Grayson County, Virginia Building Permit Guide

The Grayson County Building Department in Independence issues building and trade permits for the whole county, including the towns of Independence, Fries and Troutdale, on paper forms or through its online permitting tool.

Authority: Grayson County Building DepartmentCode: 2021 Virginia USBCPhone: 276-773-2322
Authority
Grayson County Building Department129 Davis Street, Independence
Apply
Online permitting tool or PDF formsZoning permit required first
New home fee
$0.20 per sq ft, first 2,000 sq ft$0.30 after that; $275 minimum

The Grayson County Building Department, at 129 Davis Street in Independence, issues permits for the county and for the towns of Independence, Fries and Troutdale. You can apply through the county’s online permitting tool or on its numbered PDF forms, but an approved zoning permit has to be submitted with any building permit application. A new house costs $0.20 per square foot for the first 2,000 sq ft and $0.30 after that, with a $275 minimum.

What requires a permit in Grayson County?

The Building Department publishes its own FAQ sheet on when permits are and are not required, and its online tool lists the common projects.

Permit needed

  • Building or demolishing any structure, residential or commercial
  • Removing or adding any wall or partition, or changing a structural component
  • Additions, decks and porches
  • Manufactured homes, including doublewides
  • Storage sheds and carports over 256 sq ft, and attached or detached garages, including prefabricated metal ones
  • Electrical, plumbing, mechanical or framing renovations
  • Swimming pools above the exempt size
  • Communication towers and amusement devices
  • Re-roofing a commercial or industrial building
  • A change of occupancy that needs a new certificate of occupancy

No permit

  • One-story detached tool and storage sheds and playhouses of 256 sq ft or less, outside a FEMA Special Flood Hazard Area (zoning setbacks still apply)
  • Residential re-roofing and exterior siding, drywall repair and painting
  • Fences, unless they are a pool barrier or needed for pedestrian safety
  • Retaining walls holding less than 3 ft of unbalanced fill
  • Pools no larger than 150 sq ft and 5,000 gallons and less than 24 inches deep
  • Tents of 900 sq ft or less with an occupant load of 50 or less
  • Replacement windows and doors in existing openings, floor coverings and cabinets in a home
  • Agricultural buildings used for an operating farm

The county notes that the roofing and siding exemption depends on wind speed, and that parts of Grayson County above 4,000 feet fall in a higher wind zone. A farm building exemption is claimed with the county’s Farm Structure Affidavit.

Who issues building permits in Grayson County?

One department covers every address. The county states that its Building Department is responsible for issuing permits within Grayson County, the Town of Independence, the Town of Fries and the Town of Troutdale; it reviews plans before construction and inspects each project in phases.

Short on time to read all of this?

Get a free quote →
Grayson County Building Department
DetailInformation
Office129 Davis Street, Independence, VA 24348 (P.O. Box 217)
Phone276-773-2322; also 276-236-8149 ext. 103; toll free 1-800-752-5117
Office hours8:30 a.m. to 4:30 p.m.
Zoning (unincorporated county)Planning & Community Development, same address, 276-773-2000

Independence, Fries and Troutdale: the county issues the building and trade permits in all three towns, but each town administers its own zoning. For a site inside town limits, the county tells applicants to contact that Town Office for the zoning requirements in place of the county zoning permit.

Grayson County permit types and forms

Applications can be started in the county’s Citizen Portal, where you fill in the required fields and upload plans and documents, or made on the numbered PDF forms at the Building Department:

  • Form 1000, Residential Permit: building, altering or demolishing a residential building.
  • Form 2000, Commercial Permit: any commercial structure; a Change of Use Application (Form 6000) is added if the use changes.
  • Form 3000, Trade Permit: electrical, plumbing or mechanical work on residential, commercial or agricultural projects.
  • Form 4000, Sign Permit.
  • Form 5000, Amusement Device Permit: filed at least 5 days before operation, with proof of $1,000,000 liability insurance per occurrence.
  • Form 7000, Storage Tank Removal: above-ground or underground fuel tanks; the Department of Environmental Quality must also be notified.
  • Form 8000, Accessory Structure Permit: detached structures up to 3,000 sq ft and two stories, on the same lot as the dwelling.
  • Affidavit of Permit (Form AFF-1100): for an owner acting as their own general contractor. Any contractor doing part of the work must be licensed in that trade, and names and licence numbers go in with the application.

Grayson County permit costs and fees

The county posts its Building Permit Fee Schedule as an ordinance of the Board of Supervisors. Fees must be paid in full before any permit is issued or work begins.

Not sure this scope needs a permit?

Get a free quote →
Grayson County building permit fees
ProjectFee
New residential construction; apartments, town homes and condos$0.20 per sq ft for the first 2,000 sq ft, $0.30 per sq ft after; $275 minimum
Addition to a residenceSame rates; $125 minimum
Accessory structureSame rates; $60 minimum. $60 for a pre-manufactured building without footers over 150 sq ft
Renovation, alteration or change of use$0.20 per sq ft of building area; $125 minimum
New commercial or business building$4 per $1,000 of estimated cost up to $50,000, $2 per $1,000 above; $275 minimum
New warehouse or manufacturing building$3 per $1,000 of estimated cost up to $50,000, $2 per $1,000 above
Other construction not listed$5 per $1,000 of estimated cost; $60 minimum
Pool$100
Sign; tent or membrane structure; demolition$60 each
Moving a building$0.20 per sq ft for the first 2,000 sq ft, $0.30 after
Blueprint review$60 in-house, or the cost of third-party review
Re-inspection, when an inspection is called before the work is complete$60
Certificate of occupancy for an existing building$60 plus $60 for each follow-up inspection

For example, a new 2,400 sq ft house is 2,000 × $0.20 = $400 plus 400 × $0.30 = $120, a building permit fee of $520 before trade permits.

Anyone who starts construction without the required building permit pays a pre-inspection fee of $60 or 20% of the project permit, in addition to the normal permit fees. The county zoning permit is $15 on the Zoning & Subdivision Fees sheet.

Electrical, plumbing, mechanical and gas permits

If plumbing, mechanical or electrical work is part of a residential, commercial or accessory structure job, a separate Trade Permit (Form 3000) is required. The trade sections of the fee ordinance are:

Rather talk it over?

Call 1-855-478-4290 →
Grayson County trade permit fees
PermitFee
New single-phase electrical service, 200 A or less$60
Single-phase service over 200 A$20 more for each additional 100 A or part
New three-phase service, 400 A or less$80
Service change, rewiring or added circuits; special circuits, temporary poles and manufactured homes$60
Plumbing$15 main sewer, $15 main water, $5 per fixture; $60 minimum
HVAC, ducting and refrigeration$30 plus $5 per $1,000 of contract value; $60 minimum
LP gas installation and appliances$30 plus $5 per $1,000 of contract value; $60 minimum
Sprinkler system$30 plus $5 per $1,000 of the contract; $60 minimum

Replacing an existing above-ground LP gas container with one of the same capacity in the same place, installed by the gas supplier, needs no permit.

Grayson County construction documents

The county’s Application Submission Requirements checklist (revised October 25, 2021) lists what must come in with a building permit application:

  • A 911 address for the site, posted where it can be seen from the road. Addresses are assigned by the 911 Coordinator’s office in Galax, 276-236-5122.
  • An approved Grayson County Zoning Permit, or the town’s zoning approval inside Independence, Fries or Troutdale.
  • Septic system and well approval for new construction and additions where there is no public water or sewer, from the Grayson County Health Department, 186 West Main Street, Independence, 276-773-2961.
  • A VDOT entrance permit for a new driveway onto a state secondary road, from the Wytheville residency office, 276-228-2153.
  • Building plans for any new construction, addition or major renovation: 1 paper set and 1 PDF set.
  • The Erosion & Sediment Affidavit (Form ES-1200) for a single-family home, or an approved erosion and sediment control plan.
  • The most recent county tax ticket for the parcel. Real estate taxes must be current before a permit is issued.

The plan requirements sheet asks for the code edition used, the designer’s contact details, the design loads, a footing and foundation plan (minimum footing depth 18 inches, at least 8 inches of concrete and two runs of #4 rebar), floor and framing plans for each level, elevations, roof framing and structural cross sections. Deck footings have to be shown too. The county gives a ground snow load of 30 psf and a design wind speed of 110 mph below 4,000 feet and 140 mph above.

Rather not deal with the Grayson County building department?

Get a free quote →

How to apply for a Grayson County building permit

1. Get a 911 address

Call the 911 Coordinator’s office on 276-236-5122 for a new structure and post the address at the road.

2. Zoning permit

File Zoning Permit Form 0100 with Planning & Community Development, or go to the Town Office if the site is in Independence, Fries or Troutdale.

3. Health Department and VDOT

Obtain well and septic approval and the entrance permit where the lot needs them.

4. Submit the application

Use the Citizen Portal or the paper form for your project type, with the plans, the erosion affidavit, the owner’s affidavit or contractor licence numbers, and the tax ticket.

5. Plan review and payment

The department reviews the plans before construction. Fees are paid in full before the permit is issued.

6. Inspections

Send each inspection request through the Citizen Portal and wait for the department to confirm it.

Grayson County building inspections

The Building Department inspects projects at set phases of construction. Inspection requests can be sent through the Citizen Portal by looking up the existing permit, but the county stresses that submitting a request does not schedule the inspection: staff review it and follow up. The office number is 276-773-2322.

Calling for an inspection before the work is complete costs a $60 re-inspection fee.

Third-party inspections: under the department’s policy of March 17, 2020, a third-party inspector must be a Virginia registered design professional or work under one, and must be approved by the department in advance. Pre-approval is not needed when the department has not carried out the inspection within two full working days of the request. Reports carry the design professional’s seal and signature, the date and time, the permit number and confirmation that the county-approved plans were used. Reports for inspections up to and including framing go in before the insulation inspection, and later ones before the final.

Local Grayson County requirements

Zoning in the unincorporated county: Planning & Community Development handles zoning, floodplain and erosion and sediment control outside the towns. Its forms include a Floodplain Development Application (no fee), a Manufactured Home form and a Shoreline Recreation Zone District structure application.

Want this handled start to finish?

Get a free quote →

Land disturbance: a single-family home uses the Erosion & Sediment Affidavit. Other projects that grade more than 10,000 sq ft need a Land Disturbing Permit Application (Form LDA-001) and an erosion and sediment control plan. A single-family house that disturbs less than 1 acre and is not part of a larger development files an Agreement in Lieu of a Stormwater Management Plan (Form GCSW-003) before grading.

Elevation: design wind speed and the roofing and siding exemption both change above 4,000 feet, which matters on the county’s high ground.

Fuel tanks: removing an above-ground or underground fuel tank needs Form 7000 from the county as well as notice to the Department of Environmental Quality.

New home basics: the department publishes an Overview of Minimum Requirements to Construct a New Home, written against the 2021 Virginia Residential Code, for owners planning a small house.

Virginia building code

Every Virginia locality enforces the Uniform Statewide Building Code, 2021 edition, in effect since 18 January 2024. No Virginia locality can adopt its own building code or amendments, so what varies locally is zoning conditions, historic districts and flood plain rules. How Virginia’s statewide code works

Official Grayson County permit resources

Inspections are where schedules slip.

Get a free quote →

Grayson County building permit FAQs

Who issues building permits in Grayson County?

The Grayson County Building Department, 129 Davis Street, Independence, phone 276-773-2322. It also issues permits inside Independence, Fries and Troutdale.

How much is a building permit in Grayson County?

New residential construction is $0.20 per sq ft for the first 2,000 sq ft and $0.30 per sq ft after that, with a $275 minimum. A 2,400 sq ft house comes to $520 before trade permits.

Do I need a permit for a shed in Grayson County?

Not for a one-story storage shed of 256 sq ft or less with no trade work, outside a flood hazard area, though zoning setbacks still apply. Larger sheds use the Accessory Structure Permit, with a $60 minimum fee.

Do I need a permit to re-roof my house?

Residential re-roofing and exterior siding are on the county’s list of work that needs no permit. Re-roofing a commercial or industrial building does need one.

Can I be my own contractor?

Yes. An owner files the Affidavit of Permit (Form AFF-1100) to act as general contractor on their own project. Any contractor hired for part of the work must be licensed in that trade.

Do the towns issue their own building permits?

No. Independence, Fries and Troutdale handle their own zoning, and the county Building Department issues the building permit.

What do I need before I apply?

A posted 911 address, zoning approval, well and septic approval where needed, a VDOT entrance permit for a new driveway, plans in paper and PDF, the erosion affidavit and a current tax ticket.

Simplify Grayson County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Virginia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Grayson County sooner?

Let Alliance prepare, file, and track your Grayson County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Grayson County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.