Skip to main content
County GuideNew YorkSaratoga County

Saratoga County, New York Building Permit Guide

To get a building permit in Saratoga County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Saratoga County runs no building department and has opted out of the enforcement of the Uniform and Energy codes, so its two cities, 19 towns and nine villages each issue their own permits; most house septic systems are approved by those local offices too.

Authority: City, town and village code offices (30 municipalities)Code: 2025 NYS Uniform Code and Energy Code
Building permits
Local offices2 cities, 19 towns, 9 villages
County role
Opted outOf the Uniform and Energy codes (DOS list)
House septic
Local building officeCounty Health reviews subdivisions and regulated facilities
County roads
DPW permitHighway Law 136; 518-885-2235

Saratoga County has no building department of its own and is one of the twelve New York counties that the Department of State lists as having opted out of the enforcement of the Uniform and Energy codes. Every building permit therefore comes from a local office: the cities of Saratoga Springs and Mechanicville, the 19 towns for land outside their villages, and the nine villages for land inside them. Even a house septic system is usually a local matter here, because the county Health Department sends residential systems outside realty subdivisions back to the local building department. The county itself permits work in county road rights-of-way and reviews zoning referrals through its Planning Board.

What requires a building permit in Saratoga County?

Each town and village sets its own exemptions under the state code. The Town of Day requires a permit for all phases of building except an accessory structure under 100 sq ft, and does not require one for fences up to six feet. Clifton Park exempts sheds of 144 sq ft or less, while Moreau and Wilton have no shed exemption at all, and Ballston asks for a permit once a shed passes 120 sq ft. Galway reminds owners that most building projects need a permit and that 911 numbers must be visible from the road in both directions.

Local permit

  • New houses, additions and alterations
  • Sheds, garages, decks and pools on each place’s rules
  • Septic systems for single houses, in most towns
  • Demolition and changes of use
  • Solar, generators and fuel-burning equipment where listed

County approvals

  • Any work in a county road right-of-way: DPW permit under Highway Law 136
  • Septic and water plans for realty subdivisions and regulated facilities: county Health
  • Zoning, site plan, special use, variance and subdivision actions near county roads, town lines or farms: county Planning Board referral

What the municipalities decide and what the state holds

The construction standards are the state’s 2025 Uniform Code and Energy Code everywhere. Because Saratoga County opted out, it does not enforce the code in a city, town or village that has also opted out; there, the Department of State’s Code Inspection Unit provides code enforcement and administration in place of the local government and charges fees for it. The unit tells owners and contractors on private projects to contact their town, city or village office. Local law covers the rest: zoning, fee schedules, shed and fence rules, septic permits and moratoria such as Clifton Park’s cannabis moratorium, Milton’s solar and battery moratorium and Moreau’s storage-warehouse moratorium, each described in that town’s guide.

Saratoga County building department: who handles permitting

All 30 municipalities are below. Ballston Spa is split between Ballston and Milton; every other village lies inside one town. Several small towns share officers: the Town of Corinth and the Town of Hadley name the same code enforcement officer, and Schuylerville and the Village of Stillwater list the same officer’s number.

Short on time to read all of this?

Get a free quote →
Building permit offices in Saratoga County (30 municipalities)
PlaceWho issues building permitsOfficial page
Saratoga Springs (city)City Building Department, 474 Broadway, Suite 32, 518-587-3550Building Department
Mechanicville (city)City building and code enforcement officer, 518-664-9884 ext. 330; weekdays 6 a.m. to 2:30 p.m.Building & Code
Ballston (town, outside its part of Ballston Spa)Town Building Department, 323 Charlton RoadSee the Ballston guide
Ballston Spa (village, in Ballston and Milton)Village Building Department, 66 Front Street (downstairs), 518-288-4006Building Department
Charlton (town)Town government; ask Town HallNo official building page found
Clifton Park (town, no villages)Town Building & Development Department, 1 Town Hall Plaza, 518-371-6702; filing on CitizenserveSee the Clifton Park guide
Corinth (town, outside the village)Town Building Department, which is also the local flood administratorBuilding Department
Corinth (village, in Corinth)Village code enforcement officer under Village Code Chapter 253Village Code Ch. 253
Day (town)Town code enforcement officer / building inspector, Town Hall, 518-696-3789 ext. 0Code Enforcement
Edinburg (town)Town Code Enforcement office, 518-863-2793 ext. 107Code Enforcement
Galway (town, outside the village)Town code enforcement officer and building inspector, 5910 Sacandaga Road, 518-882-6070 ext. 19Code Enforcement
Galway (village, in Galway)Village government; ask the village office who inspectsNo official building page found
Greenfield (town)Town Building Department, 518-893-7432 ext. 304Building
Hadley (town)Town building inspector / code enforcement officer, 4 Stony Creek Road, 518-696-3112 ext. 4Building & Code Enforcement
Halfmoon (town, no villages)Town Building & Code Enforcement, 2 Halfmoon Town Plaza, 518-371-7410 ext. 2260See the Halfmoon guide
Malta (town, outside Round Lake)Department of Building & Planning, 2540 Route 9See the Malta guide
Round Lake (village, in Malta)Village code enforcement officer under Village Code Chapter 91See the Malta guide
Milton (town, outside its part of Ballston Spa)Building / Zoning / Planning Department, 503 Geyser RoadSee the Milton guide
Moreau (town, outside South Glens Falls)Town Building Department, 351 Reynolds RoadSee the Moreau guide
South Glens Falls (village, in Moreau)Village building inspector / code enforcement officer, 46 Saratoga Avenue, 518-793-1455 ext. 105See the Moreau guide
Northumberland (town)Town Building Department, 17 Catherine Street, Gansevoort, 518-792-9179 ext. 112Building Department
Providence (town)Town building and code enforcement officer, by appointment, 518-882-6541 ext. 107Building and Code Enforcement
Saratoga (town, outside its villages)Town zoning officer / building inspector, 518-695-3644; Tuesday to Thursday 7 to 10 a.m.Zoning Officer/Building Inspector
Schuylerville (village, in Saratoga)Village code enforcement officer, call or text 518-788-6042Code Enforcement
Victory (village, in Saratoga)Village government; ask the village office who inspectsNo official building page found
Stillwater (town, outside the village)Department of Building, Planning & Development, 881 Hudson Avenue, 518-664-6148 ext. 215See the Stillwater guide
Stillwater (village, in Stillwater)Village code enforcement officer, 518-788-6042See the Stillwater guide
Waterford (town, outside the village)Town Building Code Administrator & Enforcement, 1 Tugboat Alley, 518-235-3802Town departments
Waterford (village, in Waterford)Village government; ask the village office who inspectsNo official building page found
Wilton (town, no villages)Town Building Department, 22 Traver Road, 518-587-1939 ext. 603See the Wilton guide

Not sure this scope needs a permit?

Get a free quote →

Hours in several rural towns are short: the Town of Saratoga’s inspector works Tuesday to Thursday mornings from 7 to 10, Northumberland’s weekday mornings and Tuesday evenings, and Providence by appointment. Mechanicville’s officer starts at 6 a.m. For Charlton, the Village of Galway, Victory and the Village of Waterford, call the municipal office before starting.

Rather talk it over?

Call 1-855-478-4290 →

What Saratoga County itself does

  • Department of Public Works (3654 Galway Road, Ballston Spa; 518-885-2235; office 8 a.m. to 4:30 p.m.): permits for any work in a county right-of-way under Highway Law section 136, on separate forms for construction or reconstruction, utilities, driveways and special hauling. Working without one can cost up to $1,000 a day, and a driveway permit is approved only once every other agency involved has signed off.
  • Department of Health (6012 County Farm Road, Ballston Spa; 518-584-7460): reviews new and repaired septic plans for regulated facilities and realty subdivisions, by email or drop-off, one plan set only, and takes septic complaints.
  • Planning Department and Planning Board (50 West High Street, Ballston Spa): reviews referred actions within 500 feet of a municipal boundary, a state or county road or park, a county drainage channel, county or state public land, or a farm in an agricultural district; the board meets at 4 p.m. on the third Thursday of each month.

Saratoga County permit types and applications

Residential permits

Filing methods vary. Clifton Park takes applications only through Citizenserve, Saratoga Springs is moving to SmartGov in November 2026, Halfmoon wants three paper sets, and Malta takes checks or exact cash. In Ballston Spa the Building Department works downstairs at 66 Front Street with two part-time inspectors. On a lot that needs septic, most towns issue the septic permit with the building permit: Ballston, Moreau and Stillwater each run their own septic permits, and Moreau requires witnessed perc tests.

Commercial permits

Commercial projects add site plan review by the local planning board, a county referral where the site is within 500 feet of one of the listed features, and county Health review where the building is a regulated facility on its own septic system. Clifton Park charges commercial work $60 per 100 sq ft with a $400 minimum, and Halfmoon sets a $350 commercial minimum.

Rather not deal with the Saratoga County building department?

Get a free quote →

What comes before the building permit

  • County referral: the local board cannot finish acting on a referred site plan, special permit, variance or subdivision until the county Planning Board has reviewed it.
  • County road access: the DPW driveway or work permit for any county right-of-way.
  • Local zoning and wetlands: town and village ZBAs and planning boards; Clifton Park routes wetland questions to its Environmental Conservation Commission.
  • Flood zones: every Saratoga community listed by FEMA participates in the National Flood Insurance Program (Edinburg and the Village of Galway do not appear in its book); the Town of Corinth’s Building Department doubles as the town’s flood administrator.

Building permit fees in Saratoga County

Each municipality sets its own fees, and most towns here price a new house by floor area. The table gives the main house rule in the places with finished guides on this site.

New house permit fee rules in Saratoga County
MunicipalityNew house fee ruleSchedule
City of Saratoga Springs$225 plus $0.50 per sq ft2026 city fee schedule
Town of Clifton Park$40 per 100 sq ftTown Code 103-16 (Local Law 7 of 2025)
Town of Ballston$0.25 per sq ft, $100 minimum, certificate of occupancy includedResolution 26-14, Jan. 14, 2026
Town of Malta$0.45 per sq ft, $148 minimum2026 fee summary (Schedule A)
Town of Milton$100 plus $0.20 per sq ftResolution 22-2026, Jan. 28, 2026
Town of Moreau$0.23 per sq ft, $150 minimum2025 fee schedule
Town of Stillwater$100 plus $0.25 per sq ftFees printed on town forms
Town of Wilton$0.20 per sq ft, $50 minimumTown Code Chapter 63

For a 2,000 sq ft house: Ballston charges 2,000 times $0.25, or $500; Milton $100 plus $400, or $500; Malta 2,000 times $0.45, or $900; Clifton Park 20 times $40, or $800; Saratoga Springs $225 plus $1,000, or $1,225. Each town measures floor area by its own definition, so the totals are for comparison only. The county charges nothing for a building permit; its DPW permit forms carry their own terms.

Want this handled start to finish?

Get a free quote →

Trade permits and who may pull them

Saratoga County’s departments list no contractor or trade licensing program. The usual local rule is a third-party electrical inspection: Galway says electrical inspections are done by a third-party inspector, Moreau requires a New York-certified electrical agency, and Ballston and Wilton list approved agencies. Saratoga Springs requires a city master plumber certificate for plumbing in the city. Every office needs proof of workers’ compensation and disability coverage, or the state exemption form for an owner doing the work, before a permit issues.

How to get a building permit in Saratoga County

1. Find the municipality

Use the tax bill; Ballston Spa, Round Lake, South Glens Falls and the other villages have their own offices.

2. Check zoning and referral

Ask whether the planning board or ZBA must act and whether the county Planning Board must review first.

3. Plan septic and water

For a single house, apply for the local septic permit; for a subdivision or regulated facility, file plans with county Health.

4. Get road access

File the county DPW driveway or work permit for a county road, or the town’s for a town road.

5. File locally

Submit the application in the format the office takes, with plans, insurance proof and fee.

6. Inspect and close

Book inspections with notice and obtain the certificate of occupancy.

Review, corrections and what causes delay

Delays usually come from part-time hours, a pending county referral, septic designs and perc tests, and missing insurance forms. Malta quotes about two weeks and Wilton allows up to 28 business days for some reviews.

Inspections and certificates

Notice rules differ: Greenfield has required 48 hours’ notice for every inspection since May 30, 2023, Galway at least 24 hours with confirmation from the inspector, and Stillwater 48 hours since April 27, 2026. In Hadley it is the owner’s or contractor’s job to call the inspector for each required inspection. The final step is the certificate of occupancy or compliance from the local office.

New York building code

New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York

Saratoga County permit FAQ

Does Saratoga County issue building permits?

No. It runs no building department and has opted out of the enforcement of the Uniform and Energy codes; the two cities, 19 towns and nine villages issue all permits.

Who approves a septic system for a new house?

Usually the local building department. County Health reviews septic plans for realty subdivisions and regulated facilities and sends other residential systems to the local office.

Inspections are where schedules slip.

Get a free quote →

Do I need a county permit for a driveway?

Yes, if it enters a county road. Highway Law section 136 requires a county permit for any work in the county right-of-way, with fines of up to $1,000 a day for working without one.

Who issues permits in Ballston Spa?

The Village of Ballston Spa Building Department at 66 Front Street, whether the lot is in the Ballston or the Milton part of the village.

When does the county Planning Board review a project?

When the local action concerns land within 500 feet of a town or village line, a state or county road or park, a county drainage channel, county or state public land, or a farm in an agricultural district.

Do contractors need a county license?

Not from the county, whose departments list no licensing program; towns rely on approved third-party electrical agencies, and Saratoga Springs certifies master plumbers.

How much is a permit for a new house?

It depends on the town: for 2,000 sq ft, $500 in Ballston or Milton, $800 in Clifton Park, $900 in Malta and $1,225 in Saratoga Springs under their current schedules.

Saratoga County permit search and official resources

Permit and septic records for houses are held by the issuing city, town or village; request copies from its clerk under the Freedom of Information Law. County DPW and Health keep their own permits and plan approvals.

Simplify Saratoga County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Saratoga County sooner?

Let Alliance prepare, file, and track your Saratoga County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Saratoga County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.