Apex building permits come from the town's own Building Inspections & Permitting Department on Mason Street. Wake County does not permit inside the town limits, and Apex is not one of the county's four contract towns.
The town runs two systems — ePermits for permits, payments, and inspection results, and IDT for electronic plan review with its own registration — and has signalled that new software is on the way. Confirm the current arrangement before you build a workflow around either.
Applies inside Apex town limits, including the portion of the town extending into Chatham County.
Apex waives permit and inspection fees on solar where solar panel installation is the only work. That is a genuine incentive and rare in North Carolina — but bundling other scope into the same record forfeits it.
What requires a permit in Apex?
An Apex building permit is required before construction or alteration of any building, structure, plumbing, mechanical, or electrical system — the basic administrative device North Carolina requires. Apex runs its own Building Inspections & Permitting Department; Wake County does not permit inside the town limits, and Apex is not one of the county's contract towns.
The enforced edition is the 2018 NC State Building Code family (2018 Residential Code, 2020 NC Electrical Code). The 2024 NC State Building Code was originally slated for January 1, 2025, but S.L. 2024-57 and then S.L. 2025-2 (the Disaster Recovery Act of 2025, passed after Hurricane Helene) pushed its effective date to 12 months after the State Fire Marshal certifies publication and the seating of the new Residential Code Council — currently expected no earlier than 2027. Until then the 2018 code governs, though an owner may elect the 2024 code as an alternate method under § 102.5 of the Administrative Code if the plan set says so clearly.
Permit required
- New construction, additions, and alterations to one- and two-family dwellings
- Commercial construction, upfits, and alterations
- Finishing basements and bonus rooms
- Plumbing, mechanical, and electrical system work
- Retaining walls, which carry their own application per address
- Irrigation systems, grading, and temporary trailers
- EV charger installation, on a dedicated application
- Demolition, and permanent signage
Typically exempt
- Nonstructural work costing forty thousand dollars or less in a single-family home, farm building, or commercial building (G.S. 160D-1110(c))
- Replacement windows, doors, exterior siding, and porch/deck pickets, railings, stair treads, and decking
- Like-for-like plumbing swaps that keep size and capacity, and like-kind light fixtures, receptacles, and switches
- Same-spec water heater changeouts installed by a licensed contractor
- Painting, flooring, cabinetry, and other cosmetic work
Apex building department: who handles permitting
The Town of Apex Building Inspections & Permitting Department works from 322 N. Mason Street, performing field inspections, reviewing and approving structural building plans, and providing guidance on state and local codes. The town runs two systems: ePermits for permit applications, fee payment, and inspection results, and IDT for electronic plan review, where you register separately and upload plans.
Public information is genuinely open here. The Public Information Search requires no account — enter the last six digits of a permit number or an address and every issued permit displays, with inspection results and inspector information available inside each one. Note also that the town has signalled new permitting software is rolling out, so confirm the current system before building a workflow around either portal.
| Detail | Information |
|---|---|
| Office | Building Inspections & Permitting, 322 N. Mason Street, Apex, NC 27502 |
| Phone | (919) 249-3418; inspection requests (919) 249-3388 |
| Hours | Monday–Friday, 8:00 a.m.–5:00 p.m. |
| Permits and payments | ePermits portal |
| Plan review | IDT electronic plan review, with separate registration |
| Inspection cutoff | Scheduled the day before, prior to 2 p.m. |
Apex waives permit and inspection fees on solar when the only work is solar panel installation. That is a real incentive and one of very few of its kind published by a North Carolina jurisdiction — worth checking against your scope, because bundling other work into the same record forfeits it.
This guide covers the Town of Apex, North Carolina, in Wake County. Apex has no interstate twin of consequence. Locally, note that Apex extends into Chatham County as well as Wake, and that Wake County does not permit inside the town — Apex is not one of the county's four contract towns.
Apex permits: record types and what each covers
Apex publishes a long, specific application list, and picking the right one is most of the intake battle. These are the records you will file:
Residential permit types
| Permit type | What triggers it | Review path | Fee basis |
|---|---|---|---|
| New construction | New dwellings, additions, and accessory structures over the statutory exemption ceiling | Full plan review against the 2018 NC Residential Code, plus zoning | Valuation-based |
| Renovation / alteration | Load-bearing changes, layout changes, or added plumbing, HVAC, or electrical | Plan review scaled to scope; 15-business-day residential clock applies | Valuation-based |
| Reroof | Roof covering replacement, and any work that adds rather than replaces roofing | Sheathing and dry-in inspection; plan review rarely required | Valuation or squares |
| Solar photovoltaic | Rooftop or ground-mount PV, with or without battery storage | Electrical review led, with structural review of the attachment | Flat or system-size based |
| Battery energy storage | Wall or floor-mounted ESS added to a dwelling | Electrical review plus fire separation and location check | Flat or per-permit minimum |
| Electrical | Service changes, panel upgrades, new circuits, EV chargers, most rewiring | Trade review by the electrical inspector; filed as its own record | Per-permit minimum or per-device |
| Plumbing | New piping, repipes, fixtures, gas piping, and non-identical water heater swaps | Trade review; like-for-like same-capacity swaps are statutorily exempt | Per-permit minimum or per-fixture |
| Mechanical / HVAC | Changeouts that are not like-for-like, ductwork, and refrigeration | Trade review by the mechanical inspector | Per-permit minimum or per-unit |
| Deck and porch | New decks and structural rebuilds; pickets, rails, treads, and decking are exempt replacements | Footing and framing review against the residential code | Flat or valuation-based |
| Pool and spa | In-ground and above-ground pools, spas, barriers, and bonding | Structural, barrier, and electrical bonding review | Valuation-based |
| Accessory structure | Sheds, detached garages, and carports above the local size threshold | Zoning first, then structural review where applicable | Flat or valuation-based |
| Demolition | Full or partial demolition of a structure | Utility disconnect verification and asbestos notification | Flat |
| Solar application | Where solar panel installation is the only work | Permit and inspection fees waived | No fee |
| Irrigation permit | Residential and commercial irrigation systems | Its own application separate from plumbing | Town fee schedule |
| Retaining wall permit | One application per address | Structural review of the wall design | Town fee schedule |
Commercial permit types
| Permit type | What triggers it | Review path | Fee basis |
|---|---|---|---|
| New construction | Ground-up commercial, industrial, and multifamily buildings | Full multi-discipline review; sealed plans required | Valuation-based |
| Upfit / tenant improvement | Interior build-outs and suite fit-ups in an existing shell | Concurrent building, trade, and fire review | Valuation-based |
| Renovation / alteration | Structural, envelope, or system changes to an existing building | Plan review scaled to scope; accessibility triggers attach | Valuation-based |
| Change of occupancy | Converting a building from one occupancy classification to another | Life-safety, accessibility, and zoning review | Valuation or flat |
| Shell building | A building permitted without a known tenant or use | Shell review only; no certificate of occupancy until an upfit closes | Valuation-based |
| Reroof | Commercial roof covering replacement or recover | Structural check on added dead load; fire review where applicable | Valuation or squares |
| Solar photovoltaic | Commercial rooftop, carport, and ground-mount arrays | Structural, electrical, and fire access review | Valuation or system-size based |
| Electrical | Service, distribution, and branch circuit work | Trade review; separate record from the building permit | Valuation or per-device |
| Plumbing | Supply, waste, vent, grease, and gas systems | Trade review; backflow and grease interceptor sign-offs attach | Valuation or per-fixture |
| Mechanical / HVAC | Rooftop units, ductwork, exhaust, and refrigeration | Trade review; energy compliance documentation required | Valuation or per-unit |
| Fire protection | Sprinkler, standpipe, alarm, hood, and suppression systems | Fire prevention review, often a separate submittal | Valuation or per-device |
| Sign | Wall, monument, and illuminated signage | Zoning review plus electrical where illuminated | Flat or per-sign |
| Grading permit | Site work before the building permit, or subdivision site work | Engineering review; over-threshold insurance documents required | Town fee schedule |
| Conditional Utility Request | Commercial utility connection ahead of full occupancy | Reviewed against the readiness of the systems involved | Town fee schedule |
| Certificate of Insurance to the Town | Projects over the statutory threshold | Must name the Town of Apex specifically; a generic certificate will not do | No separate fee |
Residential
- Single-discipline review in most cases
- One permit covers simultaneous same-address residential projects (G.S. 160D-1110(d))
- The 15-business-day review clock and its 10%-per-day fee refund apply
- No engineer's or architect's seal may be demanded unless the code itself requires it
Commercial — multi-discipline
- Concurrent review across building, trades, fire, and zoning
- Signed and sealed plans across every affected discipline
- Third-party plan review available under G.S. 160D-1110.1 when review stalls
- Accessibility and life-safety review attach to any change of occupancy
Records you will actually see in Apex
| Record | What it covers |
|---|---|
| One and Two-Family Dwelling permit | With its own plan checklist to submit alongside |
| Commercial Projects permit | With a commercial checklist and plan modification route |
| Retaining wall permit | One application per address |
| Grading permit | To begin site work before the building permit issues, or for subdivisions |
| Demolition permit | Where demolition precedes a permit or there is no new permit to issue |
| EV Parking application | Dedicated application for EV charger installation |
| Irrigation permit | Its own application, residential and commercial |
| Solar application | Permit and inspection fees waived where solar is the only work |
Solar permits in Apex
Solar is its own record in North Carolina rather than a line item on a building permit, and it is reviewed on two tracks at once: the electrical side (conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection) and the structural side (attachment detail, rail spacing, and whether the existing framing carries the added dead load).
Apex is one of very few North Carolina jurisdictions to waive permit and inspection fees on solar-only work. Use the town's dedicated solar application and instructions, and keep other scope on a separate record so the waiver survives.
The HOA question comes up on nearly every residential array, and North Carolina answers it more favourably than most states. G.S. 22B-20 voids covenants that prohibit — or merely have the effect of prohibiting — rooftop solar, and in Belmont Association v. Farwig (2022) the NC Supreme Court held a review committee's general aesthetic authority cannot block street-facing panels: an HOA must ban them explicitly, and even then cannot force a relocation that defeats reasonable use (a north-facing roof cutting output roughly in half fails that test). Condominiums under Chapters 47A/47C sit outside the statute.
Utility interconnection runs on its own clock alongside the permit. Duke Energy and the state's electric cooperatives each set their own application, meter, and witness-test sequence, and the utility's approval to energize is not something the inspection department controls — plan for the two tracks to finish at different times.
Roofing permits in Apex
A roof covering replacement needs a permit in most of North Carolina, and the statutory exemption is narrower than contractors expect: replacing roofing is treated differently from adding roofing, and adding a layer pushes the job out of the exemption regardless of what it costs.
Because North Carolina runs a statewide code, there is no state product-approval database to search and no local product-approval number to cite — the assembly simply has to comply with the NC code and the manufacturer's listed installation instructions, which is what the inspector checks against.
Reroofs inside Apex are town permits, not Wake County ones. Note the inspection cutoff when you sequence a roof: requests must be in the day before, prior to 2 p.m., which is earlier than most of the Triangle.
Sequencing is where reroofs go wrong. The sheathing and dry-in condition has to be visible when the inspector arrives, so covering it before the inspection means opening it back up. On a structure that has had a previous layer removed, expect the inspector to look at deck fastening and at any decking replaced along the eaves.
Apex permit cost
Apex building permit fees follow the town's adopted schedule, paid in the ePermits portal alongside application and re-inspection fees. Trade permits are charged separately.
The one genuine break: where the only work is solar panel installation, permit and inspection fees are waived. On the other side, projects over forty thousand dollars carry insurance and lien agent documentation obligations that add administrative time even where they add no fee.
| Fee component | How it works |
|---|---|
| Building permit | Town fee schedule; paid in the ePermits portal |
| Trade permits | Charged separately per trade record |
| Solar-only work | Permit and inspection fees waived |
| Over forty thousand dollars | Workers' Comp affidavit, Certificate of Insurance to the Town, lien agent form |
| Re-inspection | Charged on failed inspections; payable in ePermits |
| Public search | Free and account-free by permit number or address |
Want a precise number for a specific Apex project? Send us the scope and we will price the permit path before you file.
Apex trade permits
Apex trade permits for electrical, plumbing, and mechanical work are separate records, and the town publishes a Change of Subcontractor form for keeping the record current when a trade changes mid-project.
Electrical permits
Required for services, panel upgrades, circuits, EV chargers, and solar interconnection. Electrical work takes a contractor licensed by the NC State Board of Examiners of Electrical Contractors.
Plumbing permits
Required for new piping, repipes, fixtures, gas piping, and non-identical water heater changeouts by a state-licensed contractor.
Mechanical (HVAC) permits
Required for installations, non-identical changeouts, ductwork, and refrigeration by a state-licensed heating contractor.
Change of Subcontractor
Apex publishes a dedicated form for both residential and commercial — file it rather than letting the permit record drift out of date when a trade changes.
Apex permit application: how to apply step by step
Here is how to get a building permit in Apex, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.
Apex publishes separate applications by project type, each with its own checklist. Using the correct form is a stated requirement before uploading plans.
ePermits for permits and payments; IDT separately for electronic plan review, with an activation email and a confirmation email before you can upload.
Projects over forty thousand dollars need a Workers' Comp affidavit, a Certificate of Insurance issued to the Town of Apex, and a lien agent form.
If the only work is solar panel installation, permit and inspection fees are waived — use the town's solar application and instructions.
Follow the town's published upload instructions, using the correct application form for the project type.
Inspections must be scheduled the day before the intended inspection, prior to 2 p.m., online or in person at the Building Inspection desk.
Inspections in Apex
Apex inspections must be scheduled the day before the intended inspection, prior to 2 p.m., either online or in person at the Building Inspection desk. A basic room addition, for example, requires footing, foundation, rough-in, insulation, and final inspections in that order.
Authorisation must be obtained from the Code Enforcement Officer after each inspection before proceeding to the next step of construction — the town states this as a sequencing rule rather than a courtesy, and the details of what each inspection requires are set out in the town's dwelling and commercial construction policies. G.S. 143-139 requires code enforcement inspections to be performed within two business days of the request. That is a statutory duty, not a courtesy, and it sits alongside G.S. 160D-1104's requirement that the inspector complete every inspection requested for a scheduled visit and itemize exactly what failed.
Keep the permit and approved plans on site. an NC building permit expires six months after issuance if work has not commenced (local ordinance can set less), and expires immediately if work stops for 12 months (G.S. 160D-1111) — changes from approved plans need written inspection-department approval first (G.S. 160D-1112).
Apex permit search and official resources
Run an Apex permit search without an account, open ePermits, or download an application with the official links below.
- Town of Apex Building Inspections & Permits
- Obtaining a building permit in Apex
- Apex forms and applications
- Apex ePermits portal
- NC Licensing Board for General Contractors
- LiensNC — designate a lien agent
Frequently asked questions
Who issues building permits in Apex, NC?
The Town of Apex Building Inspections & Permitting Department, at 322 N. Mason Street. Wake County does not permit inside the town limits, and Apex is not one of the county's four contract towns.
Does Apex charge for solar permits?
No — where the only work is solar panel installation, permit and inspection fees are waived. The town publishes a dedicated solar application and instructions. Bundling other work into the same record forfeits the waiver.
When do I have to schedule an Apex inspection?
The day before the intended inspection, prior to 2 p.m. Requests can be made online or in person at the Building Inspection desk. That is one of the earlier cutoffs in the Triangle.
What do I need on a project over forty thousand dollars in Apex?
A Workers' Compensation affidavit, a Certificate of Insurance issued to the Town of Apex, and a lien agent form. Note that the certificate must name the town specifically — a generic certificate will not satisfy the requirement.
What is the difference between ePermits and IDT in Apex?
ePermits handles permit applications, fee payment, and inspection results. IDT is the electronic plan review system, requiring separate registration with an activation email and a confirmation email before you can upload plans.
Can I search Apex permits without an account?
Yes. The Public Information Search needs no account — enter the last six digits of a permit number or type in an address, and all issued permits display. You can open any permit to see general information and inspection results.
Do I need authorisation between Apex inspections?
Yes. Authorisation must be obtained from the Code Enforcement Officer after each inspection before proceeding to each subsequent step of construction. It is a stated sequencing rule, not a formality.
Is Apex changing its permitting software?
The town has signalled that new software is rolling out. Confirm the current system before building a workflow around either existing portal, particularly if you file here regularly.
Do I need a permit to finish a basement in Apex?
Yes. Finishing basements and bonus rooms requires a permit, as does work on plumbing, mechanical, or electrical systems. Contact the Building Inspection Permit Office if you are unsure whether a specific scope is exempt.
What applications does Apex publish?
A long and specific list: one- and two-family dwelling, commercial projects, retaining wall, grading, demolition, irrigation, manufactured home, permanent sign, temporary trailer, EV parking, conditional utility request, driveway and curb cut, and change of subcontractor.
When is a general contractor licence required in Apex?
On projects of forty thousand dollars or more, under G.S. 87-1 and the NC Licensing Board for General Contractors, with tiers capping single-project value at $750,000, $1,500,000, or without limit excluding land cost.
Does Apex extend into more than one county?
Yes — Apex extends into Chatham County as well as Wake. The town permits its own work throughout, but the county of record for the parcel follows the boundary rather than the town limit.
Simplify Apex permitting with Alliance Permitting
A town with two portals, a third on the way, an early inspection cutoff, a certificate of insurance that must name the town by name, and free solar permits nobody mentions — Apex rewards a filer who has been through it recently. That is what a permit expediter for Apex brings.
Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.
Contractors and builders choose Alliance for Apex because the work is done by people who have stood at the counter:
- Right form, right system — correct application into ePermits, plans into IDT, no rejected upload.
- Incentives used — the solar fee waiver applied where the scope qualifies for it.
- Complete oversight — every Apex permit and inspection tracked across your jobs in one place.
Alliance Permitting is a permit documentation and expediting service. We are not a law firm and do not provide legal advice, and we are not the permitting authority.
Ready to break ground in Apex sooner?
Let Alliance prepare, file, and track your Apex permits while your crew stays on the job.