Skip to main content
Municipal GuideUtahNorth Ogden · Weber County

North Ogden, Utah Building Permit Guide

North Ogden City’s Building Department reviews plans, issues building permits and inspects the work inside the city, taking applications through its online permit portal.

Authority: North Ogden City Building DepartmentCode: Utah State Construction CodePhone: 801-737-9837
Authority
North Ogden City Building Department505 East 2600 North
Apply
Online building permit portalLinked from the Building page
Inspections
72 hours’ noticeMinimum, for every inspection
2025 population
21,689U.S. Census Bureau estimate

North Ogden’s Building Department, at 505 East 2600 North, issues building permits inside the city and inspects all permitted work, with applications filed through the City’s online building permit portal. Under Resolution 05-2026, effective May 13, 2026, house and commercial permit fees are the 1997 Uniform Building Code Table 1A amount plus 20%, a single-family plan check adds 50% of the permit fee, and inspections need at least 72 hours’ notice.

What requires a building permit in North Ogden?

The Building Department issues permits for new construction, additions, remodels, repairs and solar installations on existing buildings. Its building codes page adds that most repairs and alterations need a permit, including:

Homes

  • New houses, additions and remodeling
  • Re-roofing and siding
  • Electrical remodeling
  • Plumbing replacement
  • Furnace and air conditioner replacement
  • Solar installations

Site and commercial

  • New commercial buildings, additions and remodels
  • Grading ($150 grading permit)
  • Excavation permits for road cuts
  • Blasting permits

Plans for new commercial buildings, commercial additions or structural remodels, and non-structural commercial remodels over 3,000 sq ft must carry the stamp or seal of a State-licensed design professional.

Who issues North Ogden building permits?

The North Ogden City Building Department reviews construction plans against the adopted building, electrical, mechanical, energy and plumbing codes, issues permits for work inside the city, inspects that work and keeps the permit records. It works with the City’s planning, zoning and fire safety staff.

North Ogden permits only property inside its boundary. A parcel outside it belongs to the neighboring city or, if unincorporated, to Weber County’s Building Inspection Department.

Short on time to read all of this?

Get a free quote →
North Ogden Building Department contact
DetailInformation
Address505 East 2600 North, North Ogden, UT 84414
Phone801-737-9837 or 801-737-2218
Emailbuilding@northogdencity.gov
City offices801-782-7211; Monday–Thursday 8 a.m.–5 p.m., Friday 8 a.m.–1 p.m.
ApplyOnline building permit portal

Applying online

The Building Permit Applications link on the Building page opens the City’s online permit portal, where residential and commercial building permits are applied for. The department’s forms page adds three documents:

  • Owner/Builder Form, the state certification for homeowners acting as their own builder.
  • Fine Grading Requirements, the checklist for what a fine grading plan must show.
  • Gas Clearance Form, which the City uses to tell Dominion Energy that a gas meter set has been approved.

Residential applications pay a $500 plan check deposit and commercial applications a $1,000 deposit, and new construction also posts a $1,500 deposit for off-site improvements.

North Ogden permit fees

Fees come from the Consolidated Fee Schedule in Resolution 05-2026, adopted May 12, 2026 and effective May 13, 2026. Single-family and commercial building permit fees are the amount in Table 1A, Section 107.2 of the 1997 Uniform Building Code, plus 20%.

North Ogden building fees (Resolution 05-2026)
ItemFee
Single-family plan check50% of the permit fee
Commercial plan check65% of the permit fee
Plan check deposit$500 residential; $1,000 commercial
State fee1% of the permit fee
Minimum building permit$56.40
Temporary power inspection$56.40
Re-inspection$56.40
After-hours or emergency inspection$125
Off-site improvements deposit, all new construction$1,500
Grading permit$150
Excavation permit$75 plus $2.50 per sq ft of road cut
Work without a permit (red tag)$250 first offense; $1,000 for each further offense

Not sure this scope needs a permit?

Get a free quote →

Credit card service fees of up to 3.5% may apply. For a new house, connection charges include $575.51 for a 1-inch water connection in a subdivision, $56 for a sewer connection and $54.08 for construction water.

⚠️ Fee schedule amendment pending. The City Council’s October 13, 2026 agenda included a public hearing on Resolution 09-2026, amending the Consolidated Fee Schedule. Until the amended schedule is posted, the amounts here are the ones in Resolution 05-2026.

Electrical, plumbing and mechanical work

North Ogden’s Building Department reviews and permits electrical, mechanical and plumbing work along with building work. Electrical remodeling, plumbing replacement and furnace or air conditioner replacement all need a permit. On a new house the 4-way inspection covers framing, rough electrical, rough plumbing and rough heating and refrigeration before anything is concealed, and power to panel is inspected when the meter is ready to connect. When a gas meter set is approved, the City notifies Dominion Energy with its gas clearance form.

Plans, design loads and grading

Design to the current Utah State Construction Code with North Ogden’s criteria: Seismic Design Category D or E, 115 mph wind at exposure C, roof snow load from the State’s snow load site, a footing frost depth of at least 30 inches and a severe weathering classification.

A fine grading plan must match the subdivision’s approved rough grading and revegetation plans and show:

Rather talk it over?

Call 1-855-478-4290 →
  • How the site drains, with elevations and flow patterns that keep runoff from harming the house or neighbors
  • Geotechnical report requirements such as foundation drains and their outlets; without a report, cut slopes no steeper than 2:1 and fill slopes no steeper than 3:1
  • Cut or fill slopes no higher than 10 feet
  • Retaining walls no taller than 8 feet and gravity walls no taller than 6 feet, with terraced walls spaced at least the height of the tallest wall
  • Wall and slope setbacks from the foundation, generally 15 feet
  • Fault lines, floodways, slopes over 20% and easements
  • Low-impact development storm water measures

How to get a North Ogden permit: 5 steps

1. Confirm the property is in North Ogden

Then check zoning and any subdivision plat notes that affect grading.

2. Prepare plans

Follow the fine grading requirements where grading is planned, and add a design professional’s stamp where the City requires it.

3. Apply online

Submit through the online permit portal with the $500 or $1,000 plan check deposit.

4. Pay the fees

After plan check, pay the permit, plan check, state and impact fees and the off-site improvements deposit.

5. Call for inspections

Give the Building Department at least 72 hours’ notice for each inspection, through the final.

North Ogden inspections

The permit holder calls for each inspection, and North Ogden requires at least 72 hours’ notice for every one. The required stages for a new house are:

Rather not deal with the building department?

Get a free quote →
  • Sewer and water: when the lines from the road are in, before the trench is covered
  • Footing: excavation done and forms and steel in place, before concrete
  • Foundation: forms and steel in place, before concrete
  • Underground plumbing: before pipes are buried and the slab is poured
  • 4-way: framing, wiring, plumbing and heating complete, before anything is concealed
  • Flashing: before brick or stucco goes on a foundation ledge
  • Power to panel: meter base ready to connect
  • Final: all work complete, before occupancy

Re-inspections and temporary power inspections cost $56.40; after-hours or emergency inspections are $125.

Local North Ogden details

North Ogden impact fees for a single-family home
FeeAmount
Water$6,273.70
Parks$6,017.26
Transportation$2,297.37
Storm water$2,186.49
Sewer (City)$873.20
Sewer (Central Weber Sewer Improvement District)$3,575 in the City schedule from July 1, 2026; the district’s Resolution 2024-02 lists $3,611 for its fiscal year 2026 and $3,645 for 2027, charged at the rate in effect when paid
Fire$477.85
Public safety$388.93

Accessory dwelling units pay lower water ($4,893.50), sewer ($681.10), parks ($4,691.72) and transportation ($915.19) impact fees.

Road cuts: excavation in a City street is $75 plus $2.50 per sq ft of cut, with a $300 cash bond and a $2,000 performance bond; roads two years old or newer carry an extra $500 new pavement cut fee.

Utah building code

Utah adopts one construction code for the whole state; cities and counties enforce it, and any local amendments are set by the Legislature. Utah rules

Want this handled start to finish?

Get a free quote →

Official North Ogden permitting resources

North Ogden permit FAQs

Who issues building permits in North Ogden?

The North Ogden City Building Department, 505 East 2600 North (801-737-9837), for property inside the city.

Inspections are where schedules slip.

Get a free quote →

How are building permit fees calculated?

Houses and commercial buildings pay the 1997 Uniform Building Code Table 1A amount plus 20%, then 50% of that for single-family plan check (65% for commercial) and a 1% state fee.

Do I need a permit to replace a furnace or re-roof?

Yes. The City lists furnace and air conditioner replacement, re-roofing, siding, electrical remodeling and plumbing replacement as work that needs a permit.

How much notice do inspections need?

At least 72 hours for every inspection.

What are the impact fees for a new house?

The City’s water, parks, transportation, storm water, sewer, fire and public safety impact fees total $18,514.80 for a single-family home, and the Central Weber sewer district fee collected by the City adds $3,575 under the City schedule; the district’s own resolution sets higher yearly steps ($3,611 and then $3,645 per ERU, its fiscal year running July 1 to June 30).

How tall can a retaining wall be?

The City’s fine grading rules cap retaining walls at 8 feet and gravity walls at 6 feet, with terraced walls spaced at least as far apart as the tallest wall is high.

Simplify North Ogden permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Utah. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in North Ogden sooner?

Let Alliance prepare, file, and track your North Ogden permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about North Ogden permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.