Municipal Guide Arizona Tempe · Maricopa County

Tempe Building Permit — Filed & Tracked For You

Everything contractors, builders, and developers need to pull a City of Tempe building permit — the Building Safety Division and the certified permit technicians who staff its counter, the Citizen Access Portal that all applications must go through, the city's blunt warning about wire transfer fraud, the red permit card that carries your inspection codes, and the interactive voice system behind the inspection queue.

Authority: City of Tempe Community Development DepartmentSubmission: Tempe Citizen Access Portal; online applications onlyPayments: Permit Center, through the portal; never by wire transfer
Online only
Citizen Access PortalAccount required
Never a wire
The city says soTreat any request as fraud
Red permit card
Inspection codesAnd the required list
Certified techs
ICC certifiedStaffing the permit counter

Building permits in Tempe are issued by the Community Development Department through its Building Safety Division, with a Permit Center staffed by International Code Council certified permit technicians. Tempe is landlocked, dense and largely built out, which shapes both the projects and the process.

This guide covers what requires a permit in Tempe, the Citizen Access Portal that all applications must go through, the city's blunt warning about wire transfer fraud, the red permit card carrying your inspection codes, the property line and utility locating obligations, and how the interactive voice inspection system works.

This guide covers work inside the Tempe city limits. Phoenix, Mesa, Chandler, Scottsdale and Guadalupe are separate authorities.

📍

The Community Development Department will never request a wire transfer. Tempe states it plainly: all Building Safety invoices and payments are processed by the Permit Center through the Citizen Access Portal. Any message asking for a wire transfer is fraudulent whatever address it appears to come from. Phone the department to verify anything unexpected before money moves.

What requires a permit in Tempe?

The City of Tempe Community Development Department administers permits and oversees current construction inside the Tempe city limits, with the Building Safety Division carrying the building function. The department covers long-range land planning alongside permitting, with a stated focus on sustainable development, preservation of life safety, private property maintenance, neighbourhood engagement, urban open space, historic preservation and job attraction.

The Permit Center is the front door, and it is staffed by International Code Council certified permit technicians and development services specialists whose role is to guide applicants through the processes relating to development and redevelopment in Tempe. On a city this dense and this constrained, that guidance is worth using early rather than treating the counter as a filing window.

All applications must be submitted online through the Tempe Citizen Access Portal, and a registered account is required to use it. The city publishes a short video on creating an account. There is no parallel paper route for applications, so the portal account is the first practical step on any Tempe project rather than something to sort out when the drawings are ready.

Because Arizona has no statewide building or residential code, what applies in Tempe is what the City Council has adopted, with the amendments published on the city's building code pages and copies of the adopted codes also available at the City Clerk's office. Confirm the editions in force for your submittal date directly with Building Safety — several neighbouring Valley cities have moved editions recently on their own timetables, and secondary summaries of Tempe's position are not reliable.

Permit required

  • New residential and commercial construction, additions and tenant improvements
  • Structural and load-bearing alterations, relocation and demolition
  • Re-roofing and exterior envelope work
  • Room additions and accessory buildings, which may need staked property lines
  • Swimming pools and spas, with barrier compliance
  • Solar photovoltaic systems and battery storage
  • Electrical, plumbing, gas and mechanical work
  • Work affecting historic properties, under the department's preservation remit

Typically exempt

  • Purely cosmetic finish work that alters no regulated system
  • Like-for-like minor repairs not affecting structure or a system
  • Routine maintenance that does not extend or reroute a system
  • Work the city's published homeowner guidance identifies as exempt
⚠️ The Community Development Department will never request a wire transfer. Tempe states it directly: all Building Safety invoices and payments are processed by the Permit Center through the Citizen Access Portal, and the department will never ask for a wire transfer. Any message that does is fraudulent, whatever address it appears to come from. Phone the department to verify anything unexpected before money moves. Several Arizona jurisdictions now publish versions of this warning, and the pattern is always the same: an unexpected invoice and pressure to pay outside the normal channel.

Tempe building department: who handles permitting

Building Safety sits in the City Hall complex on the garden level, east of Mill Avenue between Fifth and Sixth Streets, immediately south-west of the Tempe Transportation Center, with a separate mailing address. Office hours run Monday to Friday, and the city offers free parking validation for the City Hall Parking Garage — on-street metered parking is available but is not reimbursed, which is a small saving worth knowing before you circle the block.

Inspection scheduling runs on an interactive voice response system available around the clock, and inspections can also be scheduled online through the Citizen Access Portal. Through the voice system you enter your permit number and an inspection code, and you can schedule or cancel an inspection and obtain inspection results.

The inspection codes are printed on the red permit card issued with the permit, and the required inspections for your project are listed there too. That card is the working document on a Tempe job site: keep it intact and on site, because without the codes the voice system is unusable and without the list you are guessing at which inspections the job still owes.

Tempe permitting contact
DetailInformation
AuthorityBuilding Safety Division, Community Development Department
Office31 East Fifth Street, Garden Level East, Tempe, AZ 85281
Mailing addressP.O. Box 5002, Tempe, AZ 85280
Phone480-350-4311
HoursMonday to Friday, eight a.m. to five p.m.
ParkingFree validation for the City Hall Parking Garage at 117 East Fifth Street
ApplicationsOnline only, through the Tempe Citizen Access Portal, account required
PaymentsProcessed by the Permit Center through the portal; never by wire transfer
Inspection schedulingInteractive voice response system, or online through the portal
Inspection codesPrinted on the red permit card issued with the permit
💻

Locate your property lines before you design an addition. Tempe makes the point in its homeowner guidance and it matters in a built-out city with older, irregular lots: it is the homeowner's responsibility to locate the property lines, and for some new construction such as room additions or accessory buildings, property lines may have to be staked and certified by a registered surveyor to avoid costly mistakes. Separately, contact the Arizona Blue Stake Center at least two working days before you dig, on the published number or by dialling eight one one.

Tempe is landlocked and its neighbours are close. The city is surrounded by Phoenix, Mesa, Chandler, Scottsdale and Guadalupe, and its boundaries run through continuously developed areas rather than open desert, so there is no visual cue that you have crossed one. Each neighbour adopts its own code editions and runs its own portal, and several have moved editions recently. Confirm jurisdiction from the parcel before assembling anything.

Tempe permits: record types and what each covers

Tempe's record catalog runs through a single online portal, and the residential and commercial paths are documented separately with their own plan review requirements.

Residential permit types

Residential permit types in Tempe
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdPlan review against the jurisdiction's adopted residential code and local amendments, plus zoning and setbacksValuation-based
AdditionAdded conditioned or unconditioned space attached to an existing dwellingStructural and energy review; most of Arizona sits in a hot-dry climate zone, so envelope and equipment sizing draw attentionValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; a change that alters egress, structure, or a system is reviewed even where the footprint does not moveValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDeck and dry-in inspection; plan review rarely required, but a change of assembly type can trigger a structural checkValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageSingle local review covering both the structural attachment and the electrical scope; there is no separate state electrical record in ArizonaFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation, ventilation, and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, meter sets, and rewiringLocal trade review and local inspection against the National Electrical Code edition the jurisdiction has adoptedPer-permit or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementLocal trade review; performed by a contractor holding the matching Registrar of Contractors specialty classificationPer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationLocal trade review; changeout volume is heavy in Arizona given summer design temperaturesPer-permit minimum or per-unit
Patio cover and shade structureAttached and detached covers, ramadas, and carportsStructural review for wind uplift and attachment, plus zoning for setbacks and lot coverageValuation or flat
Swimming poolIn-ground and above-ground pools and spasBarrier, bonding, and electrical review; Arizona sets a statewide minimum pool barrier standard that applies on top of local rulesValuation or flat
Manufactured home set-upPlacing or re-siting a manufactured or modular homeState plan approval through the Arizona Department of Housing, with local zoning, floodplain, foundation, and utility connection reviewFlat or per-unit
DemolitionFull or partial demolition of a dwelling or accessory structureUtility disconnect confirmation, dust control where earthmoving is involved, and site restoration checkFlat
Accessory building permitDetached structures on a residential lotMay require property lines staked and certified by a registered surveyorValuation-based under the adopted fee schedule
Room additionAdditions to an existing dwellingProperty line location is the owner's responsibility; staking may be requiredValuation-based under the adopted fee schedule

Commercial permit types

Commercial permit types in Tempe
Permit typeWhat triggers itReview pathFee basis
New commercial constructionGround-up commercial, industrial, and institutional buildingsConcurrent review against the jurisdiction's adopted building code and amendments, plus fire and zoningValuation-based
Tenant improvement / upfitInterior fit-out of an existing tenant spaceBuilding, trade, and life-safety review; accessibility attaches on change of useValuation-based
Change of occupancyConverting a building or space to a different use groupOccupancy classification, egress, and accessibility reviewValuation or flat
Commercial electricalService, distribution, and branch circuit workLocal trade review and local inspection; Arizona has no central state electrical permit for either residential or commercial workPer-permit or valuation
Commercial plumbingProcess piping, fixtures, backflow, and grease wasteLocal trade review; backflow and grease interceptor sign-off where applicablePer-fixture or valuation
Commercial mechanicalRooftop units, kitchen exhaust and hood systems, and refrigerationLocal trade review; hood and suppression systems draw fire review alongside mechanicalPer-unit or valuation
Commercial reroofRoof covering replacement on a commercial structureDeck, dry-in, and attachment inspectionValuation or squares
SignageWall, ground, and illuminated signsZoning review for size and placement, plus electrical where illuminatedFlat or per-sign
Grading and drainageClearing, grading, and site work that alters drainageCivil review of grading and drainage, separate from the building permit; monsoon-season flows drive the designAcreage or valuation
Dust control permitEarthmoving, trenching, and construction dust on a qualifying siteCounty air quality department, not the building department; required in the fine-particulate nonattainment areasCounty air quality fee schedule
Commercial demolitionFull or partial demolition of a commercial structureUtility disconnect, asbestos notification, dust control, and site restorationFlat or valuation
Commercial tenant improvementInterior fit-out of an existing commercial spaceFiled online through the Citizen Access Portal with a registered accountValuation-based under the adopted fee schedule
Historic preservation reviewWork affecting historic properties within the department's remitReviewed alongside the building recordPer the adopted fee schedule

Residential

  • Building and trade permits are issued and inspected by the same local authority
  • There is no separate state electrical permit — electrical is a local record
  • A Registrar of Contractors licence is required whenever a permit is required, at any job value
  • Properties on septic need on-site wastewater approval before ground is broken

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • The licensee's classification must match the actual scope of work
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Tempe

Tempe record catalog
RecordWhat it covers
Building permitNew construction, additions, alterations and demolition in the city limits
Single-family residential permitResidential work under the city's published residential process
Commercial permitCommercial construction and tenant improvement work
Trade permitElectrical, plumbing, gas and mechanical by the licensed contractor
Solar photovoltaic permitArrays, inverters and battery storage
Re-roof permitRoof covering replacement and structural deck repair
Swimming pool and spa permitPools, spas and required barrier compliance
Accessory building permitDetached structures, which may require staked property lines
Historic preservation reviewWithin the department's preservation remit

Solar permits in Tempe

Solar is reviewed on two tracks in Arizona, but unlike some neighbouring states both tracks belong to the same government. The structural side — attachment detail, rail spacing, and whether the existing framing carries the added dead load — and the electrical side — conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection — are both permitted and inspected by the local Authority Having Jurisdiction. There is no state electrical record to buy alongside the local one, and no state inspector to book.

Solar work in Tempe is permitted and inspected by the city, with the structural attachment and the electrical scope reviewed together and nothing filed with the state. Confirm the electrical code edition Tempe has adopted for your submittal date rather than carrying an assumption from Mesa or Chandler, both of which have moved to newer editions on their own schedules. On multi-family and student housing — a large share of Tempe's stock — plan roof access for the inspection in advance rather than assuming it on the day.

What varies instead is the code edition. Because each Arizona city, town and county adopts its own editions on its own timetable, the National Electrical Code edition your array is judged against in one jurisdiction may not be the one enforced a few miles away. The Office of the State Fire Marshal sets a minimum electrical standard for the state, but the edition actually enforced is the local one. Confirm it with the jurisdiction before the design is finalised rather than after a correction notice.

Interconnection runs on a third clock and is not something the building department controls. Arizona properties are served by utilities including Arizona Public Service, Salt River Project, Tucson Electric Power and UniSource, alongside municipal utilities and irrigation districts, and each sets its own application, meter and witness-test sequence. Permission to operate follows the utility's process on the utility's schedule, so plan for the tracks to finish at different times.

Roofing permits in Tempe

A roof covering replacement needs a permit in most Arizona jurisdictions, and the assumption that a like-for-like replacement is exempt travels badly here. The permit is usually quick, but the inspection that matters happens before the covering goes on rather than after.

Arizona operates no statewide product-approval database, so there is no approval number to search for or cite on the application. The assembly has to comply with the edition of the code the jurisdiction has adopted and with the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

Reroofing is permitted work and follows the ordinary sequence, with the deck and dry-in inspected before the covering goes on. The practical Tempe detail is the red permit card: it carries the inspection codes needed by the interactive voice system and the list of inspections the project requires, so keeping it intact and on site is what makes booking possible at all. Tempe roofing is designed against heat, ultraviolet exposure and monsoon wind and rain rather than snow.

Two Arizona-specific pressures shape the work. Sustained summer heat and ultraviolet exposure age a covering faster than the same assembly would age in a milder climate, and monsoon-season wind and driven rain test the fastening and the flashing details rather than the field of the roof. Sequencing is where reroofs go wrong regardless: the deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Tempe permit cost

Tempe assesses permit fees under the city's adopted fee schedule, with building fees driven by valuation and plan review assessed alongside, and trade permits charged per discipline. All Building Safety invoices and payments are processed by the Permit Center through the Citizen Access Portal, which is both the convenience and the fraud control.

One cost sits outside the permit and is easy to overlook on a residential addition: where property lines have to be staked and certified by a registered surveyor, that is a survey fee incurred before design is finalised. In a city with older lots and tight setbacks it is money well spent rather than an optional extra.

How Tempe fees are structured
Fee componentHow it works
Building permit feeValuation-based under the city's adopted fee schedule
Plan review feeAssessed alongside the building permit fee
Trade permitsElectrical, plumbing, gas and mechanical charged per discipline
Payment channelPermit Center, through the Citizen Access Portal only
Survey costsWhere property lines must be staked and certified, borne by the applicant
Re-inspection feeCharged where an inspection has to be repeated
Wire transfersNever requested; treat any such request as fraudulent
🧮

Want a precise number for a specific Tempe project? Send us the scope and we will price the permit path before you file.

Tempe trade permits

The trades are permitted and inspected by the city under its adopted codes and local amendments. Arizona has no state electrical permit, so the whole job sits with Community Development.

Electrical permits

Required for service work, panel changes, photovoltaic systems, electric vehicle chargers and most wiring alterations. Confirm the National Electrical Code edition Tempe has adopted for your submittal date rather than carrying an assumption from Mesa or Chandler, both of which have moved to newer editions on their own schedules.

Plumbing permits

Required for new piping, repipes, fixtures and water heaters. Tempe's housing stock includes a large share of older properties where a repipe or a fixture relocation is common, and relocating a fixture is what takes a remodel out of the cosmetic exemption.

Mechanical permits

Required for heating, ventilation and air-conditioning installations, changeouts, ductwork and refrigeration. Given the density of multi-family and student housing in Tempe, equipment replacement volume is high and access arrangements for inspection deserve planning.

Pool, spa and barrier permits

Pools and spas are permitted work and Arizona's statewide minimum pool barrier standard applies alongside the city's requirements. Barrier compliance is inspected before the pool is put into use, and the bonding scope forms part of the electrical record.

🧢 Arizona licenses contractors through the state Registrar of Contractors (the ROC), and the rule is uniform across the state: a licence is required whenever a job's labour and materials exceed one thousand dollars, or whenever a building permit is required at all — a permitted job needs a licensed contractor regardless of its dollar value. The ROC licence is a state licence that is valid statewide, so there is no separate city or county contractor licence, though a municipality may require its own business licence. The one thousand dollar exemption covers only work that both stays under that combined labour-and-materials figure and does not require a permit. The moment a permit is required, a licensed contractor is required, whatever the price.

Tempe permit application: how to apply step by step

Here is how to get a building permit in Tempe, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Confirm the parcel is in Tempe

The city is landlocked and surrounded by Phoenix, Mesa, Chandler, Scottsdale and Guadalupe, with no visual cue at the boundary. Settle jurisdiction from the parcel.

2. Create the portal account first

All applications must be submitted online through the Citizen Access Portal and a registered account is required. The city publishes a video on creating one. Do this before the drawings are finished.

3. Confirm the adopted editions

Ask Building Safety which editions and amendments apply to your submittal date. Copies of the adopted codes are also available at the City Clerk's office, and secondary summaries of Tempe's position are not reliable.

4. Sort out property lines and utilities before you dig

Locating property lines is the owner's responsibility, and room additions or accessory buildings may need lines staked and certified by a registered surveyor. Contact Arizona Blue Stake at least two working days before digging.

5. Submit, and pay only through the portal

All Building Safety invoices and payments are processed by the Permit Center through the portal. The department will never request a wire transfer — treat any such request as fraud and verify by phone.

6. Keep the red card and inspect through close-out

The red permit card carries your inspection codes and the list of required inspections. Keep it on site, book through the voice system or the portal, and work the sequence to the occupancy certificate.

Inspections in Tempe

Building inspections are scheduled through the city's interactive voice response system, available around the clock, or online through the Citizen Access Portal. Through the voice system you can schedule an inspection, cancel one, and obtain inspection results, using your permit number and the relevant inspection code.

The inspection codes are on the red permit card provided when the permit is issued, along with the list of inspections the project requires. Losing that card is genuinely disruptive rather than merely inconvenient, because it carries the two pieces of information the scheduling system needs and the record of what the job still owes.

The purpose of plan review in Tempe is to determine compliance with the codes and ordinances the city has adopted, and once construction documents are determined to be in compliance a permit may be issued. Field inspections then test whether what was built matches what was approved — which is why deviating from the approved set in the field creates a problem at inspection rather than a conversation.

Close-out follows the ordinary sequence to the occupancy certificate once every inspection listed on the permit card has passed. In a dense, built-out city, plan inspection access on multi-family and infill sites in advance rather than assuming the inspector can reach the work.

Tempe permit search and official resources

These are the primary City of Tempe and Arizona sources behind this guide. Adopted editions and fee schedules change by council action, so confirm against these pages before you file.

Frequently asked questions

How do I apply for a building permit in Tempe?

Online. All applications must be submitted through the Tempe Citizen Access Portal, and a registered account is required to use it. The city publishes a short video on creating an account. There is no parallel paper application route, so the portal account is the first practical step on any Tempe project.

Will the city ever ask me to pay by wire transfer?

No. Tempe states plainly that all Building Safety invoices and payments are processed by the Permit Center through the Citizen Access Portal, and that the Community Development Department will never request a wire transfer. Any message asking for one is fraudulent regardless of the address it appears to come from. Phone the department to verify anything unexpected.

Which codes does Tempe enforce?

Those adopted by the City Council with local amendments, published on the city's building code pages, with copies of the adopted codes also available at the City Clerk's office. Arizona has no statewide building or residential code and several neighbouring cities have moved editions recently, so confirm Tempe's position for your submittal date directly with Building Safety.

How do I schedule a Tempe inspection?

Through the interactive voice response system, which is available around the clock, or online through the Citizen Access Portal. The voice system needs your permit number and an inspection code, and it will let you schedule, cancel and obtain results.

Where do I find my inspection codes?

On the red permit card provided when the permit is issued. The card also lists the inspections your project requires. Keep it intact and on site — without the codes the scheduling system is unusable, and without the list you are guessing at what the job still owes.

Do I need to stake my property lines?

Possibly. It is the homeowner's responsibility to locate property lines, and the city notes that for some new construction such as room additions or accessory buildings, property lines may have to be staked and certified by a registered surveyor to avoid costly mistakes. In a built-out city with older lots that is money well spent.

What do I do before digging?

Contact the Arizona Blue Stake Center, on its published number or by dialling eight one one, at least two working days before you dig, and request that all underground utilities be located. This applies whether or not the work itself needs a permit.

Who staffs the Permit Center?

International Code Council certified permit technicians and development services specialists, whose stated role is to guide applicants through the varied processes relating to development and redevelopment in Tempe. Use them early rather than treating the counter as a filing window.

Where is Tempe Building Safety and where do I park?

The Building Safety Division is in the City Hall complex on the garden level, east of Mill Avenue between Fifth and Sixth Streets, immediately south-west of the Tempe Transportation Center. The city offers free parking validation for the City Hall Parking Garage; on-street metered parking is available but is not reimbursed.

Are accessory dwelling units allowed in Tempe?

Tempe is above the seventy-five thousand population threshold in Arizona's twenty twenty-four accessory dwelling unit statute, so the statewide floor applies: at least one attached and one detached unit as a permitted use on any lot where a single-family dwelling is allowed, capped at seventy-five per cent of the main dwelling's gross floor area or one thousand square feet, whichever is less. The city cannot require extra parking or owner-occupancy; private covenants still bind.

How long will my Tempe review take?

Arizona law requires every municipality to publish an overall time frame for each permit type it issues, split into an administrative completeness review and a substantive review. If the city does not issue a notice of completeness or of deficiencies within the completeness window, the application is deemed administratively complete by operation of law — complete, note, not approved.

What is the purpose of plan review here?

The city describes it as determining compliance with the codes and ordinances adopted by the City of Tempe. Once the construction documents are determined to be in compliance, a permit may be issued. Field inspections then confirm that what was built matches what was approved, which is why field deviations create problems at inspection.

Simplify Tempe permitting with Alliance Permitting

Tempe is a straightforward department to work with once the portal account exists and the code position is confirmed — and it is one of the clearest in the state about how it will and will not ask you for money. Alliance Permitting prepares, files and tracks City of Tempe permits through issuance.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Tempe because the work is done by people who have stood at the counter:

  • We set up the portal account before drawings are finished, since there is no paper route.
  • We confirm the adopted editions with Building Safety rather than trusting a secondary summary.
  • We keep every payment inside the Permit Center's portal channel, as the city requires.
  • We track the red permit card's inspection list so nothing on it is missed at close-out.

Alliance Permitting is a permit documentation and expediting service in Arizona. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Tempe sooner?

Let Alliance prepare, file, and track your Tempe permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Tempe permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.

Expedite Your Permits Today!

Free Quote1-855-478-4290