Municipal Guide Arizona Scottsdale · Maricopa County

Scottsdale Building Permit — Filed & Tracked For You

Everything contractors, builders, and developers need to pull a Scottsdale building permit — which of the city's two portals your project belongs in and why the date decides it, the five separate disciplines every plan is reviewed against, the digital submittal rule and the small scope review shortcut, the four p.m. transaction cut-off at the One Stop Shop, and the environmentally sensitive land rules that make Scottsdale unlike the rest of the Valley.

Authority: City of Scottsdale Planning and DevelopmentReview: Planning, Building, Engineering, Stormwater and FireSubmission: Digital Plan Submittal, into SPUR or eServices by date
Two portals
SPUR or eServicesSplit by project start date
Five disciplines
Every plan, every timeStormwater included
Four p.m.
Transaction cut-offNo new payments after it
Small scope
Type SSRIn the project name

Building permits in Scottsdale are issued by Planning and Development through its One Stop Shop. Scottsdale reviews every plan across five disciplines rather than one, and its environmentally sensitive lands, hillside and flood hazard standards drive the design in ways that have no equivalent in neighbouring Valley cities.

This guide covers what requires a permit in Scottsdale, which of the city's two portals your project belongs in and why the date decides it, the five review disciplines, the digital submittal rule and the small scope shortcut, the four p.m. transaction cut-off, and the site-specific constraints that shape design here.

This guide covers work inside the Scottsdale city limits. Phoenix, Paradise Valley, Tempe, Fountain Hills and the county are separate.

📍

Which portal you use depends on when your project started. The city transitioned to Scottsdale SPUR in January twenty twenty-six for all projects requiring a plan or permit. Projects initiated on or after that date use SPUR; projects initiated before it remain in eServices, including for verifying fees due and payments made. A long-running development that straddles the date will involve both.

What requires a permit in Scottsdale?

The City of Scottsdale Planning and Development department issues building permits and reviews plans for construction inside the city limits, working through its One Stop Shop. Building permits, the city says, exist to safeguard the health, property, safety and welfare of citizens, and homeowners, contractors and developers alike need them for construction and development projects.

Scottsdale's review model is the distinguishing feature. Plan Review Services reviews plans across five disciplines: Planning, Building, Engineering, Stormwater and Fire. Once plans and documents are determined to comply and fees are paid, a permit issues. That means a submittal satisfying the building code alone has cleared one of five gates, and stormwater in particular is a discipline many applicants do not expect to see reviewing a building permit.

The path through the process depends on the project. Single-family residential, interior commercial tenant improvements and minimum or small scope permits typically go straight to plan review and need nothing more than administrative review and approval before permits issue. Major and commercial projects go through the planning phase first — proposals reviewed, outreach conducted, entitlement granted — and only then to plan review.

Because Arizona has no statewide building or residential code, the editions in force here are those the City Council has adopted, together with local amendments that address Scottsdale-specific concerns including flood hazard areas, soils and foundations, and accessibility. Confirm the adopted list and the amendments for your submittal date with Planning and Development before the design is fixed — Valley cities have been moving editions at different times and Scottsdale's position should be checked rather than assumed from a neighbour.

Permit required

  • New residential and commercial construction, additions and tenant improvements
  • Structural and load-bearing alterations, relocation and demolition
  • Utility work, public and private, within the right of way or public utility easements
  • At-risk grading, under its own published process
  • Developer-provided utilities, under their own published process
  • Swimming pools and spas, with barrier compliance
  • Solar photovoltaic systems and battery storage
  • Work in special flood hazard areas, with additional review

Typically exempt

  • Smaller projects the city identifies as not requiring a permit
  • Purely cosmetic finish work that alters no regulated system
  • Like-for-like minor repairs not affecting structure or a system
  • Routine maintenance that does not extend or reroute a system
⚠️ Scottsdale publishes a payment fraud warning — legitimate payments only ever go through the city's own systems. The city states that payments are always processed through official city systems, meaning Scottsdale SPUR or eServices, or in person at the One Stop Shop — and never through direct emails. It asks that you not click links or download attachments from unexpected messages, and that you log in to the relevant system to verify what fees are actually due and what has been paid. Several Arizona jurisdictions now publish versions of this warning.

Scottsdale building department: who handles permitting

Which portal you use is decided by when the project started. On the sixth of January twenty twenty-six the city transitioned to a new portal, Scottsdale SPUR, for all projects requiring a plan or permit. Projects initiated on or after that date use SPUR. Projects initiated before it remain in eServices — including for checking fees due and payments made. On a long-running development that straddles the date, expect to be working in both.

Submittal is electronic and has been for years. All new permit applications must be submitted through the Digital Plan Submittal programme, and only plans originally submitted before a cut-off in early twenty twenty may be resubmitted in paper form, by appointment. There is a useful convention for counter-style reviews: small scope reviews must be submitted electronically and you type SSR in the project name so that staff monitoring small scope submittals can identify and process them quickly.

The One Stop Shop handles payments and the services not available online, and cheque payments can be brought to the office. The rule to plan around is that no new monetary transactions are accepted after four p.m. Refunds on SPUR projects go through a dedicated electronic refund request rather than an informal ask. For reporting problems — building without permits, improper barricades, construction hazards, drainage or flooding, pool barriers, or a native plant in danger of falling — the city runs a separate reporting tool.

Scottsdale permitting contact
DetailInformation
AuthorityPlanning and Development, City of Scottsdale
One Stop Shop7447 East Indian School Road, Scottsdale, AZ
One Stop Shop emailOneStopShopStaff@ScottsdaleAZ.gov
Portal, new projectsScottsdale SPUR, for projects initiated from January 2026
Portal, older projectseServices, for projects initiated before that date
SubmittalDigital Plan Submittal programme; paper only for pre-2020 resubmittals by appointment
Small scope reviewsSubmitted electronically with SSR typed in the project name
TransactionsNo new monetary transactions after four p.m.
Review disciplinesPlanning, Building, Engineering, Stormwater and Fire
Problem reportingSeparate city reporting tool for permits, hazards, drainage and pool barriers
💻

Every Scottsdale plan is reviewed across five disciplines, not one. Plan Review Services checks Planning, Building, Engineering, Stormwater and Fire, and a permit issues only once the construction documents comply across all of them and fees are paid. The two that most often surprise applicants are Stormwater — Scottsdale participates in the National Flood Insurance Program and parts of the city are designated special flood hazard areas — and Planning, where the city's environmentally sensitive lands and hillside standards can drive the design rather than merely check it.

Scottsdale is not Phoenix, Paradise Valley, Tempe, Fountain Hills or unincorporated Maricopa County. The city is long and narrow and shares extended boundaries with several jurisdictions, and its northern reaches abut both county land and other authorities. Because Scottsdale's environmentally sensitive lands, hillside and flood hazard requirements have no equivalent next door, filing in the wrong place is not just an administrative error — the design basis differs. Confirm from the parcel.

Scottsdale permits: record types and what each covers

Scottsdale's record catalog is organised around the development process rather than the permit type, and several specialised tracks sit alongside the standard building permit.

Residential permit types

Residential permit types in Scottsdale
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdPlan review against the jurisdiction's adopted residential code and local amendments, plus zoning and setbacksValuation-based
AdditionAdded conditioned or unconditioned space attached to an existing dwellingStructural and energy review; most of Arizona sits in a hot-dry climate zone, so envelope and equipment sizing draw attentionValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; a change that alters egress, structure, or a system is reviewed even where the footprint does not moveValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDeck and dry-in inspection; plan review rarely required, but a change of assembly type can trigger a structural checkValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageSingle local review covering both the structural attachment and the electrical scope; there is no separate state electrical record in ArizonaFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation, ventilation, and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, meter sets, and rewiringLocal trade review and local inspection against the National Electrical Code edition the jurisdiction has adoptedPer-permit or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementLocal trade review; performed by a contractor holding the matching Registrar of Contractors specialty classificationPer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationLocal trade review; changeout volume is heavy in Arizona given summer design temperaturesPer-permit minimum or per-unit
Patio cover and shade structureAttached and detached covers, ramadas, and carportsStructural review for wind uplift and attachment, plus zoning for setbacks and lot coverageValuation or flat
Swimming poolIn-ground and above-ground pools and spasBarrier, bonding, and electrical review; Arizona sets a statewide minimum pool barrier standard that applies on top of local rulesValuation or flat
Manufactured home set-upPlacing or re-siting a manufactured or modular homeState plan approval through the Arizona Department of Housing, with local zoning, floodplain, foundation, and utility connection reviewFlat or per-unit
DemolitionFull or partial demolition of a dwelling or accessory structureUtility disconnect confirmation, dust control where earthmoving is involved, and site restoration checkFlat
Small scope reviewMinor residential and counter-style projectsSubmitted electronically with SSR typed in the project namePer the city's adopted fee schedule
Environmentally sensitive lands reviewParcels within the city's designated sensitive or hillside areasReviewed through the Planning discipline alongside BuildingPer the city's adopted fee schedule

Commercial permit types

Commercial permit types in Scottsdale
Permit typeWhat triggers itReview pathFee basis
New commercial constructionGround-up commercial, industrial, and institutional buildingsConcurrent review against the jurisdiction's adopted building code and amendments, plus fire and zoningValuation-based
Tenant improvement / upfitInterior fit-out of an existing tenant spaceBuilding, trade, and life-safety review; accessibility attaches on change of useValuation-based
Change of occupancyConverting a building or space to a different use groupOccupancy classification, egress, and accessibility reviewValuation or flat
Commercial electricalService, distribution, and branch circuit workLocal trade review and local inspection; Arizona has no central state electrical permit for either residential or commercial workPer-permit or valuation
Commercial plumbingProcess piping, fixtures, backflow, and grease wasteLocal trade review; backflow and grease interceptor sign-off where applicablePer-fixture or valuation
Commercial mechanicalRooftop units, kitchen exhaust and hood systems, and refrigerationLocal trade review; hood and suppression systems draw fire review alongside mechanicalPer-unit or valuation
Commercial reroofRoof covering replacement on a commercial structureDeck, dry-in, and attachment inspectionValuation or squares
SignageWall, ground, and illuminated signsZoning review for size and placement, plus electrical where illuminatedFlat or per-sign
Grading and drainageClearing, grading, and site work that alters drainageCivil review of grading and drainage, separate from the building permit; monsoon-season flows drive the designAcreage or valuation
Dust control permitEarthmoving, trenching, and construction dust on a qualifying siteCounty air quality department, not the building department; required in the fine-particulate nonattainment areasCounty air quality fee schedule
Commercial demolitionFull or partial demolition of a commercial structureUtility disconnect, asbestos notification, dust control, and site restorationFlat or valuation
At-risk grading permitGrading undertaken ahead of full project approvalUnder the city's published at-risk grading processPer the city's adopted fee schedule
Utility permitAll utility work, public and private, in the right of way or easementsRequired regardless of whether the utility is public or privatePer the city's adopted fee schedule

Residential

  • Building and trade permits are issued and inspected by the same local authority
  • There is no separate state electrical permit — electrical is a local record
  • A Registrar of Contractors licence is required whenever a permit is required, at any job value
  • Properties on septic need on-site wastewater approval before ground is broken

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • The licensee's classification must match the actual scope of work
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Scottsdale

Scottsdale record catalog
RecordWhat it covers
Building permitNew construction, additions, alterations and demolition in the city limits
Small scope reviewCounter-style review, submitted electronically with SSR in the project name
Utility permitAll utility work, public and private, in the right of way or public utility easements
At-risk grading permitGrading undertaken ahead of full approval, under its own process
Developer-provided utilitiesUtilities installed by the developer, under their own process
Green building reviewUnder the city's published green building process
Flood hazard reviewProjects in designated special flood hazard areas
Trade permitElectrical, plumbing and mechanical by the ROC-licensed contractor
Solar photovoltaic permitArrays, inverters and battery storage

Solar permits in Scottsdale

Solar is reviewed on two tracks in Arizona, but unlike some neighbouring states both tracks belong to the same government. The structural side — attachment detail, rail spacing, and whether the existing framing carries the added dead load — and the electrical side — conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection — are both permitted and inspected by the local Authority Having Jurisdiction. There is no state electrical record to buy alongside the local one, and no state inspector to book.

Solar work in Scottsdale is permitted and inspected by the city, and it passes through the same five review disciplines as any other plan — which means Planning has a view on it as well as Building. In a city with extensive design standards and environmentally sensitive lands provisions, array placement and equipment screening are real review items rather than aesthetic preferences. Confirm the adopted electrical edition for your submittal date, and confirm which portal the project belongs in before filing anything.

What varies instead is the code edition. Because each Arizona city, town and county adopts its own editions on its own timetable, the National Electrical Code edition your array is judged against in one jurisdiction may not be the one enforced a few miles away. The Office of the State Fire Marshal sets a minimum electrical standard for the state, but the edition actually enforced is the local one. Confirm it with the jurisdiction before the design is finalised rather than after a correction notice.

Interconnection runs on a third clock and is not something the building department controls. Arizona properties are served by utilities including Arizona Public Service, Salt River Project, Tucson Electric Power and UniSource, alongside municipal utilities and irrigation districts, and each sets its own application, meter and witness-test sequence. Permission to operate follows the utility's process on the utility's schedule, so plan for the tracks to finish at different times.

Roofing permits in Scottsdale

A roof covering replacement needs a permit in most Arizona jurisdictions, and the assumption that a like-for-like replacement is exempt travels badly here. The permit is usually quick, but the inspection that matters happens before the covering goes on rather than after.

Arizona operates no statewide product-approval database, so there is no approval number to search for or cite on the application. The assembly has to comply with the edition of the code the jurisdiction has adopted and with the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

Reroofing follows the ordinary sequence with the deck and dry-in inspected before the covering goes on. Two Scottsdale-specific points apply. The city's design standards mean a change of roof material or colour can attract a Planning view rather than being purely a building matter, particularly in hillside and environmentally sensitive areas. And on the administrative side, remember that no new monetary transactions are accepted after four p.m., so a same-day pay and pull late in the afternoon will not work.

Two Arizona-specific pressures shape the work. Sustained summer heat and ultraviolet exposure age a covering faster than the same assembly would age in a milder climate, and monsoon-season wind and driven rain test the fastening and the flashing details rather than the field of the roof. Sequencing is where reroofs go wrong regardless: the deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Scottsdale permit cost

Fees are calculated by the city and paid through the portal your project belongs in, or in person at the One Stop Shop where cheques are accepted. The city is explicit that a permit issues once plans and documents are determined to comply and fees are paid, so payment sits on the critical path rather than after it.

Two timing rules affect cost planning. No new monetary transactions are accepted after four p.m., so a late-afternoon attempt to pay and pull a permit the same day will not work. And refunds on projects initiated in SPUR go through a dedicated electronic refund request — a defined process, which is worth knowing before a project is cancelled rather than after.

How Scottsdale fees are structured
Fee componentHow it works
Building permit feeCalculated by the city under its adopted fee schedule
Plan reviewAcross five disciplines; a permit issues only on full compliance and payment
Payment channelsScottsdale SPUR or eServices, or in person at the One Stop Shop
Cheque paymentsAccepted at the One Stop Shop office
Transaction cut-offNo new monetary transactions after four p.m.
RefundsSPUR projects use a dedicated electronic refund request
Re-inspection feeCharged where an inspection has to be repeated
🧮

Want a precise number for a specific Scottsdale project? Send us the scope and we will price the permit path before you file.

Scottsdale trade permits

The trades are permitted and inspected by the city under its adopted codes and local amendments. Arizona has no state electrical permit, so the whole job stays with Planning and Development.

Electrical permits

Required for service work, panel changes, photovoltaic systems, electric vehicle chargers and most wiring alterations. Confirm the electrical code edition Scottsdale has adopted for your submittal date rather than assuming a neighbouring city's, since Valley adoptions have moved at different times.

Plumbing permits

Required for new piping, repipes, fixtures and water heaters. On hillside and environmentally sensitive parcels the routing of services interacts with the Planning review, so the plumbing layout is not purely a building-code question here.

Mechanical permits

Required for heating, ventilation and air-conditioning installations, changeouts, ductwork and refrigeration. Equipment screening is a real Planning consideration in Scottsdale given the city's design standards, so a rooftop or side-yard unit may attract more than a mechanical review.

Utility work

A permit is required for all utility work, public and private, that occurs within the city's right of way or public utility easements. That is broader than many applicants expect — private utility work in an easement is caught as well as public work in the street.

🧢 Arizona licenses contractors through the state Registrar of Contractors (the ROC), and the rule is uniform across the state: a licence is required whenever a job's labour and materials exceed one thousand dollars, or whenever a building permit is required at all — a permitted job needs a licensed contractor regardless of its dollar value. The ROC licence is a state licence that is valid statewide, so there is no separate city or county contractor licence, though a municipality may require its own business licence. The one thousand dollar exemption covers only work that both stays under that combined labour-and-materials figure and does not require a permit. The moment a permit is required, a licensed contractor is required, whatever the price.

Scottsdale permit application: how to apply step by step

Here is how to get a building permit in Scottsdale, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Work out which portal your project belongs in

Projects initiated on or after the January twenty twenty-six transition use Scottsdale SPUR; projects initiated before it stay in eServices, including for checking fees and payments. A long-running development may touch both.

2. Establish the site constraints before design

Check whether the parcel sits in a special flood hazard area, on a hillside, or within environmentally sensitive lands. These drive the design rather than merely checking it, and they have no equivalent in most neighbouring jurisdictions.

3. Submit digitally, and flag a small scope review

All new permit applications go through the Digital Plan Submittal programme. For a counter-style review, submit electronically and type SSR in the project name so staff can identify and process it quickly.

4. Expect five disciplines

Plans are reviewed for Planning, Building, Engineering, Stormwater and Fire. Build the submittal to satisfy all five rather than the building code alone.

5. Pay before four p.m.

A permit issues once documents comply and fees are paid, and no new monetary transactions are accepted after four p.m. Do not plan to pay and pull on a late afternoon.

6. Inspect through to close-out

Work the inspection sequence to the occupancy certificate, and use the city's reporting tool if you encounter site hazards, barricade problems or drainage issues during construction.

Inspections in Scottsdale

Scottsdale's development process runs planning, plan review, permitting, inspections and ongoing code enforcement as a continuous sequence, and the department frames inspections as part of ensuring the project is completed in compliance with building codes and city ordinances rather than as a separate administrative step.

The city runs a public reporting tool that is worth knowing about from both sides. It takes reports of building without permits, improper barricades, construction hazards and complaints, drainage issues or flooding, pool barriers, and native plants in declining condition or in danger of falling over. On an active site that means neighbours have an easy route to report you — and that you have an easy route to report a genuine hazard.

Native plants deserve specific mention because they are unusual as a construction consideration. Scottsdale's reporting tool covers native plants in declining condition or in danger of falling over, which reflects a wider set of desert-sensitive requirements in the city's standards. On an environmentally sensitive parcel, vegetation is part of the regulatory picture rather than landscaping detail.

Close-out follows the ordinary sequence to the occupancy certificate once every required inspection has passed and the five review disciplines are satisfied as built. On a flood hazard or hillside parcel, expect the as-built condition to be checked against the approved stormwater and planning requirements rather than the building drawings alone.

Scottsdale permit search and official resources

These are the primary City of Scottsdale and Arizona sources behind this guide. The portal transition and the adopted editions both need confirming for your project's dates.

Frequently asked questions

Which Scottsdale portal do I use?

It depends on when the project started. The city transitioned to Scottsdale SPUR in January twenty twenty-six for all projects requiring a plan or permit. Projects initiated on or after that date use SPUR; projects initiated before it stay in eServices, including for verifying fees due and payments made. A long-running development may involve both.

How many disciplines review my plans?

Five: Planning, Building, Engineering, Stormwater and Fire. A permit is issued once the construction plans and documents are determined to comply with the city's adopted codes and ordinances and the fees are paid. Satisfying the building code alone clears one gate out of five.

What is a small scope review?

Scottsdale's counter-style review path. Small scope reviews must be submitted electronically through the Digital Plan Submittal programme, and you type SSR in the project name so that plan review staff monitoring small scope submittals can identify and process them quickly.

Can I submit paper plans?

Only in a narrow case. All new permit applications must be submitted electronically through the Digital Plan Submittal programme. Only plans originally submitted before a cut-off in early twenty twenty may be resubmitted in paper form, and that requires an appointment.

When can I pay?

Not after four p.m. The city accepts no new monetary transactions after that time, and cheque payments can be brought to the One Stop Shop office during business hours. Since a permit issues only once fees are paid, plan the payment step as part of the critical path.

How do I know a payment request is genuine?

The city's own test: legitimate payments are always processed through official city systems — Scottsdale SPUR or eServices — or in person at the One Stop Shop, and never through direct emails. Do not click links or download attachments from unexpected messages; log in to the relevant system to verify what is actually due.

Which codes does Scottsdale enforce?

The editions adopted by the City Council with local amendments addressing Scottsdale-specific requirements including flood hazard areas, soils and foundations, and accessibility. Arizona has no statewide building or residential code, and Valley cities have moved editions at different times, so confirm the adopted list for your submittal date with Planning and Development.

Does my project go through planning first?

It depends on scale. Single-family residential, interior commercial tenant improvements and small scope permits typically go straight to plan review and need only administrative review and approval. Major and commercial developments go through the planning phase first — proposals reviewed, outreach conducted and entitlement granted — before plan review begins.

Do I need a permit for utility work?

Yes, for all utility work, public and private, occurring within the city's right of way or public utility easements. That is broader than many applicants expect: private utility work inside an easement is caught as well as work in the public street.

Is my parcel in a flood hazard area?

It may be. Scottsdale participates in the National Flood Insurance Program and portions of the city are designated special flood hazard areas. Stormwater is one of the five review disciplines, so this is checked as a matter of course — but you want to know before the design is fixed, not at first review.

Are accessory dwelling units allowed in Scottsdale?

Scottsdale is above the seventy-five thousand population threshold in Arizona's twenty twenty-four accessory dwelling unit statute, so the statewide floor applies: at least one attached and one detached unit as a permitted use on any lot where a single-family dwelling is allowed, capped at seventy-five per cent of the main dwelling's gross floor area or one thousand square feet, whichever is less. Private covenants remain enforceable, which matters in a city with extensive covenant communities.

How do I report a problem on a construction site?

The city runs a dedicated reporting tool covering building without permits, improper barricades, construction hazards and complaints, drainage issues or flooding, pool barriers, and native plants in declining condition or in danger of falling over. It works in both directions — neighbours can use it about your site, and you can use it about a genuine hazard.

Simplify Scottsdale permitting with Alliance Permitting

Scottsdale has more review disciplines and more site-specific design constraints than any other Valley city, and it is mid-transition between two portals. Both are manageable if they are settled at the start. Alliance Permitting prepares, files and tracks Scottsdale permits through issuance.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Scottsdale because the work is done by people who have stood at the counter:

  • We establish which portal your project belongs in before anything is filed.
  • We build submittals for all five review disciplines, not just Building.
  • We check flood hazard, hillside and environmentally sensitive status before design is fixed.
  • We keep payments inside the city's own systems, which is also the control against invoice fraud.

Alliance Permitting is a permit documentation and expediting service in Arizona. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Scottsdale sooner?

Let Alliance prepare, file, and track your Scottsdale permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Scottsdale permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.