To get a building permit in Covington, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Covington’s Community Development Department issues building, mechanical, plumbing and fire permits through the Citizens Connect portal and inspects the work from Monday to Thursday; electrical permits come from Labor and Industries.

Authority: Covington Community Development, Permit ServicesCode: 2021 IBC and IRC with Covington amendmentsPhone: 253-480-2449
Authority
Permit Services16720 SE 271st Street, Suite 100
Filing
Citizens ConnectMeetings by appointment, Monday to Thursday
Plan review
65% of permit feePaid when you apply
Electrical
Labor and IndustriesThe City issues none

In Covington, the Permit Services team of the Community Development Department takes building, mechanical, plumbing, fire and sign applications, and the City’s building safety staff review the plans and inspect the work. Most applications are filed and paid on Citizens Connect, the City’s online permit center, and the 65% plan review fee is due when you apply. The City does not touch wiring: the Washington Department of Labor and Industries (L&I) sells electrical permits and inspects the work, with a service office in Tukwila at 12806 Gateway Drive S.

The office is in City Hall at 16720 SE 271st Street, Suite 100. It works Monday to Thursday, 8 a.m. to 5 p.m., and meetings in person or on Microsoft Teams are by appointment, booked through permitservices@covingtonwa.gov; walk-in visitors may not be seen. The Permit Center line, 253-480-2449, takes voicemail and calls back within two or three business days. Salina Lyons is the Community Development Director. The city’s 2025 Census estimate is 21,496 residents.

These rules cover land inside Covington’s city limits; King County permits the unincorporated land around the city.

What requires a building permit in Covington?

Covington adopts the 2021 International Building Code and International Residential Code as the state amended them, and changes a few of the exempt-work items in chapter 15.05 of the Covington Municipal Code (CMC). Anything outside those exemptions needs a permit, and the City’s permit FAQ adds that setbacks and impervious surface limits still apply to exempt structures.

Permit required

  • New houses, additions, remodels, garage conversions and changes of occupancy
  • Decks more than 18 inches above grade that are over 200 sq ft, over 30 inches above grade, attached to the house or serving a required exit door
  • Re-roofing, except a like-for-like reroof of equal weight with no sheathing replaced
  • Fences over 7 feet, retaining walls over the code limit, demolition and manufactured home placement
  • Mechanical work such as gas water heaters, furnaces and heat pumps; plumbing work such as electric water heaters
  • Fire alarm and sprinkler systems, and signs

No permit (CMC 15.05 and state code)

  • Under the residential code, one-story sheds and playhouses up to 200 sq ft; under the building code, CMC 15.05.070 cuts the limit to 120 sq ft
  • Detached decks of 200 sq ft or less, no more than 30 inches above grade, not serving a required exit; any deck no more than 18 inches above grade
  • Roof-mounted solar panels on a one- or two-family house with a dead load of no more than 4 pounds per sq ft, set no more than 18 inches above the roof
  • Finish work such as painting, flooring and cabinets

What the city decides and what the state holds

The construction codes, energy code and plumbing code are state codes, and Covington enforces them as of March 15, 2024. The City sets its own fees by council resolution (CMC 15.05.200), the shed, deck and solar exemptions above, its hearing examiner appeals, critical areas and tree rules and its impact fees. One difference to know: the City’s solar handout from October 2024 gives a 3-pound load limit, while the adopted code section allows up to 4 pounds per sq ft.

Short on time to read all of this?

Get a free quote →

Washington has a mandatory statewide building code under chapter 19.27 RCW that every city and county enforces and may make stricter; electrical permits come from the Department of Labor and Industries unless the city runs its own program or Tacoma Power serves the site. Building codes in Washington

Covington building department: who handles permitting

CMC 15.05.070 creates the Building Safety Division under a Building Code Official, and the City’s Permit Services team is the front door for applications, fees, inspection requests and permit status. Planning answers zoning and critical areas questions at planning@covingtonwa.gov, and code questions go to building@covingtonwa.gov. Fire plan review is part of the City’s fee schedule, charged as a share of the building permit fee.

Covington permitting contacts
DetailInformation
OfficeCommunity Development, Covington City Hall, 16720 SE 271st Street, Suite 100, Covington, WA 98042
Phone253-480-2449 Permit Services (voicemail, call back in 2 to 3 business days); 253-480-2400 is printed on older City forms
HoursMonday to Thursday, 8 a.m. to 5 p.m.; appointments required for meetings
Emailpermitservices@covingtonwa.gov; building@covingtonwa.gov for code questions
OnlineCitizens Connect: apply, pay, upload, schedule inspections, track permits
Electrical permitsWashington Department of Labor and Industries

Permit types

Residential permits

The building forms page lists separate applications for residential building, demolition, mechanical, plumbing, fire, signs, right-of-way use and temporary occupancy, with checklists for a single-family house (submittal and minimum drawings), manufactured homes, garage conversions and decks. The City sorts water heaters by fuel: a gas water heater goes on a mechanical permit and an electric one on a plumbing permit. The residential application records dwelling, garage, deck and porch areas, bedrooms, bathrooms, height and whether the lot uses a well, septic or a water and sewer district, and it lists the mechanical and plumbing units for the same job.

An accessory dwelling unit needs the City’s ADU affidavit, and a homeowner acting as builder files the notarized Affidavit in Lieu of Contractor Registration, naming the exemption in RCW 18.27.090 that applies. A residential re-roof is a flat $394 under the 2026 schedule and, when one is needed, the City’s FAQ says it is issued over the counter with sheathing and final inspections.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial work uses the commercial building application with the commercial submittal checklist, the tenant improvement checklists or the multifamily checklist, and plans follow the ePermit electronic plan and file naming standards. New owners of small businesses can book a free 30-minute meeting with the Small Business Liaison, and a pre-application conference for larger projects is $1,171. A temporary certificate of occupancy costs $591 below $2 million of valuation and 2% of the building permit fee above it, and phased occupancy is $788.

What comes before the building permit

Zoning, design and land use permits run through the same department. A standalone critical area review for a single-family building permit starts at $1,299 plus the City’s consultant costs and 10%, and clearing, grading, tree removal and shoreline permits each have their own fees in the schedule. Work in a public street needs a right-of-way use permit. If the lot relies on a septic system, Public Health – Seattle & King County runs the on-site sewage program.

⚠️ Battery storage moratorium. Covington has paused the acceptance, processing and approval of building and land development applications for battery energy storage system facilities since Ordinance 07-2024. The latest renewal, Ordinance 09-2026, passed October 27, 2026, renews it for six months from the ordinance’s effective date, printed on it as November 7, 2026 (so to about May 7, 2027), unless the Council repeals, renews or changes it sooner.

Covington permit costs and fees

Covington adopted its 2026 fee schedule by Resolution 2025-19, and the City Council amended it with Resolution 2026-12 by a 7-0 vote on May 12, 2026, mainly to replace the transportation impact fee table; the amended schedule took effect May 20, 2026. Building fees follow a valuation table, and the 65% plan review fee is due when you apply. The schedule does not include a line for the state building code fee.

Rather talk it over?

Call 1-855-478-4290 →
Covington building fees (2026 fee schedule, amended May 2026)
ItemFee or rule
$1 to $500 of value$36
$501 to $2,000$36 for the first $500, plus $17 per added $100 or part
$2,001 to $25,000$144 for the first $2,000, plus $17 per added $1,000 or part
$25,001 to $50,000$545 for the first $25,000, plus $14 per added $1,000 or part
$50,001 to $100,000$905 for the first $50,000, plus $13 per added $1,000 or part
$100,001 to $500,000$1,573 for the first $100,000, plus $13 per added $1,000 or part
$500,001 to $1,000,000$6,914 for the first $500,000, plus $6 per added $1,000 or part
Over $1,000,000$9,996 for the first $1,000,000, plus $7 per added $1,000 or part
Plan review65% of the permit fee, paid at application; fire review of building plans 15% of the building permit fee
Technology management fee$50 per building, plumbing, mechanical, fire, sign, demolition or right-of-way permit
Energy code review$394 new house; $788 new commercial; $99 remodel
Re-roof (single-family)$394
Reinspection, extra plan review$196 each
Mechanical / plumbing for a new house$346 / $373; otherwise $77 or $63 issuance plus unit fees
Permit extension$196 residential; $394 commercial

Worked example. A $60,000 home remodel in Covington pays $1,035 for the building permit: $905 covers the first $50,000 and $13 is added for each of the next ten thousands. Plan review at 65%, paid up front, is $672.75, for $1,707.75 before the $50 technology fee and any energy, fire, mechanical or plumbing charges.

New houses also pay impact fees at issuance. The amended schedule sets the transportation impact fee for a detached single-family home at $7,276 and the park impact fee at $6,815, lists the Kent School District fee at $0, and charges a fire impact fee of $1.07 per sq ft ($0.75 with a residential sprinkler system). Ordinance 10-2026, passed October 27, 2026, adopts the Puget Sound Regional Fire Authority’s 2027 fee schedule from December 6, 2026, which raises the unsprinklered single-family rate to $1.08 per sq ft.

Trade permits and who may pull them

Mechanical and plumbing permits are City permits, with unit fees for each furnace, heat pump, gas outlet or fixture; commercial mechanical and plumbing work is priced on value with 65% plan review. Electrical permits are not: L&I does not list Covington among the cities that run their own electrical programs, and the City’s solar handout tells installers to get the electrical permit from L&I. Statewide registration and trade certificate rules are in our Washington contractor and trade licensing notes.

Rather not deal with the building department?

Get a free quote →

Who issues what

  • Building, mechanical, plumbing, fire and sign permits: Covington, on Citizens Connect
  • Electrical permits and inspections, including solar wiring: L&I
  • Septic systems: Public Health – Seattle & King County

Owners in Covington

  • The City’s FAQ says anyone may work on property they own, or on the home they live in, as long as the work is not done to sell the improved property
  • Owners doing their own work fill in the City’s contractor license requirements form
  • For an owner’s own wiring, RCW 19.28.261 sets two limits: no exemption for a new building intended for sale, rent or lease, and none where the property is offered for sale within 12 months after obtaining it

How to apply for a Covington building permit

1. Check zoning and site limits

Use the City’s property and development pages or email planning@covingtonwa.gov with the address or parcel number to confirm setbacks, impervious surface limits and critical areas.

2. Pick the application and checklist

Download the right form from the building forms page, such as the residential application with the single-family submittal checklist.

3. Register on Citizens Connect

Create an account using the City’s registration guide and name your PDFs to the ePermit file naming convention.

4. Apply and pay plan review

Upload the application and plans and pay the 65% plan review fee, the $50 technology fee and any critical area review.

5. Answer review comments

Upload corrections through the portal; staff review files first in, first out.

6. Pay the balance and get the L&I permit

Pay the permit fee and impact fees at issuance and buy the electrical permit from L&I before wiring starts.

Review, corrections and what causes delay

The City lists the things that set the pace: how complete the plans are, whether the submittal has everything required, how quickly the contact person answers review comments, the reviewers’ workload and the type of review. Under the residential application, an application that has not produced a permit within 180 days of filing is treated as abandoned. Work may not start before the permit is issued and on site, and extra review rounds are billed at $196.

Want this handled start to finish?

Get a free quote →

Inspections in Covington

Book inspections in Citizens Connect by choosing “Request Inspection”. Requests received by 3 p.m. go on the next business day’s schedule, or the next open date if it is full. Inspectors work Monday to Thursday, 8 a.m. to noon and 1:30 to 3 p.m.; you can add a preferred time in the comments, but the City does not promise it. For some permits the City offers virtual video inspections, with a separate guide for preparing them.

A reinspection costs $196 when earlier corrections are not done, the site is closed or the approved plans are not on site, and an inspection outside business hours starts at $394. Final occupancy depends on site, trade and fire approvals being signed off, and L&I’s electrical final comes from its own inspector. Building work is allowed from 7 a.m. to 8 p.m. on weekdays and 9 a.m. to 6 p.m. on weekends and federal holidays.

Covington permit search and official resources

Applicants track active permits in Citizens Connect. Copies of older permits and plans are requested through the City’s public records page, and permit-related notices of application and decision are posted on the Community Development notices page. FEMA’s Community Status Book lists Covington among National Flood Insurance Program participants, on flood maps effective August 19, 2020.

Inspections are where schedules slip.

Get a free quote →

Covington building permit FAQ

Who issues building permits in Covington?

The Community Development Department’s Permit Services team at City Hall, 16720 SE 271st Street, Suite 100. Applications go through Citizens Connect.

How much is a building permit for a $60,000 remodel?

The building permit fee is $1,035 and plan review is $672.75 under the 2026 schedule, plus the $50 technology fee and any trade or review charges.

Do I need a permit for a deck?

Not for a detached deck of 200 sq ft or less that is no more than 30 inches above grade and does not serve a required exit, or for any deck no more than 18 inches above grade.

Do I need a permit for a shed?

At a house, a one-story shed up to 200 sq ft is exempt from a building permit; under the building code the limit is 120 sq ft. Setbacks and impervious surface limits still apply.

Do rooftop solar panels need a building permit?

Not on a one- or two-family house when the panels weigh no more than 4 pounds per sq ft and sit no more than 18 inches above the roof. The electrical permit still comes from L&I.

Can I walk in without an appointment?

The City asks for appointments for in-person or Teams meetings and says walk-ins are not guaranteed. Most permits can be filed on Citizens Connect without one.

Can Covington accept a battery storage project?

Not while the moratorium lasts: Ordinance 09-2026 renews it for six months from its November 7, 2026 effective date, unless the Council ends it sooner.

Simplify Covington permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Washington. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Covington sooner?

Let Alliance prepare, file, and track your Covington permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Covington permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.