Radford, Virginia Building Permit Guide

Radford is an independent city: its own Building Official at 10 Robertson Street issues every building and trade permit inside the city limits, on paper applications filed in person or by mail.

Authority: City of Radford Building OfficialCode: 2021 Virginia USBCPhone: 540-267-3179
Authority
City of Radford Building Official10 Robertson Street, Radford, VA 24141
Apply
In person or by mailPDF applications on the Building Official page
Commercial plans
Third-party plan review requiredIncludes MEP, sprinkler and fire alarm

The City of Radford Building Official (540-267-3179) issues building, trade, sign, demolition and roofing permits for property inside the city. Applications are made at 10 Robertson Street in person or by mail, and for new construction a signature sheet goes round the zoning office, the City Engineer and the Water/Wastewater Department before the permit is issued. Plans for commercial buildings must be reviewed by a third-party plan reviewer.

What requires a building permit in Radford?

The City’s zoning FAQ puts the line at $500: permits are required for all signs and for any construction project that will cost more than that. The Building Official’s forms cover these jobs:

Building applications

  • New single-family dwellings, townhouses and duplexes
  • Residential additions and renovations
  • Decks
  • Accessory structures (the zoning ordinance requires a building permit before any accessory building is built or placed on a lot)
  • New commercial buildings, additions and renovations

Trade Permit Application

  • Electrical, mechanical and plumbing work
  • Framing
  • Fire alarm and sprinkler systems
  • Signs
  • Demolition
  • Roofing

One exemption is printed on the City’s inspection chart: a retaining wall holding back less than 3 ft of unbalanced fill needs no building permit, unless it impounds Class I, II or III-A liquids or carries a surcharge beyond ordinary backfill. A wall retaining more than 48 inches of fill, or one over 24 inches that resists other lateral loads, must be designed by a registered design professional.

Who issues building permits in Radford?

City Code Chapter 23 sets up the office of the Building Official as Radford’s building department, with the duty to enforce the statewide building code within the city. Chris Childress is the Building Official. Because Radford is an independent city, neither neighboring county issues permits for addresses inside the city limits; land outside the limits belongs to the county it sits in.

Short on time to read all of this?

Get a free quote →
Radford Building Official
DetailInformation
OfficeBuilding Department, 10 Robertson Street, Radford, VA 24141
Phone540-267-3179
How to fileIn person or by mail, on the City’s PDF applications
Zoning and site plansCommunity Development, 10 Robertson Street, 540-731-3603
Erosion control and right-of-wayEngineering Office, 10 Robertson Street, Suite C27, 540-731-3603
Electric serviceRadford Electric Department Billing Office, 540-731-3602

A decision of the Building Official can be appealed to the local board of building code appeals; the written request must be filed within 30 calendar days of receiving the decision.

Radford permit applications

Radford has no online permit portal. The Building Official page sorts the PDF forms by project:

  • New single-family dwelling, townhouse or duplex: three forms together, the Residential Building Application, the Residential Sub-Contractor Form and the Combined ES, SW, ROW packet (erosion and sediment, stormwater and right-of-way).
  • Residential addition, renovation, deck or accessory structure: the Residential Building Application alone.
  • New commercial work, additions or renovations: the Commercial Building Application. It asks for use group, type of construction, flood zone, sprinkler and fire alarm status, and, for a building from before 1985, whether an asbestos survey is attached.
  • Trade work, signs, demolition and roofing: the one-page Trade Permit Application.
  • Contractor Information Form: filed with the application by any contractor new to Radford or with details to update.

The Residential Sub-Contractor Form lists the framing, mechanical, electrical, plumbing and insulation subcontractors with their licence numbers and the value of each one’s work.

Radford permit fees

Under City Code Sec. 23-6, City Council sets the schedule of fees for permits, inspections and certificates, and the schedule in force is kept on file in the City Clerk’s office, where it can be inspected during business hours. It is not among the forms on the Building Official page, so the fee for a job is worked out by the Building Official’s office on the application itself.

What the forms and the Code do show:

Not sure this scope needs a permit?

Get a free quote →
  • Each application has a staff box for the permit fee and a state surcharge. The building applications add lines for a water fee and a sewer fee.
  • Both the building and trade applications ask for the cost of construction.
  • No permit is issued until the fees have been paid (Sec. 23-5).
  • A permit is personal to the owner or lessee it was issued for and cannot be transferred or assigned.
  • The Agreement in Lieu of an Erosion and Sediment Control Plan for a one- or two-family dwelling has no application fee.

Electrical, plumbing, mechanical and fire system permits

All trade permits come from the Building Official on the Trade Permit Application, which has tick boxes for residential or commercial work and for each trade. The form asks for the contractor’s Virginia licence number and class (A, B or C) and the master tradesman licence number with its expiry date.

Bonding and business licence. City Code Sec. 23-8 requires all electrical, plumbing and building contractors doing business in Radford to be bonded. A Radford business licence is needed once a contractor grosses more than $25,000 a year from work in the city; the Commissioner of Revenue’s office (540-731-3613) handles it.

Power. Radford runs its own municipal electric utility. A new customer completes an application at the Billing Office and needs an approved inspection from the Building Official before service is provided. The Code also makes it unlawful to supply power to a structure until the permit and inspections have been confirmed.

Fire systems. Sprinkler and fire alarm plans for commercial buildings go through the same third-party plan review as the building plans.

What to submit with a Radford application

The Building Official asks for this information with every application:

  • Owner’s name, address and phone number
  • Site address
  • Contractor’s name, address and phone number
  • Description of the work
  • Total amount to be spent on construction

Depending on the type of construction, a set of plans may be required. The residential form also records the finished square footage by floor, basement and garage areas, the zoning district, building height and the four setbacks, and it names the mechanics lien agent or states that none is designated.

Rather talk it over?

Call 1-855-478-4290 →

Site plan. A site plan is required before a building permit for a new building, for enlarging or moving a building, and for changes to parking or vehicle circulation. At least 5 copies go to the Community Development Director’s office. The City says site plan approval usually takes 4 weeks, or 90 days when a subdivision is involved; single-family homes, duplexes and additions usually take 2 or 3 days, and erosion and sediment control permits about a week.

Commercial plans. Plans for commercial buildings and structures, including mechanical, electrical and plumbing drawings, are reviewed by a third-party plan reviewer; the City posts a Professional Services List next to the commercial application.

How to apply for a Radford building permit

1. Ask the Zoning Administrator for the zoning classification

Setbacks and permitted uses depend on the district, and the application records both.

2. Submit the site plan

Where one is required, file at least 5 copies with Community Development and wait for the final or temporary approval.

3. Have commercial plans reviewed

For a commercial job, hire a third-party plan reviewer for the building, MEP, sprinkler and fire alarm plans.

4. File at 10 Robertson Street

Hand in or mail the application for your project type, the Contractor Information Form if you are new to the city, and for a new dwelling the sub-contractor list and the Combined ES, SW, ROW packet.

5. Wait for the signature sheet

For new construction the sheet goes to the zoning office, then the City Engineer (address, public access, drainage and erosion control), then Water/Wastewater. When it returns to the Building Official, the permit can be issued.

6. Pay, then request each inspection

Fees are paid before the permit is released; the permit holder is responsible for requesting every required inspection through to the final.

Radford inspections

Inspections are arranged with the Building Official’s office on 540-267-3179. The City’s Required Residential Inspections chart shows which inspections each kind of project gets:

Rather not deal with the building department?

Get a free quote →
  • New house: all 15 on the chart, from setbacks, footer and grounding, temporary electrical, foundation wall rebar, drain tile and waterproofing, under-slab plumbing and slab preparation through framing, electrical, mechanical, plumbing, permanent electric, insulation, water and sewer service and final building.
  • Deck, carport, screened porch or accessory structure: setbacks, footer, framing and final.
  • Finishing a basement or attic: framing, electrical, mechanical, plumbing, insulation and final.
  • Pool: setbacks, electrical, plumbing and final.

Drain tile and waterproofing are inspected where a finished floor is below exterior grade, any plumbing under a slab needs an under-slab inspection, and underground pipes are inspected before backfilling. On a new dwelling, bare ground must be permanently stabilized or the final occupancy permit is withheld.

Local Radford requirements

Erosion and sediment control: City Code Chapter 31 exempts land disturbance of less than 10,000 sq ft. For a one- or two-family dwelling the owner signs an Agreement in Lieu of a plan with the Engineering Office: silt fence, mulch and a stone construction entrance go in before work starts, bare areas are stabilized within 7 days, and the agreement is valid for one year. Call Engineering on 540-731-3603 once the measures are in and before disturbing the land. Other sites need a Land Disturbing Permit.

Right-of-way: work in a public right-of-way, including a new driveway entrance, needs the Engineering Office’s right-of-way permit, and the City publishes a standard detail for concrete driveway entrances on curb-and-gutter streets.

Accessory buildings and fences: an accessory building up to 12 ft high may sit in a required rear or side yard but no closer than 5 ft to a lot line, and no permanent accessory building may be built before the main building’s permit is issued. Fences may stand on the property line up to 6.5 ft high in rear yards and 4 ft in front yards.

Flood districts: the zoning ordinance includes FP-1 Floodway and FP-2 Flood-Fringe districts, and the commercial application asks whether the site is in a flood zone.

Rental housing: City Code Sec. 23-11 sets up rental inspection districts in which owners must notify the City that a dwelling is rented; there is no fee for the notice.

Want this handled start to finish?

Get a free quote →

Virginia building code

Every Virginia locality enforces the Uniform Statewide Building Code, 2021 edition, in effect since 18 January 2024. No Virginia locality can adopt its own building code or amendments, so what varies locally is zoning conditions, historic districts and flood plain rules. How Virginia’s statewide code works

Official Radford permit resources

Inspections are where schedules slip.

Get a free quote →

Radford building permit FAQs

Does Radford issue its own building permits?

Yes. The City of Radford Building Official issues them for every address inside the city limits. Radford is an independent city and is not part of Montgomery County or Pulaski County.

Where do I apply for a building permit in Radford?

At the Building Department, 10 Robertson Street, Radford, VA 24141, in person or by mail. The phone number is 540-267-3179.

How much is a building permit in Radford?

City Council sets the fee schedule and it is kept on file with the City Clerk. The Building Official’s office enters the permit fee, the state surcharge and any water and sewer fees on your application, and the permit is issued once they are paid.

Do I need a permit for a fence or shed in Radford?

An accessory building such as a shed needs a building permit before it goes on the lot and must stay 5 ft from side and rear lot lines. The City’s zoning FAQ allows fences on the property line up to 6.5 ft in rear yards and 4 ft in front yards, and requires a permit for any construction project over $500.

How long does approval take?

The City says single-family homes, duplexes and additions usually take 2 or 3 days at the site plan stage, other site plans usually 4 weeks, and 90 days where a subdivision is involved.

Who reviews commercial plans in Radford?

A third-party plan reviewer, including for mechanical, electrical, plumbing, sprinkler and fire alarm plans.

When can I get electric service connected?

After you apply at the Radford Electric Department’s Billing Office (540-731-3602) and the Building Official has approved the inspection.

Simplify Radford permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Virginia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Radford sooner?

Let Alliance prepare, file, and track your Radford permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Radford permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.