Skip to main content
Municipal GuideCaliforniaLos Alamitos · Orange County

Los Alamitos, California Building Permit Guide

To get a building permit in Los Alamitos, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Los Alamitos’ Building and Safety Division at City Hall, 3191 Katella Avenue, issues building, electrical, plumbing, mechanical and block wall permits inside the city through its online Building Permit Center; Rossmoor is county territory.

Authority: Los Alamitos Building & Safety DivisionPhone: 562-431-3538Counter: Mon–Thu, 7:30–10:00 a.m.
Authority
City Building & Safety3191 Katella Ave; not Rossmoor
Apply
Building Permit CenterOnline 24 hours; PDF plans
Plan check
10 business daysFirst review; 5 for the second
Inspections
10 a.m.–3:30 p.m.Morning and afternoon windows

In Los Alamitos, building permits are issued by the city’s Building and Safety Division in the Development Services Department at City Hall, 3191 Katella Avenue (562-431-3538), where Fernando Zarate is the Building Official. Applications, PDF plans, fees and inspection requests go through the online Building Permit Center; since May 4, 2026 the walk-in counter is open Monday to Thursday from 7:30 to 10:00 a.m. Most projects get a first plan review within 10 business days. The city does not serve neighboring Rossmoor, which is permitted by Orange County.

What requires a building permit in Los Alamitos?

The division’s answer is that most major projects need a permit of some kind, and it lists five common types: building permits to build or change a building or structure, electrical, plumbing and mechanical permits for those systems, and block wall permits. Signs, including existing signage, are checked through a building permit, according to the Planning Division.

Permit needed

  • New buildings, additions, alterations and remodels, including kitchens and baths
  • Electrical, plumbing and mechanical installations and changes, including water heaters and panel upgrades
  • Walls over 42 inches high and retaining walls over 30 inches (block wall permit)
  • Patio covers, window change-outs and re-roofs above the small-repair limit
  • Pools and spas (with a barrier compliance form) and pool demolition
  • Solar systems and business signs

Common exceptions (city FAQ)

  • Decks and platforms under 30 inches high, open walkways and driveways on grade
  • Replacing up to 400 sq ft of roofing in any 12-month period
  • Ceramic tile on floors and countertops, and on walls up to 48 inches high, and replacing broken tiles
  • Plaster patching up to 10 square yards
  • Pools no deeper than 2 feet with no electrical or plumbing
  • Cases, counters and partitions under 5 feet; retaining walls and planters under 30 inches measured from the bottom of the footing

The division’s handouts add detail for common jobs. A kitchen remodel needs a permit when cabinets, countertops, the sink, dishwasher, an island, wiring or the exhaust hood are removed, replaced or moved, but not for a countertop replacement or cabinet refacing alone; once a remodel permit is issued, state law requires non-compliant plumbing fixtures throughout the house to be upgraded to water-conserving ones. Every window and exterior door replacement at a home needs a building permit, with a simple floor and plot plan showing the existing and new window sizes, and the handout sets maximum energy values of 0.30 U-factor and 0.23 solar heat gain for new windows. For garden walls, Planning must approve the plans before any permit is issued, and no wall or fence may be built within 36 inches of a fire hydrant or 12 inches of a water meter.

Short on time to read all of this?

Get a free quote →

The same exceptions list says a block wall under 30 inches high needs no permit, while the permit-types answer requires a block wall permit only above 42 inches. Walls between those heights are worth raising with the division before building.

What Los Alamitos decides and what the state holds

Since January 1, 2026 the city has enforced the 2025 California Building Standards Code with local amendments. The division’s published design criteria are climate zone 8, seismic design category D, exposure C and design wind speeds of 85 mph for houses and 110 mph for commercial buildings. Zoning rules such as setbacks (Municipal Code Section 17.16.110), fence heights (17.16.020) and shed placement (17.28.030) are the city’s own; contractor licensing is the state’s.

Los Alamitos building department: who handles permitting

The Building and Safety Division of the Development Services Department authorizes construction and remodeling inside the City of Los Alamitos. Its staff take in plans, collect fees, review and issue permits, and inspect the work. Fire services in the city come from the Orange County Fire Authority.

Los Alamitos permit contacts
DetailInformation
OfficeBuilding and Safety Division, Development Services, City Hall, 3191 Katella Avenue, Los Alamitos, CA 90720
Phone562-431-3538 (Building Official, extension 302)
Counter hoursMonday to Thursday, 7:30 to 10:00 a.m., except federal holidays (since May 4, 2026)
Building OfficialFernando Zarate
Planning562-431-3538, extension 303
UtilitiesGolden State Water; Southern California Gas; Southern California Edison

Rossmoor and other addresses outside the city

The city’s Building and Safety Division does not serve neighboring Rossmoor. Rossmoor projects go to OC Public Works Building and Safety, whose permit counter is at the County Service Center, 601 North Ross Street, Santa Ana (714-667-8888), covered by the Orange County permit guide. The Planning Division’s list of Los Alamitos streets and addresses is the quick way to check whether a property is in the city.

Los Alamitos permit types

Every permit type can be applied for in the Building Permit Center, which is open around the clock for accounts, applications, PDF plan uploads, credit card payments, revisions and inspection requests. The permit application asks for the project value, construction type and occupancy, the contractor’s state license number and type, the workers’ compensation policy and the contractor’s city business license number, with check-off lists for electrical, plumbing and mechanical items.

Not sure this scope needs a permit?

Get a free quote →

Residential permits

The division publishes handouts for kitchen and bathroom remodels, attached and detached patio covers, block walls with a common wall agreement for shared property lines, electrical panel upgrades and load calculations, water heaters, window change-outs, wood frame construction, fire separation and pool barriers. Owners sign a smoke and carbon monoxide detector affidavit where the inspector will not go inside the home, as on re-roofs, patios and stucco repair. Solar systems on one- and two-family homes up to 10 kW can use the expedited process with the state standard plans, and SolarAPP+ is available through the Permit Center.

Commercial permits

Tenant improvements follow the division’s checklist and need a letter from the building owner authorizing the work before a permit is issued. Every business permitted by right in its zone needs a zoning permit under Municipal Code Chapter 17.50 as part of the business license process, and Planning reviews whether the activity is allowed on the parcel. Commercial solar fees are based on system size in kilowatts.

What comes before the building permit

  • Planning review. The Planning Division handles development review, zoning code administration, CEQA and Planning Commission items; the zoning map shows each parcel’s zone.
  • Waste plan. The division provides a construction waste management plan form and lists of recycling facilities for construction and demolition debris.
  • Utilities. New or upgraded services involve Southern California Edison, Southern California Gas and Golden State Water.

Los Alamitos permit fees

Building permit fees are based on the project’s value, set by construction type, size and use, and are meant to recover the cost of plan checking, inspection and administration. The city keeps its master fee schedules in a Finance Department document folder. Once an online application and its PDFs arrive, City Hall contacts the applicant with the plan check fee, payable by credit card over the phone; all plan check and permit fees can also be paid in the Permit Center. Planning, state, school and sewer fees may be added.

Rather talk it over?

Call 1-855-478-4290 →
Los Alamitos plan check and solar fees
ItemFee
Building plan check65% of the building permit fee
Plumbing plan check65% of the plumbing permit fee
Electrical plan check50% of the electrical permit fee
Mechanical plan check25% of the mechanical permit fee
Residential solar, plan review and permitNot more than $450
Commercial solarBased on kilowatts

For a building permit fee of $1,000, for example, building plan check adds $650, collected before review. Ask the division at 562-431-3538 for the permit fee on a specific project value before applying.

Trade permits and who may pull them in Los Alamitos

Electrical, plumbing and mechanical permits are separate permit types, each with its own plan check percentage where plans are reviewed. Panel upgrades, water heaters and underground gas piping each have a city handout.

  • Licensed contractors may pull permits. Contractors and their subcontractors must hold a Los Alamitos business license, applied for through the city’s online business license portal. A contractor with employees keeps a workers’ compensation certificate on file with Development Services; one working alone may waive it but must show a pocket copy of the state license.
  • Owners may pull permits for single-family or duplex buildings when they live in one of the units. A non-resident owner of a single-family or commercial property may pull a permit only when the work is worth no more than 10% of the building’s value in any 12-month period. The city’s owner-builder handout explains the risks of acting as worker, contractor or employer.
  • Agents pulling permits for a contractor bring an authorization letter on company letterhead; it does not need to be notarized.

The applicant’s signature and identity are checked when a permit is taken out, with a California driver’s license, state ID card or other photo identification. On every job a completed subcontractor list form stays on site; the inspector will not final the project without it.

Rather not deal with the building department?

Get a free quote →

How to apply for a Los Alamitos building permit

1. Confirm the address is in the city

Check the city’s streets and addresses list; Rossmoor and other county areas go to Orange County.

2. Check zoning

Look up the zone and development standards, or ask Planning (extension 303).

3. Create a Permit Center account

Follow the city’s login instructions for the Building Permit Center.

4. Submit the application and PDFs

Upload the plans, structural and Title 24 energy calculations and forms; full-size sheets are 24 by 36 inches, solar sheets 11 by 17.

5. Pay the plan check fee

City Hall calls with the amount, payable by card.

6. Answer corrections

Upload revisions in the Permit Center.

7. Pay permit fees and receive the permit

Confirm business licenses for the contractor and subcontractors before work starts.

Review, corrections and what causes delay

For most projects the division gives a first review within 10 business days and a second within 5. Residential solar on the standard plan is often approved over the counter; when it is taken in, the solar page gives about one week. Paper submittals, where used, are three plan sets with two sets each of structural and energy calculations. The division notes that Title 24 energy documents are likely needed whenever lighting, mechanical systems or the building envelope change. Tenant improvements without the owner’s authorization letter are not issued.

Inspections in Los Alamitos

Request inspections in the Building Permit Center, which also shows the inspector’s run list of scheduled stops. Inspections run in a morning window from 10 a.m. to noon and an afternoon window from noon to 3:30 p.m.; the division’s older FAQ describes inspections Monday to Thursday starting at 10 a.m. A printable inspection request form is also posted.

Construction is allowed from 7 a.m. to 8 p.m., Monday to Saturday, and not on Sundays or federal holidays. The completed subcontractor list must be on site, or the project will not be finaled. Where the inspector does not enter the home, the owner certifies the smoke and carbon monoxide alarms on the city’s affidavit, and pool projects file the pool barrier compliance form.

California building code in Los Alamitos

The Building and Safety page states the city has enforced the 2025 California Building Standards Code with local amendments since January 1, 2026; an older FAQ answer still lists the 2019 codes. FEMA’s Community Status Book lists Los Alamitos (community 060226) as participating in the National Flood Insurance Program, with a current flood map dated December 3, 2009 that shows flood zones without base flood elevations.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Want this handled start to finish?

Get a free quote →

Los Alamitos building permit FAQ

Who issues building permits in Los Alamitos?

The city’s Building and Safety Division at City Hall, 3191 Katella Avenue (562-431-3538). Fernando Zarate is the Building Official.

Does the city issue permits in Rossmoor?

No. Rossmoor is outside the city; permits there come from the Orange County building department (714-667-8888).

When is the counter open?

Since May 4, 2026, Monday to Thursday from 7:30 to 10:00 a.m., except federal holidays. Most services are online in the Building Permit Center.

How long does plan check take?

About 10 business days for a first review and 5 for a second on most projects. Standard residential solar is often approved over the counter.

Can a homeowner pull a permit?

Yes, for a single-family home or duplex the owner lives in. A non-resident owner is limited to work worth no more than 10% of the building’s value in 12 months.

Do contractors need a city business license?

Yes, and so do their subcontractors; the subcontractor list must be kept on site, and the job will not be finaled without it.

How much is plan check?

65% of the building or plumbing permit fee, 50% of the electrical fee and 25% of the mechanical fee. Residential solar is capped at $450.

Los Alamitos permit search and official resources

Permit holders follow applications, fees and inspections in their Building Permit Center account, and the public inspection run list shows scheduled inspections. Submittal status questions can also be emailed to the division from its web page.

Inspections are where schedules slip.

Get a free quote →

Simplify Los Alamitos permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Los Alamitos sooner?

Let Alliance prepare, file, and track your Los Alamitos permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Los Alamitos permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.