbonne Avenue.
Can I use my own dumpster company?
Not usually. CalMet Services has the exclusive franchise for construction debris; the exceptions are a City self-haul permit or a licensed contractor hauling its own debris in its own equipment.
What fees apply to a new house?
Besides building and planning fees, the City’s development fee summary lists a $1,000 development tax and a $300 park tax per new dwelling unit, a water facility fee of 1% of valuation, and $275 per parkway tree.
Is Lomita in a flood zone?
FEMA’s Community Status Book shows no special flood hazard area mapped in Lomita, and the City participates in the National Flood Insurance Program.
Inspections are where schedules slip.
Get a free quote →Lomita permit search and official resources
To follow an application, use the GeoCivix dashboard for building plan reviews and inspections and the OpenGov portal for Planning applications. Older permits issued by Los Angeles County for Lomita addresses were transferred to the City, so ask Building and Safety for them.
- Building and Safety Division
- GeoCivix Building and Permitting Portal
- Planning Division and handouts
- Online planning permits (ViewPoint Cloud)
- Master Fee Schedule, effective June 4, 2025 (PDF)
- Planning submittal checklist, 2026 (PDF)
- Summary of development fees (PDF)
- CalMet construction waste acknowledgement (PDF)
- Water conservation certificate for escrow (PDF)
- Business licensing
- Public Works permits
- California Building Standards Code (Title 24)
Simplify Lomita permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lomita sooner?
Let Alliance prepare, file, and track your Lomita permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Lynwood
Read guide →Malibu
Read guide →Lompoc Building Permit Guide
Read guide →Long Beach Building Permit Guide
Read guide →Los Alamitos Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Lomita permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.