Municipal GuideNew YorkTown of Ramapo · Rockland County

Town of Ramapo, New York Building Permit Guide

The Town of Ramapo Building, Planning and Zoning Department at Town Hall in Suffern reviews building permits; the fee schedule the Town posts online is dated February 5, 2018.

Authority: Building, Planning and Zoning DepartmentTown Hall: 237 Route 59, SuffernPhone: (845)-357-5100
Building Inspector
(845)-357-5100 ext. 326Town Hall, Suffern
Fee schedule
February 5, 2018Confirm current fees
Permit life
2 yearsUp to two 6-month extensions
Application fee
$50.00Non-refundable

The Town of Ramapo Building, Planning and Zoning Department reviews building permits, Planning Board applications and Zoning Board of Appeals applications. Town Hall is at 237 Route 59, Suffern, NY 10901; phone (845)-357-5100, with the Building Inspector at ext. 326.

This guide covers the Ramapo Building, Planning and Zoning Department, its fee schedule and the Town offices for zoning, planning, sewers and highways. The fee schedule posted on the Town site is dated February 5, 2018, so confirm current fees with the Building Department. The Town’s building permit application instructions are a scanned image and were not checked.

What requires a building permit in the Town of Ramapo?

Ramapo’s fee schedule prices new single- and two-family dwellings; residential alterations, additions, repairs and accessory structures; pools; solar panels; generators; re-roofing; decks and patios; fireplaces, stoves and chimneys; heating and air-conditioning equipment; and demolition.

A sewer permit is required before building a house sewer or connecting to, disconnecting from or repairing the Town sewer system. The hook-up permit for the Town’s sanitary sewer lines, and sewer licenses, go through the Town Clerk.

New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York

Short on time to read all of this?

Get a free quote →

Who handles permitting in the Town of Ramapo?

Town of Ramapo permit offices
OfficeHandlesContact
Building, Planning and Zoning DepartmentBuilding permits, Planning Board and ZBA applications; Town Hall, 237 Route 59, Suffern(845)-357-5100; Building Inspector ext. 326
Zoning Board of AppealsVariances, appeals of the Building Inspector, special permits, interpretations(845) 357-5100 ext. 343
Department of Public WorksSewer permits(845)-357-0591; townoframapodpw@ramapo.gov
Highway Department16 Pioneer Ave, Suffern, NY 10901; 7am - 3:30pm weekdays845-357-0903

Zoning and planning boards in the Town of Ramapo

Zoning Board of Appeals

The six-member Zoning Board of Appeals meets once a month and considers variances from the zoning ordinance, appeals of the Building Inspector, special permit applications and requests for zoning interpretations.

Planning Board

The seven-member Planning Board meets twice a month and reviews and approves site plans and subdivisions. As of June 2024, its meetings begin at 7:30pm, in person only, unless stated otherwise.

Town of Ramapo permit costs and fees

The Building Permit Fee Schedule on the Town site is dated February 5, 2018; confirm current amounts with the Building Department. It lists a non-refundable $50.00 application processing fee and:

Not sure this scope needs a permit?

Get a free quote →
Ramapo building permit fees (schedule of February 5, 2018)
ItemFee
New single- and two-family dwellings, first 3,000 sq. ft.$1.25/sf
New dwellings, 3,001 to 5,000 sq. ft.$1.00/sf
New dwellings, over 5,000 sq. ft.$0.50/sf
Residential alterations, additions, repairs, accessory structures, up to 2,000 s.f.$0.75/sf
The same, over the first 2,000 s.f.$0.50/sf
Above-ground pool$200
In-ground pool$500
Solar panels, residential$200
Generator, residential$200
Re-roof, residential$250
Decks/patios up to 225 s.f.$200
Decks/patios over 225 s.f.$350
Fireplaces, stoves or chimneys$250
Heating or air-conditioning equipment, per dwelling unit$150
Demolition up to 2,000 sq. ft.$250
Demolition over 2,000 sq. ft.$500
Each inspection beyond two for a required inspection$100

Dwelling areas are gross floor areas, including basement, porches under cover and garage areas.

Plumbing and electrical work in the Town of Ramapo

Ramapo’s Plumber’s Information Form requires the licensed plumber to call for all inspections and to file a copy of the license with proof of workers’ compensation and liability insurance. For gas piping, O & R integrity test results must be submitted. Anyone misrepresenting themselves as a licensed plumber in the Town is subject to a $5,000 fine and/or 15 days in jail. Electrical inspections are performed by a third-party agency approved by the Town.

Rather talk it over?

Call 1-855-478-4290 →

Where a municipality issues separate trade permits, the work is done under whatever electrical or plumbing licence that city, town or county requires; many places license neither trade. Trade licences in New York

How to get a building permit in the Town of Ramapo

1. Approved plot plan

For a one- or two-family home, a stamped plot plan must be approved by the Building Department before the building permit can be issued.

2. Board approvals

Variances go to the Zoning Board of Appeals; site plans and subdivisions to the Planning Board.

3. Apply and pay

Pay the non-refundable $50.00 application processing fee and the permit fee.

4. Sewer permit

Get the sewer permit, and the Town Clerk’s hook-up permit, before any sewer connection work.

5. Keep the permit live

Building permits are valid for 2 years. Up to two 6-month extensions are available, each for 25% of the original fee, if construction is approximately 50% complete.

Rather not deal with the building department?

Get a free quote →

Every permit carries an expiration date set by the Town of Ramapo, which may void a permit if work does not start in time; confirm the expiry on phased or delayed work. Permit validity in New York

Inspections in the Town of Ramapo

All inspections must be requested in advance by the permit holder or authorized agent. For one- and two-family homes, a licensed surveyor must submit a certified foundation location plan before the framing inspection, and a certified as-built plot plan is needed before the certificate of occupancy. The certificate of occupancy is issued only after all required inspections and documents, including the as-built survey and final health department approvals, are received and approved.

Official Town of Ramapo permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Want this handled start to finish?

Get a free quote →

Frequently asked questions

Are Ramapo’s posted permit fees current?

The fee schedule on the Town site is dated February 5, 2018. Confirm the current amounts with the Building Department before you budget.

How long is a Ramapo building permit valid?

2 years from the date of issue, with up to two 6-month extensions, each for 25% of the original fee, if construction is approximately 50% complete.

Who calls for plumbing inspections in Ramapo?

The licensed plumber, who must also file a copy of the license and proof of workers’ compensation and liability insurance.

Inspections are where schedules slip.

Get a free quote →

Simplify Town of Ramapo permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build
  • Confirm the Town office for the parcel and the zoning, highway or fire approvals that go with the permit
  • Prepare the application, surveys and plans and file them through the Town’s portal or counter
  • Schedule the Town’s inspections and follow the permit through to the certificate of occupancy

Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Town of Ramapo sooner?

Let Alliance prepare, file, and track your Town of Ramapo permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Town of Ramapo permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.