Municipal Guide Arizona Maricopa County · Arizona

Maricopa County Building Permit — Filed & Tracked For You

Everything contractors, builders, and developers need to pull a Maricopa County building permit — how Planning and Development works in the unincorporated county, the Permit Center that consolidated four departments' permitting into one system, the named programmes that can genuinely shorten a job, the drainage and floodplain track that runs alongside, and why the county's codes are not the city's.

Authority: Maricopa County Planning and Development DepartmentJurisdiction: Unincorporated Maricopa County onlySubmission: Permit Center, shared with three other county departments
Authority
Planning and DevelopmentUnincorporated county only
Apply
Permit CenterFour departments, one platform
Programmes
Fast Track and othersPublished by name
Solar
SolarAPPFor eligible rooftop arrays

Building permits in unincorporated Maricopa County are issued by the Planning and Development Department, which provides land use planning and entitlement, building permit review and inspection, and code compliance. In Arizona's most urbanised county, the unincorporated qualifier does most of the work: more than twenty cities permit their own construction.

This guide covers what requires a permit in unincorporated Maricopa County, the Permit Center that consolidated four departments' permitting into one platform, the named programmes that change the process rather than just its speed, the drainage and floodplain track, and why the county's codes are not the city's.

This guide covers unincorporated Maricopa County. The cities within it, and the City of Maricopa in Pinal County, are all separate.

📍

The county cannot publish the code books, but it does publish its amendments. Planning and Development states that because the codes are owned and copyrighted by the code bodies, it cannot provide them on its website, and directs customers to a library or to purchase a copy. What it does publish is its own local additions and addenda — and those are precisely the part that differs from the city next door, so read them even if you know the model code well.

What requires a permit in Maricopa County?

The Maricopa County Planning and Development Department provides land use planning and entitlement, building permit review and inspection, and code compliance for unincorporated Maricopa County. That qualifier is the whole story in the most urbanised county in Arizona: Phoenix, Mesa, Chandler, Glendale, Scottsdale, Gilbert, Tempe, Peoria, Surprise, Buckeye, Goodyear, Avondale, Queen Creek and many more all permit their own work, and the county permits what is left.

The county puts the case for permitting plainly rather than bureaucratically: the value and safety of a structure rely heavily on obtaining a building permit before construction, and the permit is your assurance that both the plans and the finished structure will be inspected for minimum code safety. Residential and commercial development activity and land use are both regulated.

Since June twenty twenty-four the department has run on Permit Center, an online system that consolidated permitting across several county departments into one platform. It covers Environmental Services, Planning and Development, the Flood Control District and the Department of Transportation. Air Quality permits continue in the system they previously used. Every user registers with a unique email address, and all new permit and plan applications go through it.

Zoning comes from a separate instrument again. The county Zoning Ordinance is adopted under the county planning and zoning enabling statutes in the state's counties title, and the county updated it recently — planning and permitting applications have been reviewed against the updated version since early twenty twenty-six, with the previous version retained as a superseded copy. Check which version your application falls under if it straddles the change.

Permit required

  • New residential and commercial construction, additions and alterations
  • Structural work, relocation and demolition in the unincorporated county
  • Electrical service replacement or upgrade, and main breaker derates
  • Gas line repair or replacement, and minor plumbing repairs
  • Sewer and septic lines, and gas or electrical clearances
  • Rooftop and ground-mounted solar photovoltaic systems
  • Grading, drainage and floodplain work under the drainage review track
  • Masonry or concrete walls and retaining walls above the published limits

Typically exempt

  • Work identified as exempt on the county's local additions and addenda
  • Minor in-kind repairs to non-structural components
  • Non-structural exterior weatherproof covering that does not change a fire-resistance rating
  • Temporary-use structures standing less than the published number of consecutive hours
⚠️ The county does not publish the code books, and that is deliberate. Planning and Development states that because the various codes are owned and copyrighted by the International Code Council or the National Fire Protection Association, it cannot provide them on its website, and directs customers to a local library or to purchase a copy. What the county does publish is its own local additions and addenda — the amendments that change the model code. Those amendments are the part that differs from the city next door, so read them even if you know the model code well.

Maricopa County building department: who handles permitting

Permit Center is the practical centre of gravity here. It is described as the county's one-stop online shop for Environmental Services, Planning and Development, Transportation and Flood Control permitting, planning and operational permitting activities, including reviews, inspections and invoice payments. On a rural parcel that needs a building permit, a septic review, a floodplain clearance and a driveway permit, that consolidation is the difference between one relationship and four.

The department publishes a set of named programmes under the heading of featured permitting solutions, and they are worth knowing by name because each one changes the process rather than merely speeding it up: Fast Track, Permit By Inspector, Annual Facilities Permit and Standard Plans. There is also a set of express permits that can be applied for directly — electrical service replacement or upgrade, main breaker derate for photovoltaic preparation, minor electrical repairs, gas line repair or replacement, minor plumbing repairs, gas and electrical clearances, and sewer or septic lines.

Two published outputs are useful beyond your own project. The county publishes weekly permit reports covering building and construction within its jurisdiction, with an archive of previous weeks, offered without warranty as to accuracy. And a Building Code Advisory Board meets publicly on code matters, with stakeholder input invited on the adoption and amendment of regulatory requirements — which is the route in if you want to influence rather than merely comply.

Maricopa County permitting contact
DetailInformation
AuthorityPlanning and Development Department, unincorporated Maricopa County
Permit Center602-506-3301
Portal scopeEnvironmental Services, Planning and Development, Flood Control, Transportation
Not in Permit CenterAir Quality permits, which remain in their previous system
RegistrationEach user registers with a unique email address
Named programmesFast Track, Permit By Inspector, Annual Facilities Permit, Standard Plans
SolarSolarAPP available for eligible residential rooftop photovoltaic permits
Code booksNot published online; copyright rests with the code bodies
Published dataWeekly permit reports, with an archive
Appeals and code policyBuilding Code Advisory Board, meeting publicly
💻

Eligible residential rooftop solar can run through SolarAPP. The county offers customers the ability to use the automated solar permitting platform for eligible residential rooftop photovoltaic permits, with eligibility criteria published on its own page. That is instant or near-instant permitting for a standard array rather than a review queue, and it is one of the few genuinely automated permitting routes available anywhere in Arizona. Check the criteria before assuming a given array qualifies — non-standard configurations fall back to the ordinary review.

Maricopa County permits only the unincorporated county — and it is not the City of Maricopa. Two separate confusions live here. First, the great majority of development in this county happens inside incorporated cities that permit their own work under their own adopted editions, so a Maricopa County address usually means a city permit. Second, the City of Maricopa is a different jurisdiction entirely, located in Pinal County. Settle the parcel before anything else.

Maricopa County permits: record types and what each covers

The county's record catalog is unusually well labelled, because the featured permitting solutions are published by name rather than buried in a process document.

Residential permit types

Residential permit types in Maricopa
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdPlan review against the jurisdiction's adopted residential code and local amendments, plus zoning and setbacksValuation-based
AdditionAdded conditioned or unconditioned space attached to an existing dwellingStructural and energy review; most of Arizona sits in a hot-dry climate zone, so envelope and equipment sizing draw attentionValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; a change that alters egress, structure, or a system is reviewed even where the footprint does not moveValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDeck and dry-in inspection; plan review rarely required, but a change of assembly type can trigger a structural checkValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageSingle local review covering both the structural attachment and the electrical scope; there is no separate state electrical record in ArizonaFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation, ventilation, and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, meter sets, and rewiringLocal trade review and local inspection against the National Electrical Code edition the jurisdiction has adoptedPer-permit or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementLocal trade review; performed by a contractor holding the matching Registrar of Contractors specialty classificationPer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationLocal trade review; changeout volume is heavy in Arizona given summer design temperaturesPer-permit minimum or per-unit
Patio cover and shade structureAttached and detached covers, ramadas, and carportsStructural review for wind uplift and attachment, plus zoning for setbacks and lot coverageValuation or flat
Swimming poolIn-ground and above-ground pools and spasBarrier, bonding, and electrical review; Arizona sets a statewide minimum pool barrier standard that applies on top of local rulesValuation or flat
Manufactured home set-upPlacing or re-siting a manufactured or modular homeState plan approval through the Arizona Department of Housing, with local zoning, floodplain, foundation, and utility connection reviewFlat or per-unit
DemolitionFull or partial demolition of a dwelling or accessory structureUtility disconnect confirmation, dust control where earthmoving is involved, and site restoration checkFlat
SolarAPP permitEligible residential rooftop photovoltaic systemsAutomated permitting under published eligibility criteriaPer the county's adopted fee schedule
Express permitService upgrades, minor repairs, gas lines, sewer and septic linesApplied for directly rather than through full plan reviewPer the county's adopted fee schedule

Commercial permit types

Commercial permit types in Maricopa
Permit typeWhat triggers itReview pathFee basis
New commercial constructionGround-up commercial, industrial, and institutional buildingsConcurrent review against the jurisdiction's adopted building code and amendments, plus fire and zoningValuation-based
Tenant improvement / upfitInterior fit-out of an existing tenant spaceBuilding, trade, and life-safety review; accessibility attaches on change of useValuation-based
Change of occupancyConverting a building or space to a different use groupOccupancy classification, egress, and accessibility reviewValuation or flat
Commercial electricalService, distribution, and branch circuit workLocal trade review and local inspection; Arizona has no central state electrical permit for either residential or commercial workPer-permit or valuation
Commercial plumbingProcess piping, fixtures, backflow, and grease wasteLocal trade review; backflow and grease interceptor sign-off where applicablePer-fixture or valuation
Commercial mechanicalRooftop units, kitchen exhaust and hood systems, and refrigerationLocal trade review; hood and suppression systems draw fire review alongside mechanicalPer-unit or valuation
Commercial reroofRoof covering replacement on a commercial structureDeck, dry-in, and attachment inspectionValuation or squares
SignageWall, ground, and illuminated signsZoning review for size and placement, plus electrical where illuminatedFlat or per-sign
Grading and drainageClearing, grading, and site work that alters drainageCivil review of grading and drainage, separate from the building permit; monsoon-season flows drive the designAcreage or valuation
Dust control permitEarthmoving, trenching, and construction dust on a qualifying siteCounty air quality department, not the building department; required in the fine-particulate nonattainment areasCounty air quality fee schedule
Commercial demolitionFull or partial demolition of a commercial structureUtility disconnect, asbestos notification, dust control, and site restorationFlat or valuation
Annual Facilities PermitOngoing work at an established facility in the unincorporated countyReplaces permitting each small job individuallyPer the county's adopted fee schedule
Standard PlansRepeated builds using a pre-reviewed plan setReviewed once and reused across multiple permitsPer the county's adopted fee schedule

Residential

  • Building and trade permits are issued and inspected by the same local authority
  • There is no separate state electrical permit — electrical is a local record
  • A Registrar of Contractors licence is required whenever a permit is required, at any job value
  • Properties on septic need on-site wastewater approval before ground is broken

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • The licensee's classification must match the actual scope of work
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Maricopa

Maricopa record catalog
RecordWhat it covers
Building permitConstruction, alteration and demolition in the unincorporated county
Fast TrackA published programme for moving qualifying projects through more quickly
Permit By InspectorA published route where an inspector handles the permitting of qualifying work
Annual Facilities PermitFor ongoing work at an established facility rather than permit by permit
Standard PlansPre-reviewed plans reused across multiple builds
Express permitService upgrades, minor electrical and plumbing repairs, gas lines, sewer and septic lines
SolarAPP permitEligible residential rooftop photovoltaic systems, automated
Floodplain and drainage clearanceThrough the Flood Control District
Subdivision platPreliminary and final plat, approved administratively then signed by the Board

Solar permits in Maricopa

Solar is reviewed on two tracks in Arizona, but unlike some neighbouring states both tracks belong to the same government. The structural side — attachment detail, rail spacing, and whether the existing framing carries the added dead load — and the electrical side — conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection — are both permitted and inspected by the local Authority Having Jurisdiction. There is no state electrical record to buy alongside the local one, and no state inspector to book.

Maricopa County offers one of the few genuinely automated solar permitting routes in Arizona: eligible residential rooftop photovoltaic systems can be permitted through the SolarAPP platform under published eligibility criteria, rather than waiting in a review queue. Non-standard configurations fall back to ordinary review. The county also publishes a specific express permit for a main breaker derate for photovoltaic preparation — an unusually thoughtful provision for retrofits on constrained services. Interconnection remains on the serving utility's own timetable.

What varies instead is the code edition. Because each Arizona city, town and county adopts its own editions on its own timetable, the National Electrical Code edition your array is judged against in one jurisdiction may not be the one enforced a few miles away. The Office of the State Fire Marshal sets a minimum electrical standard for the state, but the edition actually enforced is the local one. Confirm it with the jurisdiction before the design is finalised rather than after a correction notice.

Interconnection runs on a third clock and is not something the building department controls. Arizona properties are served by utilities including Arizona Public Service, Salt River Project, Tucson Electric Power and UniSource, alongside municipal utilities and irrigation districts, and each sets its own application, meter and witness-test sequence. Permission to operate follows the utility's process on the utility's schedule, so plan for the tracks to finish at different times.

Roofing permits in Maricopa

A roof covering replacement needs a permit in most Arizona jurisdictions, and the assumption that a like-for-like replacement is exempt travels badly here. The permit is usually quick, but the inspection that matters happens before the covering goes on rather than after.

Arizona operates no statewide product-approval database, so there is no approval number to search for or cite on the application. The assembly has to comply with the edition of the code the jurisdiction has adopted and with the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

Reroofing in the unincorporated county follows the ordinary sequence, with the deck and dry-in condition available for inspection before the covering goes on. Desert roofing here is designed against sustained heat, ultraviolet exposure and monsoon-driven wind and rain rather than snow. Check the county's local additions and addenda for the exemption position rather than importing a city rule — the county's exemptions include non-structural exterior weatherproof covering over existing work where the fire-resistance rating is unchanged, which is narrower than it sounds.

Two Arizona-specific pressures shape the work. Sustained summer heat and ultraviolet exposure age a covering faster than the same assembly would age in a milder climate, and monsoon-season wind and driven rain test the fastening and the flashing details rather than the field of the roof. Sequencing is where reroofs go wrong regardless: the deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Maricopa County permit cost

County permit fees are assessed under the adopted fee schedule, with building fees valuation-driven and plan review assessed alongside. Invoice payment runs through Permit Center along with reviews and inspections, so the whole financial side of a permit sits in one place rather than across departments.

The costs that surprise people on unincorporated land are the ones that are not building permit fees at all. Drainage administration and floodplain clearances come through the Flood Control District, transportation and access work through the Department of Transportation, and on-site wastewater through Environmental Services. All four now bill through the same system, which makes them visible — but they are still four separate scopes to budget.

How Maricopa fees are structured
Fee componentHow it works
Building permit feeValuation-based under the county's adopted fee schedule
Plan reviewAssessed alongside the building permit
Drainage and floodplainFlood Control District scope, billed through the same system
Transportation and accessDepartment of Transportation permits, billed through the same system
On-site wastewaterEnvironmental Services scope, assessed separately
Express permitsNamed minor records applied for directly
Air QualityManaged and billed in its own separate system
🧮

Want a precise number for a specific Maricopa project? Send us the scope and we will price the permit path before you file.

Maricopa County trade permits

The trades are permitted and inspected by the county in the unincorporated area under its adopted codes and local addenda. Arizona has no state electrical permit, so nothing is filed with the state alongside.

Electrical permits

Required for service work, panel changes, photovoltaic systems, electric vehicle chargers and most wiring alterations. The county runs express permits for several common electrical records, including service replacement or upgrade and main breaker derate for photovoltaic preparation — the latter being a specific and unusually thoughtful provision for solar retrofits on constrained services.

Plumbing and gas permits

Required for new piping, repipes, fixtures and gas work, with express permits published for gas line repair or replacement, minor plumbing repairs, and sewer and septic lines. On unincorporated land the wastewater scope connects to Environmental Services rather than sitting wholly within the building permit.

Mechanical permits

Required for heating, ventilation and air-conditioning installations, changeouts, ductwork and refrigeration, including rooftop equipment. Desert conditions drive both the equipment sizing and the structural support detail for rooftop units.

Drainage and floodplain

Not a trade, but it governs whether a rural project is buildable at all. Drainage administration is one of the regulatory activities the department provides, and floodplain clearances come through the Flood Control District. Establish the drainage position before design rather than at review.

🧢 Arizona licenses contractors through the state Registrar of Contractors (the ROC), and the rule is uniform across the state: a licence is required whenever a job's labour and materials exceed one thousand dollars, or whenever a building permit is required at all — a permitted job needs a licensed contractor regardless of its dollar value. The ROC licence is a state licence that is valid statewide, so there is no separate city or county contractor licence, though a municipality may require its own business licence. The one thousand dollar exemption covers only work that both stays under that combined labour-and-materials figure and does not require a permit. The moment a permit is required, a licensed contractor is required, whatever the price.

Maricopa County permit application: how to apply step by step

Here is how to get a building permit in Maricopa County, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Confirm the parcel is unincorporated

Most development in this county is inside a city that permits its own work. Establish from the parcel that the county is the authority before assembling anything, and do not confuse Maricopa County with the City of Maricopa in Pinal County.

2. Register on Permit Center

Each user registers with a unique email address. The system covers Planning and Development, Environmental Services, Flood Control and Transportation — but not Air Quality, which remains separate.

3. Read the local additions and addenda

The county cannot publish the copyrighted model codes, but it does publish its own amendments. Those are the part that differs from the neighbouring city, and they are where the exemptions live.

4. Check whether a named programme fits

Fast Track, Permit By Inspector, Annual Facilities Permit and Standard Plans each change the process. For a standard residential rooftop array, check SolarAPP eligibility.

5. Scope drainage early

Drainage administration and floodplain clearance can determine whether and how a rural parcel can be built on. Deal with the Drainage Review requirements before the design is fixed.

6. Submit, pay and inspect through Permit Center

Applications, reviews, invoice payments and inspections all run in the same platform. Keep the permit and approved plans on site through the inspection sequence.

Inspections in Maricopa County

Inspections are requested through Permit Center alongside reviews and payments. Because four county departments share the platform, the status of a drainage clearance or a transportation permit is visible in the same place as the building record — which on a rural project is a genuine advantage over chasing departments separately.

The county's featured permitting programmes affect inspection as much as review. Permit By Inspector in particular changes who does what, and an Annual Facilities Permit changes the rhythm of inspection at an established site from project-by-project to something continuous. If you operate a facility in the unincorporated county, that is worth investigating rather than permitting each small job individually.

The published weekly permit reports are a reminder that permit activity here is a public record. That cuts both ways: it is a useful market signal if you are tracking development in the unincorporated county, and it means unpermitted work is discoverable by its absence from the record as much as by its presence on the ground.

Close-out follows the ordinary sequence through to the occupancy certificate once every required inspection has passed. Where the project involved drainage, floodplain, transportation or wastewater scopes, expect those to need clearing alongside the building items — which is easier now that they share a system, but still four separate approvals.

Maricopa County permit search and official resources

These are the primary Maricopa County and Arizona sources behind this guide. Zoning ordinance versions and fee schedules change on Board action, so confirm against these pages before you file.

Frequently asked questions

Does Maricopa County permit my project?

Only if the parcel is in the unincorporated county. Planning and Development provides land use planning and entitlement, building permit review and inspection, and code compliance for unincorporated Maricopa County. Most development in this county happens inside cities that permit their own work under their own adopted editions.

Is Maricopa County the same as the City of Maricopa?

No, and this is a common and expensive confusion. The City of Maricopa is a separate municipality located in Pinal County, roughly an hour south-east of central Phoenix, with its own portal, codes and fee schedule. Maricopa County is a different government in a different county.

What is Permit Center?

The county's online permitting system, launched in June twenty twenty-four, which consolidated permitting across several county departments into one platform. It covers Environmental Services, Planning and Development, the Flood Control District and the Department of Transportation, and handles reviews, inspections and invoice payments. Air Quality permits remain in their previous system.

Why can I not find the building code on the county website?

Because the county cannot publish it. Planning and Development states that the codes are owned and copyrighted by the International Code Council or the National Fire Protection Association, and directs customers to a local library or to purchase a copy. What the county does publish is its own local additions and addenda — the amendments, which are the part that differs from the city next door.

What are Fast Track and Permit By Inspector?

Two of the county's published featured permitting solutions, alongside the Annual Facilities Permit and Standard Plans. Each changes the process rather than merely speeding it up, and the county publishes them by name precisely so applicants can find the route that fits. Check the current criteria for each before building a programme around one.

Can I get an automated solar permit?

For eligible residential rooftop photovoltaic systems, yes — the county offers the SolarAPP automated permitting platform with published eligibility criteria. It is one of the few genuinely automated permitting routes in Arizona. Non-standard configurations fall back to ordinary review, so check eligibility rather than assuming.

What is an express permit?

A set of named minor records the county lets you apply for directly, including electrical service replacement or upgrade, main breaker derate for photovoltaic preparation, minor electrical repairs, gas line repair or replacement, minor plumbing repairs, gas and electrical clearances, and sewer or septic lines.

Do the state accessory dwelling unit rules apply in the county?

No. Arizona's twenty twenty-four accessory dwelling unit statute sits in the state's cities and towns title and binds municipalities above a population threshold. It does not reach counties at all, whatever the county's population. Accessory dwelling units in unincorporated Maricopa County are governed by the county Zoning Ordinance.

Which zoning ordinance version applies to me?

The county updated its Zoning Ordinance and has been reviewing planning and permitting applications against the updated version since early twenty twenty-six, with the previous version retained as a superseded copy. If your application straddles the change, confirm which version governs.

What about drainage and floodplain?

Drainage administration is one of the regulatory activities Planning and Development provides for the unincorporated county, and floodplain matters run through the Flood Control District, which now shares the same permitting platform. On a rural parcel drainage can determine what is buildable, so establish it before design rather than at review.

How do I influence a county code amendment?

Through the Building Code Advisory Board, which meets publicly on code matters, and through the stakeholder input the county invites on the adoption and amendment of regulatory requirements. That is the route in if you want to shape the rules rather than only comply with them.

Where can I see county permit activity?

The county publishes weekly permit reports covering building and construction within its jurisdiction, with an archive of earlier weeks. The data is offered without warranty as to accuracy, but it is a genuine public record of activity in the unincorporated county.

Simplify Maricopa County permitting with Alliance Permitting

Maricopa County is the most programme-rich permitting authority in the state — Fast Track, Permit By Inspector, Standard Plans, express permits and automated solar all exist, and most applicants use none of them. Alliance Permitting prepares, files and tracks Maricopa County permits through issuance.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Maricopa because the work is done by people who have stood at the counter:

  • We confirm the parcel is unincorporated before anything else, since most of this county is not.
  • We match the project to the right named programme rather than defaulting to a standard permit.
  • We scope drainage and floodplain early, because on rural parcels they decide what is buildable.
  • We run the whole file through Permit Center so the four departments' scopes stay visible together.

Alliance Permitting is a permit documentation and expediting service in Arizona. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Maricopa sooner?

Let Alliance prepare, file, and track your Maricopa permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Maricopa County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.

Expedite Your Permits Today!

Free Quote1-855-478-4290