Perry County, Ohio Building Permit Guide

To get a building permit in Perry County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Perry County relies on the Mid-East Ohio Building Department in Zanesville for commercial plan approvals, while its own health department in New Lexington issues plumbing, septic and well permits for homes and businesses.

Authority: Mid-East Ohio Building Department (commercial)Plumbing: Perry County Health DepartmentPhone: 740-455-7905
Commercial
Mid-East Ohio Building Dept10 villages + townships
State jurisdiction
HemlockDivision of Industrial Compliance
Home plumbing
$50 + plan review + $12/fixtureHealth Department, 2026
Septic permit
$307 incl. state feeSite evaluation $204

Commercial buildings in Perry County are approved and inspected by the Mid-East Ohio Building Department (22 North 5th Street, Zanesville, 740-455-7905) in the townships and in ten of the county’s villages, from New Lexington to Thornville; Hemlock is under the state. That department has no authority over one-, two- or three-family homes. The Perry County Health Department on State Route 13 in New Lexington permits and inspects plumbing in residential and commercial buildings, plus septic systems and wells, under its 2026 fee schedule, and the County Engineer issues driveway permits on county roads.

What requires a permit in Perry County?

For a commercial project, the Mid-East Ohio Building Department requires a plan approval before new construction, an addition, an alteration or a change of use on commercial property, and it confirms by phone when a scope is unclear. For a house, the permits come from the county’s own offices rather than a building department: plumbing, septic and well permits from the health department, and driveway, right-of-way and address permits from the County Engineer.

Common Perry County permits

  • Commercial plan approval and inspections, including signs, tents, generators, kitchen hoods, re-roofing and HVAC replacement on commercial property
  • Residential and commercial plumbing permits (health department)
  • Household sewage system site evaluation, permit or alteration
  • Private water system (well) construction, alteration or sealing
  • Driveway permit on a county road; right-of-way permit for other work in a county road
  • A new address from the Engineer for a new home site

Not a county building permit

  • One-, two- and three-family homes: the regional department has no authority over them
  • Driveways off county roads, which the Engineer’s driveway permit does not cover
  • Zoning, which the building department does not handle
  • Work on state-owned property, which the state handles

Work that needs no building permit can still need zoning, floodplain or health approval, so check with those offices before you build.

What Perry County decides and what the state holds

Construction standards are the statewide Ohio codes, enforced by a department the Board of Building Standards certifies; Perry County is served by Muskingum County’s regional department for commercial work. The county itself sets its health department’s fees, its subdivision regulations and conveyance standards, its driveway rules on county roads and its address system. FEMA lists unincorporated Perry County (community 390778) as participating in the National Flood Insurance Program, with flood maps dated August 15, 2017.

Perry County building department: who handles permitting

Which office you need depends on the work and the village or township. The table groups the county’s places by who reviews commercial building plans, as the Mid-East Ohio department’s jurisdiction list (revised October 24, 2024) sets them out.

Short on time to read all of this?

Get a free quote →
Commercial building authority by place
PlacesCommercial plan approval
Unincorporated townships; villages of New Lexington, Crooksville, Roseville (shared with Muskingum County), Corning, Shawnee, Junction City, New Straitsville, Thornville, Glenford and SomersetMid-East Ohio Building Department, 740-455-7905
Village of Hemlock (the list also names Rendville)State of Ohio, Division of Industrial Compliance, 614-644-2223
Perry County offices
OfficeHandlesContact
Mid-East Ohio Building Department (Chief Building Official Jason R. Baughman, PE)Commercial plans, inspections and certificates of occupancy22 North 5th Street, Zanesville; Monday to Friday 8:00 a.m. to 4:30 p.m.
Perry County Health DepartmentPlumbing, septic, wells2235 State Route 13, New Lexington; 740-342-5179; Monday to Friday 7:30 a.m. to 4:00 p.m.
Perry County EngineerCounty road driveway and right-of-way permits, addresses, lot splits2645 Old Somerset Road, New Lexington; 740-342-2191; Monday to Friday 7:30 a.m. to 4:00 p.m.
Perry Soil & Water Conservation DistrictConservation and land-use help212 South Main Street, Lower Level, New Lexington; 740-743-1325
Board of County CommissionersCounty resolutions and general questions212 South Main Street, New Lexington; 740-342-2045

County resolutions go before the Board of Commissioners, which meets every Wednesday from 9:00 a.m.; agendas are posted on Tuesday afternoons, and an open comment session runs from 8:30 to 9:00 a.m. on the third Wednesday of each month. The Board of Building Standards’ building-department look-up shows the authority for an address on a map. For development in a mapped flood area, ask the Commissioners’ office (740-342-2045) which county office reviews it.

Perry County permit types

Perry County has no county building department, so the permits fall into three groups: commercial plan approvals from the regional department, health permits, and road and address permits.

Residential permits

The Mid-East Ohio department states it has no authority over one-, two- or three-family dwellings, and the county’s pages list no residential building department. Ohio law says that where no department certified for residential buildings has jurisdiction, the owner is not required to submit plans for a house. A new home in the county still meets the health department (a septic site evaluation and permit where there is no sewer, a well permit where there is no public water, and a residential plumbing permit with an isometric drawing), the Engineer (address and, on a county road, a driveway permit) and any village or township zoning.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial projects, and buildings of four or more dwelling units, file a Plan Approval Application with Mid-East Ohio online or at its Zanesville office, with digital plans or three printed sets. Each structure needs its own application so that each gets its own certificate of occupancy, and a site plan is required although civil drawings are not. The department uses a frost depth of 36 inches and notes that its region spans two snow-load zones on the Ohio Building Code map. Plans must be prepared, signed and sealed by an Ohio-licensed design professional, with limited exceptions, and a general contractor does not need to be named to submit.

What comes before the building permit

  • Zoning. The building department has no zoning authority; ask the village, or the township trustees in the unincorporated county, what zoning approval applies.
  • Septic site evaluation. $204 for the evaluation and design before a $307 septic permit.
  • Well permit. $490 for a private water system serving a one-, two- or three-family dwelling.
  • Driveway and right-of-way. The Engineer’s driveway permit applies to county roads only; other work in a county road needs its right-of-way permit.
  • Lot splits and new lots. The Engineer’s split form and the county subdivision regulations and conveyance standards; the health department charges $110 to review a lot split.

Perry County permit costs and fees

Two fee schedules matter most: the Perry County Health Department’s 2026 Fee for Service Schedule, and the Mid-East Ohio Building Department’s plan approval fees, revised in November 2025. Certified building departments also collect the Board of Building Standards assessment, 3% of nonresidential fees; the Mid-East Ohio schedule does not show it as a line, so ask whether its figures include it.

Rather talk it over?

Call 1-855-478-4290 →
Perry County Health Department fees (2026)
PermitFee
Residential plumbing$50 application + plan review ($40 for 2–20 fixtures, $60 for 21–40, $80 for 41–60, $100 for 61–80, $150 for 81+) + $12 per fixture
Commercial plumbing$200 application + $200 plan review + $20 per fixture
Plumbing re-inspection / early installation penalty$50 per trip / $150
Commercial water heater replacement or water conditioner inspection$50 each
Septic operation permit / septic installer registration$30 ($60 commercial) / $37
Plumbing contractor registration (annual) / homeowner specialty registration$100 with a $20,000 bond / $50, one time
Septic site evaluation and design / new septic permit / alteration$204 / $307 ($233 + $74 state fee) / $235
Private water system, 1–3 family / alteration / sealing$490 ($398 + $92 state fee) / $190 / $70

Worked example from the health department schedule: plumbing for a new house with 15 fixtures costs the $50 application fee, $40 plan review for 2 to 20 fixtures and 15 × $12, or $180, for a total of $270. The same 2026 schedule lists a commercial small-flow septic permit at $258 ($233 plus a $25 state fee), a sewage variance application at $70, a compliance or additional inspection at $60, and a septage hauler vehicle permit at $56 per truck.

Mid-East Ohio commercial plan approval fees (rev. Nov. 2025)
ItemFee
Structural$250 processing + $10.50 per 100 sq ft, rounded up to the next 100
Mechanical / electrical / fire suppression$250 processing + $8.25 per 100 sq ft each
Fire alarm$250 + $8.25 per device
Existing-building certificate / temporary occupancy$350 / $350
Re-roof (up to 50,000 sq ft) / tent$250 / $250
Field inspection or re-inspection / working without approval$125 / $500 fine

Commercial fees are due when you apply, by cash, card or check, and Mid-East Ohio does not review plans until they are paid; its online payment portal adds a 3% card fee.

Trade permits and who may pull them

Plumbing is the one trade the county permits for houses. The health department administers and inspects new plumbing and alterations in residential and commercial buildings across the county, keeps a list of registered plumbing contractors, and registers them each year for $100 with a $20,000 bond. A homeowner doing a one-time installation registers as a specialty registrant for $50 and signs the department’s homeowner disclaimer.

Rather not deal with the Perry County building department?

Get a free quote →
  • Electrical and HVAC: on commercial work these are part of the Mid-East Ohio plan approval, each with its own processing fee. The county’s pages list no electrical or HVAC permit for one- to three-family homes.
  • State licenses: commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors hold OCILB licenses; Ohio has no state general-contractor license.
  • Septic installers: register with the health department ($37), and septage haulers and service providers have their own registrations.
  • Overlap to know about: the Zanesville-Muskingum County Health Department also lists Perry County among its plumbing inspection areas, while Perry’s own department says it runs plumbing here; start with the Perry office on State Route 13.

How to apply for permits in Perry County

1. Identify the village or township

Check the place against the jurisdiction list: Hemlock goes to the state, the rest to Mid-East Ohio.

2. Clear zoning

Ask the village office or township trustees about any zoning permit before buying materials.

3. Book the septic site evaluation

Unsewered lots need the health department’s $204 evaluation and design before the septic permit.

4. Get the address and driveway permit

The Engineer assigns addresses and issues driveway permits on county roads.

5. File plumbing and commercial plans

Plumbing application with an isometric drawing to the health department; commercial plans to Mid-East Ohio with fees.

6. Schedule inspections

Plumbing on the health department’s inspector days; building inspections with Mid-East Ohio a day ahead.

Review, corrections and what causes delay

A residential plumbing permit is not issued until the isometric drawing is in, and plumbing installed before the permit carries a $150 early-installation penalty. Mid-East Ohio reviews everything submitted by 4:00 p.m. on Friday during the following week and offers no walk-through or expedited review, so missing pages push a job a week at a time. Fire alarm, suppression and truss drawings can be deferred, and revisions go in through the department’s plan update link.

Inspections and certificates in Perry County

The health department’s plumbing inspector is available on Tuesdays from 8:00 to 11:00 a.m. and Thursdays from 1:00 to 4:00 p.m.; each re-inspection trip costs $50.

On commercial jobs Mid-East Ohio lists the required inspections with the approval, needs at least 24 hours’ notice by phone at 740-455-7905 with the plan approval number, and expects fire alarm, sprinkler, hood, gas pressure and HVAC systems to be pre-tested. If an inspection fails, follow the inspector’s instructions and check the work against the approved drawings before calling again. A certificate of occupancy follows the last passed inspection, and the department’s position is that all commercial property should hold one. Its records start in 1996.

Want this handled start to finish?

Get a free quote →

Ohio building code in Perry County

Commercial work in Perry County is reviewed under the Ohio Building Code by the Mid-East Ohio Building Department, and plumbing is inspected against the state plumbing code by the health department.

Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works

Perry County permit search and official resources

There is no shared online permit search. Ask the Mid-East Ohio Building Department for commercial plan approvals and certificates with a records request giving the business name and address; ask the health department for plumbing, septic and well records; and ask the Engineer for driveway and address records.

Inspections are where schedules slip.

Get a free quote →

Perry County permit FAQs

Who approves commercial buildings in Perry County?

The Mid-East Ohio Building Department in Zanesville, for the townships and ten villages; Hemlock is under the state’s Division of Industrial Compliance.

Do I need a building permit for a house?

The regional department has no authority over one- to three-family homes and the county lists no residential building department, but plumbing, septic, well and driveway permits still apply.

How much is a plumbing permit for a new house?

$50 plus a plan review fee by fixture count and $12 per fixture; 15 fixtures come to $270.

Can a homeowner do their own plumbing?

The health department offers a $50 one-time specialty registration for a homeowner installation, with a homeowner disclaimer form.

What does a septic permit cost?

$204 for the site evaluation and design, then $307 for a new system permit, including the state fee.

Where do I get a driveway permit?

From the Perry County Engineer, whose driveway permit covers driveways on county roads only.

Does the building department handle zoning?

No. Mid-East Ohio has no zoning authority; zoning, where it exists, comes from the village or township.

Simplify Perry County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Perry County sooner?

Let Alliance prepare, file, and track your Perry County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Perry County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.