Skip to main content
County GuideOhioAthens County

Athens County, Ohio Building Permit Guide

To get a building permit in Athens County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Athens County has no county zoning and lists no building department; the County Planner issues floodplain and subdivision permits, the City-County Health Department permits septic systems, and the Engineer issues driveway permits on county roads.

Authority: No county building departmentFloodplain and lot splits: County PlannerPhone: 740-447-5890
Zoning
None adoptedAt county level; Athens city zones
Floodplain
County Planner permitAny development in a flood area
Septic
City-County Health Dept.All new, replaced, altered systems
Driveways
County Engineer740-593-5514, county roads

Athens County has not adopted zoning, and the county site lists no building department. The county’s own land-use rules are its subdivision and floodplain regulations, administered by the County Planner (1 South Court Street, Room 124; 740-447-5890): any development in a flood hazard area needs a county permit, and so does any division of land into a parcel under 5 acres. The Athens City-County Health Department permits and inspects every new, replacement and altered home sewage system in the county, and the County Engineer issues driveway and culvert permits on county roads. In the City of Athens, the Office of Code Enforcement handles zoning, flood and contractor permits.

What requires a permit in Athens County?

Outside the cities and villages, the county itself regulates two things: splitting land and building in the floodplain. Its floodplain regulations treat a wide range of work as development that needs a permit, not only new buildings.

County floodplain permit

  • Residential and non-residential building construction
  • Installing a manufactured home
  • Substantial rehabilitation or alteration of structures
  • Accessory buildings
  • Storing materials
  • Filling and grading
  • Mining and dredging
  • Altering a watercourse

Other county permits

  • Subdivisions and lot splits: a permit from the County Planner’s office
  • New, replacement or altered household sewage systems: Health Department permit
  • Private water systems (wells): Health Department program
  • Driveway access and culverts on county roads: County Engineer
  • Utility work, hauling and frost-law posted roads: County Engineer permits

For lot splits, the county counts as a subdivision any division of land into parcels of which at least one is under 5 acres, and any division into larger parcels that needs a new street or access easement. A transfer between neighbors that does not create a building site is not a subdivision; a building site is a separately deeded parcel under 5 acres with road frontage. Contact the County Planner to learn whether a split is minor or major.

What the county decides and what the state holds

The building codes and the certification of building departments belong to the state. Athens County does not have adopted zoning regulations, so it controls land use only through its subdivision regulations and its Flood Damage Reduction Regulations, adopted by resolution in 2024 with a floodplain permit application revised in 2025. The Health Department enforces the state sewage rules (Ohio Administrative Code 3701-29) countywide, and the City of Athens runs its own zoning.

Athens County building department: who handles permitting

The county government’s site has a Regional Planner, an Engineer’s office and a link to the City-County Health Department, but no building department or building permit page. For a building at a particular address, check the Board of Building Standards look-up map to see which certified department, if any, has authority there.

Short on time to read all of this?

Get a free quote →
Athens County offices for building projects
OfficeWhat it handles and how to reach it
County Planner (Athens County Planning Commission)Floodplain development permits, subdivisions and lot splits; 1 South Court Street, Room 124, Athens, OH 45701; 740-447-5890; countyplanner@athensoh.org; County Planner Connor LaVelle, CFM, AICP
Athens City-County Health DepartmentHousehold sewage systems, private water systems, lot split reviews
Athens County EngineerDriveway culvert and access, utility, hauling and frost-law road permits; 16000 Canaanville Road, Athens; 740-593-5514; fax 740-592-4616; Monday to Friday, 7:00 a.m. to 3:30 p.m.
Athens Soil and Water Conservation District69 South Plains Road, The Plains; 740-797-9686 or 800-582-8890; Monday to Thursday 8 to 5, Friday 8 to 4:30
County offices15 South Court Street, Athens; 740-592-3219; Monday to Friday, 8:00 a.m. to 4:00 p.m.

Cities, villages and townships

Places in Athens County (2025 Census populations)
PlaceLocal permits
Athens city (25,313)Office of Code Enforcement / Community Development, 28 Curran Drive; 740-592-3306: zoning permits for residential and commercial building, flood hazard, land development, signs and use; annual contractor registration
Nelsonville city (4,488)The published sources do not say; ask the city
Glouster (1,630), Albany (1,001), Chauncey (927) villagesThe published sources do not say; ask the village office
Buchtel (479 in Athens County), Coolville (444), Jacksonville (384), Trimble (325), Amesville (168) villagesThe published sources do not say; ask the village office
TownshipsNo county zoning; county floodplain and subdivision rules apply; check the BBS look-up map for building review

The county had 63,197 residents in the Census Bureau’s 2025 estimate.

Athens County permit types

The county’s permit forms are spread across three offices: the County Planner posts the floodplain permit application, the flood regulations and the subdivision regulations; the Engineer posts its road permits; and the Health Department posts its sewage forms and fees.

Not sure this scope needs a permit?

Get a free quote →

Residential permits

  • Sewage system. Every home not on public sewer relies on an on-site system, and the Health Department must permit and inspect each new, replacement or altered one; new and replaced systems then join its operation and maintenance program.
  • Well. Through the Health Department’s private water systems program.
  • Driveway on a county road. The Engineer’s Driveway Culvert / Access Permit, starting with a stake and red ribbon at the proposed access point.
  • Floodplain permit for a house, manufactured home, addition, accessory building or fill in a flood hazard area.
  • Lot split from the County Planner where a new building site is created.

Commercial permits

Commercial and other nonresidential buildings need plan approval from a certified building department with jurisdiction, or from the state’s Superintendent of Industrial Compliance where none has it. The county’s own permits still apply to a commercial site: the floodplain permit for any development in a flood hazard area, the Engineer’s access, utility and hauling permits on county roads, and the subdivision rules for any new lot.

What comes before the building permit

  • Floodplain check: the county asks anyone considering development in a flood area to consult the planning office before starting, and the office can tell you whether a property is affected.
  • Subdivision approval where a parcel is being split.
  • Sewage approval from the Health Department for an on-site system.
  • Road access from the County Engineer on county roads; the Engineer also maintains bridges of 10-foot span or more on township roads.
  • Inside the City of Athens, a city zoning permit, with an $80 application fee, before new construction or alteration.

Athens County permit costs and fees

There is no county building permit fee because the county lists no building department. The fees that apply come from the Health Department (its environmental program fee schedule), the County Planner’s floodplain and subdivision applications and, inside the City of Athens, the city’s zoning and registration rules.

Rather talk it over?

Call 1-855-478-4290 →
Charges for Athens County projects
ItemFee or rule
Sewage system permits and inspectionsAthens City-County Health Department environmental fee schedule
County floodplain development permitCounty Planner’s 2025 permit application
Replacement driveway culvert on a county roadEngineer invoices the pipe and backfill, then installs it
New driveway culvert on a county roadApplicant builds it to the Engineer’s requirements; final inspection required
City of Athens zoning application$80; one fee covers several applications filed together for one address
City of Athens contractor registration penalty$500 per job if unregistered, up to $1,000 a year
Board of Building Standards assessment1% of residential and 3% of nonresidential fees charged by a certified department

Ask the County Planner (740-447-5890) about any fee on the floodplain or subdivision application, and the Health Department for the current sewage and water permit fees. Driveway culverts on county roads must be at least 12-inch N12 polyethylene pipe with at least a foot of cover, and the landowner is responsible for the culvert’s future maintenance, repair and replacement.

Trade permits and who may pull them

The county’s offices list no trade permit or contractor registration of their own. Trade review on a building comes from the certified department, if any, with jurisdiction over the address.

  • City of Athens contractor registration: every contractor working inside the city must register with the Office of Code Enforcement each year by June 1, with a certificate of insurance naming the City of Athens, a workers’ compensation certificate where applicable and any state license number. Working unregistered carries a $500 penalty per job, up to $1,000 a year, and the city posts the list of registered contractors.
  • Sewage system contractors work under the Health Department’s permit and inspection program.
  • State licenses: commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors hold Ohio Construction Industry Licensing Board licenses; Ohio has no state license for general or residential contractors.

Rather not deal with the Athens County building department?

Get a free quote →

How to apply for permits in Athens County

1. Place the parcel

Find whether it is in a township, a village or the City of Athens, and check the BBS look-up map for a certified building department.

2. Check the flood map

Consult the County Planner before any development near the Hocking River or another mapped flood area.

3. Split the lot if needed

Apply to the County Planner for a minor or major subdivision.

4. Settle sewage and water

Apply to the Health Department for the sewage system and well.

5. Arrange the driveway

Flag the access point and file the Engineer’s culvert and access permit for a county road.

6. File building plans where required

Commercial plans go to the certified department or the state; in Athens city, get the zoning permit first.

Review, corrections and what causes delay

The Engineer inspects the proposed access before setting the culvert size and type, and returns the form with the culvert requirements; a new culvert built by the applicant needs a final inspection. The planning office can help determine whether a property is affected by the county’s flood damage prevention regulations, so ask before design starts. Where a certified department approves plans, the approval becomes invalid if work has not started within 12 months.

Inspections and certificates in Athens County

The Health Department inspects every new, replacement and altered household sewage system, and it adds systems to its operation and maintenance program over time, including systems inspected as part of a home sale and systems in areas with a history of failures. The County Engineer makes the initial site inspection for a driveway access and the final inspection of a culvert the owner installs.

Where a certified building department has jurisdiction, it inspects the building and issues the certificate of occupancy. Inside the City of Athens, the Office of Code Enforcement inspects the city’s more than 5,300 registered rental units every year.

Ohio building code in Athens County

The state codes apply through whichever certified department has jurisdiction; the county lists none. FEMA’s Community Status Book lists unincorporated Athens County (community 390760) as participating in the National Flood Insurance Program, with a current flood map dated September 26, 2024, and the county’s Flood Damage Reduction Regulations were adopted by resolution in 2024.

Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works

Want this handled start to finish?

Get a free quote →

Athens County permit search and official resources

Ask each office for its own records: the County Planner for floodplain and subdivision permits, the Health Department for sewage and water permits, the County Engineer for road permits and land survey records (its office takes public records requests on its own form), and the City of Athens Office of Code Enforcement for city zoning permits.

Inspections are where schedules slip.

Get a free quote →

Athens County building permit FAQs

Does Athens County have a building department?

The county site lists none; check the Board of Building Standards look-up map for the address.

Does Athens County have zoning?

No. The county has not adopted zoning; it has subdivision and floodplain regulations, while the City of Athens has its own zoning.

Do I need a permit to build in the floodplain?

Yes. Any development in a county flood hazard area, from a new house to fill or grading, needs a permit from the County Planner.

Do I need approval to split my land?

Yes, where any resulting parcel is under 5 acres or a new road or access easement is needed: a permit from the County Planner’s office.

Who permits septic systems?

The Athens City-County Health Department, which must permit and inspect every new, replacement and altered household system in the county.

How do I get a driveway onto a county road?

File the County Engineer’s culvert and access permit (740-593-5514) after flagging the access point with a stake and red ribbon.

Do I need a permit to re-roof or replace siding in the City of Athens?

No. The city says re-shingling a roof and installing or replacing vinyl siding need no permit, and neither do same-size window or door replacements.

Do contractors register in the City of Athens?

Yes, every year by June 1, with proof of insurance; working unregistered costs $500 per job.

Simplify Athens County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Athens County sooner?

Let Alliance prepare, file, and track your Athens County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Athens County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.