In Des Moines, the Building Division of the Community Development Department reviews plans and issues building, mechanical, plumbing, re-roof, fire and electrical permits; Des Moines is one of the cities that run their own electrical program, so wiring permits come from the City rather than from Labor and Industries. Applications go through the City’s MyPermits portal. Under the fee schedule in force since January 1, 2026, plan review costs 65% of the building permit fee, and the City expects first comments in about 4 to 6 weeks.
The department is at 21630 11th Avenue South, Suite D, open Monday to Friday from 8 a.m. to 4 p.m. on 206-870-7576; a planner sits at the counter Tuesday to Thursday from 9 a.m. to 4 p.m., and on Mondays and Fridays by appointment. The Community Development Director is Rebecca Deming. Des Moines had 33,032 residents in the Census estimate for 2025, and its permits cover the city limits only.
What requires a building permit in Des Moines?
Title 14 of the Des Moines Municipal Code (DMMC) adopts the state’s building, residential, mechanical, fire, plumbing and energy codes by their WAC chapters, and it does not rewrite the residential code’s list of exempt work. That means the exemption list in the 2021 International Residential Code, as Washington amended it, is the legal starting point. The City’s own handouts are stricter in places and were written for older code editions, so the two are shown side by side below.
Permit required
- New houses, accessory dwelling units, additions and structural remodels
- Tenant improvements, changes of occupancy and commercial re-roofs
- Residential re-roofs: the City’s re-roof handout says every re-roof needs a permit ($230 flat fee in 2026)
- Decks that are larger or higher than the code exemption allows, or attached to the house (the City’s older Q&A memo still says “a permit for all decks”)
- Fences over 6 feet and retaining walls over 48 inches, or any wall holding back a surcharge, under the City’s fence memo
- Water heaters, furnaces, heat pumps and moved plumbing fixtures
- Electrical work, including rooftop solar and generators, through the City
- Demolition, and clearing or grading above the DMMC 14.20 limits
Usually no building permit
- One-story tool or storage sheds and playhouses of 200 sq ft or less (setbacks still apply)
- Detached decks of 200 sq ft or less, no more than 30 inches above grade and not serving the required exit door (adopted IRC)
- Painting, flooring, cabinets, countertops and similar finish work
- Replacing a toilet or a sink without moving the piping, and fixing a leaking trap
- Like-for-like replacement of switches, outlets and light fixtures
- Clearing up to 2,000 sq ft and grading up to 50 cubic yards, but only with a written letter of exemption from the City
Short on time to read all of this?
Get a free quote →What the city decides and what the state holds
Fences show the gap most clearly: the adopted residential code exempts fences up to 7 feet, while the City’s fence memo still says a permit is needed above 6 feet, and the zoning rules in the same memo set the allowed height by where the fence stands on the lot. What Des Moines controls outright is its fee schedule (set by the City Manager under DMMC 14.01.090), its electrical program, the bond or cash deposit that DMMC 14.05.080 calls for before a permit is issued, in an amount the Building Official sets, and construction hours of 7 a.m. to 7 p.m. on weekdays and 8 a.m. to 5 p.m. on weekends and holidays.
Washington has a mandatory statewide building code under chapter 19.27 RCW that every city and county enforces and may make stricter; electrical permits come from the Department of Labor and Industries unless the city runs its own program or Tacoma Power serves the site. Building codes in Washington
Des Moines building department: who handles permitting
Three teams share each file. Planners check zoning, critical areas and shoreline rules before a project enters building review; permit coordinators confirm the application is complete, collect fees and issue permits and certificates of occupancy; and plans examiners and inspectors from the Building Division, the City’s engineering staff and South King Fire and Rescue review the plans and the work. South King Fire’s chief and fire marshal act as fire code officials under the Building Official’s direction.
| Detail | Information |
|---|---|
| Office | Community Development, 21630 11th Avenue South, Suite D, Des Moines, WA 98198 |
| Phone and hours | 206-870-7576, Monday to Friday, 8 a.m. to 4 p.m. |
| Planner at the counter | Tuesday, Wednesday and Thursday, 9 a.m. to 4 p.m.; Monday and Friday by appointment |
| building@desmoineswa.gov for permits; dmplanning@desmoineswa.gov for zoning | |
| Applications and inspections | MyPermits portal (desmoines-wa.permittrax.com) |
| Electrical permits | City of Des Moines, through MyPermits |
| Fire inspections | South King Fire and Rescue, 253-946-7348 |
The City warns of fake permit-payment emails; check bills in MyPermits.
Permit types
Residential permits
A new house or an addition over 500 sq ft uses the City’s new-construction checklist: the application, a site plan with drainage, driveway and building height, construction drawings with an average-height calculation, structural calculations, an erosion control (TESC) plan, the energy code worksheet, certificates of water and sewer availability, the fire apparatus access and fire flow worksheet, any recorded easements, and a contractor registration or owner affidavit. Smaller residential work that adds no bedrooms uses the minor-construction checklist, which drops the TESC plan and asks for water availability only when floor area is added.
Water and sewer letters come from the district that serves the lot, not from the City; the checklist names King County Water District 54, Highline Water District and Lakehaven Utility District for water, and Midway and Southwest Suburban sewer districts.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects follow the commercial submittal requirements and the minimum drawing standards, with separate checklists for tenant improvements, re-roofs and changes of occupancy. Engineering plan review adds 35% of the building permit fee on commercial work and South King Fire review adds 15%. A temporary certificate of occupancy for a new commercial or multifamily building costs $3,675, or $525 for a tenant improvement.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
DMMC 14.05.060 requires design review, a shoreline substantial development permit, a clearing or grading permit, critical areas review and SEPA review, where they apply, to be filed with the building application or before it. Planning fees come from a separate schedule effective June 1, 2026: critical areas review of a single-family house costs $4,317 (or the consultant’s cost plus 20%), a minor critical areas activity $1,298, SEPA review of a house lot $803, a shoreline exemption $550 and a shoreline substantial development permit $4,317. The first two pre-application meetings are free and each later one costs $440. Lots on septic need King County public health approval for a new house or a bedroom addition, because DMMC chapter 14.25 hands sewage system rules to the Seattle-King County Department of Public Health. Work in the street needs a right-of-way use permit under DMMC chapter 12.05.
Des Moines permit costs and fees
The Building Division’s consolidated fee schedule took effect on January 1, 2026, signed by the City Manager under DMMC 14.01.090, which gives the City Manager the power to set permit fees. Valuation follows the ICC building valuation data in the City’s permit valuation guidelines (the February 2026 table is posted). The valuation bands do not run on from one another, so each project is priced inside its own band.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee or rule |
|---|---|
| $1 to $2,000 of valuation | $121.00 |
| $2,001 to $25,000 | $121.00 for the first $2,000, plus $24.25 per added $1,000 or part |
| $25,001 to $50,000 | $690.25 for the first $25,000, plus $18.15 per added $1,000 or part |
| $50,001 to $100,000 | $1,184.00 for the first $50,000, plus $13.56 per added $1,000 or part |
| $100,001 to $500,000 | $1,821.60 for the first $100,000, plus $11.13 per added $1,000 |
| Building plan review | 65% of the permit fee; reviews after the second round billed at $138 an hour |
| Engineering and fire review | Engineering 20% (residential) or 35% (commercial); South King Fire 15% |
| Automation / technology fee | The greater of $35 or 5%: of “the permit and plan review fee” on page 1, of “the permit fee” on the residential page |
| Washington State Surcharge (RCW 19.27.085) | Residential building permits $6.50 each permit plus $2.00 per residential unit after the first; commercial $25.00 each permit plus $2.00 per residential unit after the first |
| Re-roof, residential | $230 |
| Re-inspection, hourly rate | $138 an hour, one-hour minimum |
| Expedited review (when approved) | 30% of the building permit fee, $600 minimum ($300 on the residential page) |
| Work without a permit | Permit fee equal to twice the standard building permit fee |
Worked example. A $60,000 house remodel falls in the $50,001 to $100,000 band: $1,184 plus 10 × $13.56 ($135.60) gives a building permit fee of $1,319.60. Plan review at 65% adds $857.74, and the residential state surcharge adds $6.50, for $2,183.84. The automation fee then adds $65.98 if it is taken on the permit fee alone, or $108.87 if it is taken on the permit and plan review fees together, as the two pages of the schedule word it differently. Engineering review, City electrical, plumbing and mechanical permits are extra.
New homes also pay impact fees. The citywide transportation impact fee from April 1, 2026 is $8,591.10 for a single-family house and $4,295.55 for an ADU, adjusted each spring by a construction cost index; the City’s program page says new residential development east of the Pacific Highway South corridor is currently not required to pay it. The two schedules differ on engineering review of a single-family house: the building schedule says 20% of the permit fee and the June 2026 planning and engineering schedule says 15%.
Rather not deal with the building department?
Get a free quote →Trade permits and who may pull them
All trade permits are City permits here. Mechanical and plumbing permits each start with a $67.10 permit fee, plus items such as $8.53 per plumbing fixture, $11.55 per water heater and $19.75 for a heat pump. Electrical work follows the Washington Cities Electrical Code that DMMC 14.01.050 adopts: wiring a new house or addition costs $181.50 for the first 1,500 sq ft plus $48.40 for each further 500 sq ft, and a standard rooftop solar package is $488.48, made up of the electrical permit, electrical plan review, a South King Fire permit and the automation fee.
Who files what
- Building, electrical, mechanical, plumbing, re-roof and fire: Des Moines, on MyPermits
- Fire inspections: South King Fire and Rescue
- Water and sewer: the district that serves the lot
- Septic: King County public health
Licenses and owners
- A permit needs a registered contractor with a UBI number and a City business license on the application, unless the owner is exempt
- Owners exempt from registration under RCW 18.27.090 file the City’s Affidavit in Lieu of General Contractor
- The City’s Q&A memo says owners may do their own electrical work under state law; electrical contractors buy their own permits and cannot work under an owner’s permit
How to apply for a Des Moines building permit
Find the parcel number on the City GIS map, and get a City business license if you are a contractor.
Use the Tuesday to Thursday counter hours or ask for a pre-application meeting to settle setbacks, height, critical areas and shoreline limits.
Use the new-construction or minor-construction checklist, the water and sewer availability letters and the fire flow worksheet.
Upload each document as its own PDF, no larger than 250 MB, with a plain name and pages turned the right way.
Submit the application and documents in the portal and pay the plan review and automation fees.
Upload revised sheets with names starting “REV” and a Plan Revision Submittal Cover Sheet.
Pay the balance and any impact fees, post the permit and keep the approved plans on site.
Review, corrections and what causes delay
The City’s process guide gives 4 to 6 weeks for first comments or approval, about 3 weeks for each revision, and up to 6 to 8 weeks for complex commercial projects. Two review rounds are included; further rounds of revisions or deferred submittals are billed at $138 an hour. An application with no permit issued within 180 days expires, and the Building Official may grant one extension of up to 180 days; after that you reapply and pay plan review again.
Want this handled start to finish?
Get a free quote →Inspections in Des Moines
Request inspections in MyPermits or on the City’s automated inspection line at 206-870-7576 with the permit number, address, contact and inspection type. The cut-off is 2 p.m. for an inspection the next day, requests left after 2 p.m. may not be picked up until 2 p.m. the following day, and there are no same-day inspections. Fire inspections are booked with South King Fire and Rescue at 253-946-7348. The permit and approved plans must be on site, and a re-roof usually gets a roof nailing inspection and a final.
A permit becomes invalid if work does not start within 180 days of issue or stops for 180 days; the Building Official can grant written extensions of up to 180 days each. When the work passes its final, the Building Division issues a certificate of occupancy for a new building or a change of occupancy, and a final approval for other work.
Des Moines permit search and official resources
MyPermits shows the status of active permits, the next day’s inspection schedule and a map of active permits. Plans and files for older projects are requested through the City’s public records request page. Des Moines is a participating community in the National Flood Insurance Program, and FEMA’s status book lists August 19, 2020 as the date of its current flood map.
- Des Moines Permits page and MyPermits link
- MyPermits portal: apply, check status, book inspections
- Permit applications, checklists and handouts
- Building Division fee schedule, effective January 1, 2026 (PDF)
- Planning and engineering fee schedule, effective June 1, 2026 (PDF)
- Transportation impact fee program
- Understanding the building permit process (PDF)
- Schedule an inspection
- Electronic plan requirements
- Des Moines Municipal Code (Title 14, buildings)
- Public records request
- L&I list of cities that issue their own electrical permits
Inspections are where schedules slip.
Get a free quote →Des Moines building permit FAQ
Who issues building permits in Des Moines?
The Building Division of the Community Development Department, at 21630 11th Avenue South, Suite D (206-870-7576). It also issues electrical permits.
Do I get my electrical permit from L&I in Des Moines?
No. Des Moines runs its own electrical program, so electrical permits and inspections come from the City through MyPermits.
How much is a building permit in Des Moines?
A $60,000 remodel costs $1,319.60 for the permit, $857.74 for plan review and $6.50 in state surcharge, plus an automation fee of $65.98 to $108.87 depending on how it is calculated.
How long does plan review take?
About 4 to 6 weeks for first comments, around 3 weeks for each revision, and up to 6 to 8 weeks for complex commercial projects.
Do I need a permit for a fence?
The adopted residential code exempts fences up to 7 feet, but the City’s fence memo says fences over 6 feet need a building permit, so check with the Building Division; zoning height limits apply either way.
Can I book a same-day inspection?
No. Requests made by 2 p.m. are for the next day, and fire inspections go through South King Fire and Rescue.
Simplify Des Moines permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Washington. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Des Moines sooner?
Let Alliance prepare, file, and track your Des Moines permits while your crew stays on the job.
More Washington permitting guides
King County
Read guide →Auburn
Read guide →Bellevue
Read guide →Douglas County Building Permit Guide
Read guide →DuPont Building Permit Guide
Read guide →East Wenatchee Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Des Moines permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.