The Town of Ramapo Building, Planning and Zoning Department reviews building permits, Planning Board applications and Zoning Board of Appeals applications. Town Hall is at 237 Route 59, Suffern, NY 10901; phone (845)-357-5100, with the Building Inspector at ext. 326.
This guide covers the Ramapo Building, Planning and Zoning Department, its fee schedule and the Town offices for zoning, planning, sewers and highways. The fee schedule posted on the Town site is dated February 5, 2018, so confirm current fees with the Building Department. The Town’s building permit application instructions are a scanned image and were not checked.
What requires a building permit in the Town of Ramapo?
Ramapo’s fee schedule prices new single- and two-family dwellings; residential alterations, additions, repairs and accessory structures; pools; solar panels; generators; re-roofing; decks and patios; fireplaces, stoves and chimneys; heating and air-conditioning equipment; and demolition.
A sewer permit is required before building a house sewer or connecting to, disconnecting from or repairing the Town sewer system. The hook-up permit for the Town’s sanitary sewer lines, and sewer licenses, go through the Town Clerk.
New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York
Short on time to read all of this?
Get a free quote →Who handles permitting in the Town of Ramapo?
| Office | Handles | Contact |
|---|---|---|
| Building, Planning and Zoning Department | Building permits, Planning Board and ZBA applications; Town Hall, 237 Route 59, Suffern | (845)-357-5100; Building Inspector ext. 326 |
| Zoning Board of Appeals | Variances, appeals of the Building Inspector, special permits, interpretations | (845) 357-5100 ext. 343 |
| Department of Public Works | Sewer permits | (845)-357-0591; townoframapodpw@ramapo.gov |
| Highway Department | 16 Pioneer Ave, Suffern, NY 10901; 7am - 3:30pm weekdays | 845-357-0903 |
Zoning and planning boards in the Town of Ramapo
Zoning Board of Appeals
The six-member Zoning Board of Appeals meets once a month and considers variances from the zoning ordinance, appeals of the Building Inspector, special permit applications and requests for zoning interpretations.
Planning Board
The seven-member Planning Board meets twice a month and reviews and approves site plans and subdivisions. As of June 2024, its meetings begin at 7:30pm, in person only, unless stated otherwise.
Town of Ramapo permit costs and fees
The Building Permit Fee Schedule on the Town site is dated February 5, 2018; confirm current amounts with the Building Department. It lists a non-refundable $50.00 application processing fee and:
Not sure this scope needs a permit?
Get a free quote →| Item | Fee |
|---|---|
| New single- and two-family dwellings, first 3,000 sq. ft. | $1.25/sf |
| New dwellings, 3,001 to 5,000 sq. ft. | $1.00/sf |
| New dwellings, over 5,000 sq. ft. | $0.50/sf |
| Residential alterations, additions, repairs, accessory structures, up to 2,000 s.f. | $0.75/sf |
| The same, over the first 2,000 s.f. | $0.50/sf |
| Above-ground pool | $200 |
| In-ground pool | $500 |
| Solar panels, residential | $200 |
| Generator, residential | $200 |
| Re-roof, residential | $250 |
| Decks/patios up to 225 s.f. | $200 |
| Decks/patios over 225 s.f. | $350 |
| Fireplaces, stoves or chimneys | $250 |
| Heating or air-conditioning equipment, per dwelling unit | $150 |
| Demolition up to 2,000 sq. ft. | $250 |
| Demolition over 2,000 sq. ft. | $500 |
| Each inspection beyond two for a required inspection | $100 |
Dwelling areas are gross floor areas, including basement, porches under cover and garage areas.
Plumbing and electrical work in the Town of Ramapo
Ramapo’s Plumber’s Information Form requires the licensed plumber to call for all inspections and to file a copy of the license with proof of workers’ compensation and liability insurance. For gas piping, O & R integrity test results must be submitted. Anyone misrepresenting themselves as a licensed plumber in the Town is subject to a $5,000 fine and/or 15 days in jail. Electrical inspections are performed by a third-party agency approved by the Town.
Rather talk it over?
Call 1-855-478-4290 →Where a municipality issues separate trade permits, the work is done under whatever electrical or plumbing licence that city, town or county requires; many places license neither trade. Trade licences in New York
How to get a building permit in the Town of Ramapo
For a one- or two-family home, a stamped plot plan must be approved by the Building Department before the building permit can be issued.
Variances go to the Zoning Board of Appeals; site plans and subdivisions to the Planning Board.
Pay the non-refundable $50.00 application processing fee and the permit fee.
Get the sewer permit, and the Town Clerk’s hook-up permit, before any sewer connection work.
Building permits are valid for 2 years. Up to two 6-month extensions are available, each for 25% of the original fee, if construction is approximately 50% complete.
Rather not deal with the building department?
Get a free quote →Every permit carries an expiration date set by the Town of Ramapo, which may void a permit if work does not start in time; confirm the expiry on phased or delayed work. Permit validity in New York
Inspections in the Town of Ramapo
All inspections must be requested in advance by the permit holder or authorized agent. For one- and two-family homes, a licensed surveyor must submit a certified foundation location plan before the framing inspection, and a certified as-built plot plan is needed before the certificate of occupancy. The certificate of occupancy is issued only after all required inspections and documents, including the as-built survey and final health department approvals, are received and approved.
Official Town of Ramapo permitting resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Want this handled start to finish?
Get a free quote →- Town of Ramapo Building Inspector
- Ramapo Building Permit Fee Schedule (February 5, 2018)
- Ramapo required inspections for one- and two-family dwellings
- Ramapo Plumber’s Information Form
- Ramapo Zoning Board of Appeals
- Ramapo Planning Board
- Ramapo Department of Public Works
- Ramapo Highway Department
Frequently asked questions
Are Ramapo’s posted permit fees current?
The fee schedule on the Town site is dated February 5, 2018. Confirm the current amounts with the Building Department before you budget.
How long is a Ramapo building permit valid?
2 years from the date of issue, with up to two 6-month extensions, each for 25% of the original fee, if construction is approximately 50% complete.
Who calls for plumbing inspections in Ramapo?
The licensed plumber, who must also file a copy of the license and proof of workers’ compensation and liability insurance.
Inspections are where schedules slip.
Get a free quote →Simplify Town of Ramapo permitting with Alliance Permitting
- Confirm the Town office for the parcel and the zoning, highway or fire approvals that go with the permit
- Prepare the application, surveys and plans and file them through the Town’s portal or counter
- Schedule the Town’s inspections and follow the permit through to the certificate of occupancy
Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Town of Ramapo sooner?
Let Alliance prepare, file, and track your Town of Ramapo permits while your crew stays on the job.