Denison, Texas Building Permit Guide

Denison’s Building Department at 500 W. Chestnut issues building and trade permits inside city limits, takes every application and inspection request through My Government Online and builds to the 2024 I-Codes and 2026 NEC.

Authority: City of Denison Building DepartmentCode: 2024 I-Codes, 2026 NEC
Office
Building Department500 W. Chestnut; 903-465-2720 opt. 3
Filing
My Government OnlinePermits, registration and inspections
New home fee
$0.65 per sq ft$750 minimum (FY2027)
Inspections
Request by 3:30 p.m.Done the next business day

Inside Denison city limits, the City’s Building Department issues building, electrical, plumbing and mechanical permits, and every application and inspection request goes through My Government Online (MGO). Under the FY2027 fee schedule a new house costs $0.65 per square foot with a $750 minimum, plus a $150 plan review deposit, and inspections requested before 3:30 p.m. are done the next business day.

What requires a permit in Denison?

The Building Inspection Division’s “When is a permit required?” sheet covers building, remodeling or enlarging a building and many smaller improvements. Its list is not exhaustive; the division answers project questions on 903-465-2720, option 3.

Permit needed

  • New buildings and additions
  • Accessory buildings, including sheds, gazebos, carports and patio covers
  • Remodels that add or replace walls or windows
  • Decks, foundation repair and demolition
  • Roof replacement and siding
  • Fences, and retaining walls over 48 inches from the bottom of the footing
  • Water heaters, water softeners, furnaces and air conditioning systems
  • Electrical and plumbing work, water and sewer line replacement, lawn sprinklers
  • Pools and spas, driveway approaches, signs and security bars

No permit needed

  • Replacing fixtures on existing wiring or plumbing
  • Replacing switches, plugs and ballasts
  • Repairing or replacing a plumbing line less than one foot long
  • Changing washers and faucets
  • Repairing less than 20 feet of fence
  • Retaining walls up to 48 inches that carry no surcharge

Storage and moving pods get temporary permits of no more than 90 days, carports may not stand in front of a house, and every new home lot must be platted before a permit is issued.

Who issues permits in Denison?

The Building Department reviews plans, issues building and trade permits, inspects each stage of construction and issues Certificates of Occupancy for property inside city limits. The Fire Marshal’s office inspects fire work and joins the Building Official on temporary occupancy decisions, Planning handles site plans and zoning, and Engineering answers impact fee questions.

Denison permitting contacts
DetailInformation
DepartmentCity of Denison Building Department (Building Inspections)
Phone903-465-2720, option 3
Emailpermits@denisontx.gov
Office500 W. Chestnut, Denison, TX 75020; Monday–Friday, 8 a.m. to 5 p.m.
Online filingMy Government Online (MGO Connect)
Fire inspectionsRequest in MGO and email firemarshal@denisontx.gov
Impact feesEngineering, 903-465-2720, option 2

Short on time to read all of this?

Get a free quote →

MGO filing, registration and Denison forms

Denison does not take paper permit applications: register in MGO, then apply, upload, pay and book inspections there. Contractors must register with the City before they can pull a permit. Registration runs for one year from payment and costs $50 for general, concrete, demolition, fence, irrigation and pool contractors, sign installers and architects; licensed electrical, mechanical, plumbing, fire alarm and sprinkler, and propane contractors register at no charge.

  • Homeowner registration: free for an owner whose home carries a homestead exemption, and valid only for work at that address. Owners doing their own electrical, plumbing or HVAC sign the Homeowner Affidavit and submit it with the plans.
  • Residential forms: Residential Submittal Requirements, Residential Energy Compliance Path, Stormwater Management Application and New Construction Utility Application at submittal; the Energy Testing Compliance Certificate and Termite Protection Form before finals.
  • Commercial forms: submittal lists for new buildings and remodels, the Special Inspection Program forms, an Asbestos Survey Form, and the energy inspection and commissioning forms needed at final.
  • Backup power and solar: third-party plan review and inspection declarations for home generators, and approvals from SolarAPP+ for standard rooftop solar, uploaded to the MGO application.
  • Certificate of Occupancy: a commercial C/O application in MGO for every new business, tenant, or change of business name or owner.

Denison permit fees (FY2027)

The City’s FY2027 Comprehensive Schedule of Fees sets these building permit charges.

Not sure this scope needs a permit?

Get a free quote →
Denison building permit fees, FY2027
ProjectFee
New single-family home or duplex$0.65 per sq ft, $750 minimum
Plan review deposit, new home$150, non-refundable, at submittal
Trade permits issued with a new home$25 each
Manufactured or mobile home$750
Multi-family (3 or more attached units)$300 per unit, plus a 35% plan review deposit
Residential remodel$0.45 per sq ft, $80 minimum
Storage building, shop, garage or carport$0.25 per sq ft, $80 minimum
Stand-alone residential electrical, mechanical or plumbing$50 plus $0.05 per sq ft
Re-roof (residential / commercial)$100 / $150
Fence (residential / commercial)$50 / $100
HVAC replacement, per system (residential / commercial)$75 / $150
Water heater replacement (residential / commercial)$50 / $100
Foundation repair, generator, siding or window replacement$100 each
In-ground pool / spa or above-ground pool$300 / $50
Solar panels$150
Demolition$75
Re-inspection$100, plus $25 for each failed inspection after the second
Covering work before inspection$300
Work started without a permit$300 plus the permit fee

Commercial buildings, additions and alterations are priced on valuation, taken as the higher of the applicant’s figure and the ICC Building Valuation Data table: $50 up to $1,000; $50 plus $7 per $1,000 up to $50,000; $393 plus $6 per $1,000 up to $100,000; $693 plus $5 per $1,000 up to $500,000; $2,693 plus $3.50 per $1,000 up to $1 million; and $4,443 plus $3 per $1,000 above that. A non-refundable plan review deposit of 35% of the building permit fee is due when plans are submitted, and each trade permit issued with the job is $50.

For example, a new 2,000 sq ft house has a building permit fee of $1,300; the $150 plan review deposit is paid at submittal and each trade permit is $25. A same-day inspection requested before 9 a.m. costs $200, and if the Building Official requires third-party review or inspections on new construction, the applicant pays the third party’s actual cost.

Electrical, plumbing, gas and mechanical permits in Denison

The Building Department issues all trade permits. An electrical permit must be pulled by a licensed master electrician or by the owner of a homestead property, and Oncor will not restore altered or repaired service until the City has inspected it and sent a release. Gas work follows the same rule: a licensed plumber, or a homestead owner for residential work, pulls the permit, the system must pass a gas test (air at 3 psi or more, held for 30 minutes on a diaphragm gauge) and a City inspection before Atmos turns gas back on. Annual commercial gas tests go to the Fire Marshal at 903-465-2720 ext. 2207.

Rather talk it over?

Call 1-855-478-4290 →

Lawn sprinkler plans must come from an irrigation or plumbing contractor registered with the City, carry the irrigator’s seal and include the Irrigation Plan Requirement Checklist. Home standby generators need a registered installer with a state-licensed master electrician and master plumber on the application. Solar permits need a registered general contractor and electrician, a stamped engineer letter and a site plan. Stand-alone residential trade jobs are $50 plus $0.05 per square foot.

What to upload for a new home or commercial building

New home

  • One plan document in this order: floor plans, elevations, framing plan, wind bracing plan, engineered foundation plan with engineer letter, then electrical, mechanical and plumbing plans
  • Site plan or survey with setbacks, easements, driveway and impervious areas
  • Drainage plan with flow arrows, grade elevations and finished floor elevation
  • Manual J, S and D calculations
  • REScheck energy report and the Denison Residential Energy Compliance Path form

Commercial

  • Site plan, plus the Planning Department’s approved site plan and civil plans
  • Architectural plans with a code compliance statement, egress plan and fire-rated assembly details
  • Structural plans with an engineered foundation and wind bracing
  • Plumbing, mechanical and electrical plans with load and demand calculations
  • 2024 IECC compliance reports and the commercial compliance path form
  • A TDLR registration number for projects valued over $50,000

Each stand-alone item must be uploaded as its own named file, or the permit may be denied. Remodels need a scope of work and before-and-after drawings; additions need an engineered foundation and a site plan with distances to each property line. Foundation repairs need engineer-sealed plans showing the piers, and the engineer of record inspects the work before the City’s final.

Rather not deal with the building department?

Get a free quote →

How to get a Denison building permit

1. Book a pre-development meeting for larger projects

Use the City’s request form to sit down with staff over a concept plan before design; no engineered drawings are needed, and the meeting is not an approval.

2. Plat the lot and clear site plan review

New home lots must be platted, and non-residential, multi-family and townhome projects need a formal site plan from the Planning Department.

3. Register in MGO

Contractors register for the year; homestead owners can take out a free homeowner registration.

4. Apply and upload

Pick the project type in MGO and upload the named plan files and forms on the City’s submittal list.

5. Pay the plan review deposit and answer comments

The $150 or 35% deposit is due at submittal, and review comments are answered in the portal.

6. Pay, build and inspect

Once the permit is paid and issued, request each inspection in MGO and upload the final documents before the last inspections.

Inspections in Denison

Request inspections in MGO at any time. A request made before 3:30 p.m. is done the next business day; after 3:30 p.m. it moves a day later. Cancel in the portal up to 7 a.m. on the inspection day, after that by a comment on the project. Solar inspections run between 1 and 3 p.m. with a company representative on site, and commercial C/O building inspections between 9 and 11 a.m.

The City’s standard operating procedures for new homes list the inspections in order: erosion control, main sewer tap, temporary pole, plumbing rough (the form board survey must already be in MGO), foundation pre-pour, exterior sheathing, framing and trade rough-ins, insulation and energy compliance, electric and gas meter releases, Public Works final, and the building and trade finals.

Before finals, upload the termite protection form, the Residential Energy Testing Compliance Certificate, the engineer’s foundation letter, the customer service inspection report and a final drainage survey. Pools must pass their final within 45 days of the pre-plaster inspection.

Local Denison rules

Impact fees: water, wastewater and roadway impact fees under Ordinance 5286 took effect on April 3, 2023. They are usually set at platting and collected when the building permit is pulled, and the amount depends on the type of development and the number and size of water meters. The water and wastewater service area covers the city limits and the extraterritorial jurisdiction.

Right-of-way work: a new driveway approach needs a $50 permit, and work in public right-of-way, lane closures and pavement cuts each need their own permit with a traffic control plan and proof of insurance. Fees double if work starts first.

Roofs: only the owner of a homestead-exempt house may re-roof it personally; other roofing permits go to registered general contractors. No more than two layers of shingles are allowed.

Want this handled start to finish?

Get a free quote →

Pools: the site plan must be stamped by Oncor, pools sit at least 5 ft from rear and side lot lines and never in a front yard, a temporary fence at least 36 inches high must surround the pool during construction, and pool permits expire after 180 days.

Businesses: a Certificate of Occupancy is required before a new business or tenant opens, including a change of business name or owner, and food businesses also need Grayson County Health Department approval.

Texas building code

Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules

Denison permit resources

Inspections are where schedules slip.

Get a free quote →

Frequently asked questions

How much is a building permit for a new house in Denison?

$0.65 per square foot with a $750 minimum, plus a $150 non-refundable plan review deposit and $25 for each trade permit issued with it. A 2,000 sq ft house has a $1,300 permit fee.

Can a homeowner pull a permit in Denison?

Yes, if the house has a homestead exemption. The owner registers free in MGO and may only work at that address; owners doing their own trade work also sign the Homeowner Affidavit.

Do I need a permit for a fence, shed or deck in Denison?

Yes. Fences cost $50 for a home, all accessory buildings and decks need a permit, and sheds and garages are $0.25 per sq ft with an $80 minimum. Repairs to less than 20 feet of fence are exempt.

Do I need a permit to replace a roof or water heater?

Yes. A residential re-roof is $100 and a residential water heater replacement $50.

When will my inspection happen?

Requests made in MGO before 3:30 p.m. are inspected the next business day. A same-day inspection can be bought for $200 if requested before 9 a.m.

What codes does Denison use?

The 2024 International Codes, including the residential, building, energy, fire, existing building and pool codes, and the 2026 National Electrical Code.

How do I reach the Denison Building Department?

Call 903-465-2720, option 3, email permits@denisontx.gov or visit 500 W. Chestnut, Monday to Friday, 8 a.m. to 5 p.m.

Simplify Denison permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Denison sooner?

Let Alliance prepare, file, and track your Denison permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Denison permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.