Essex County runs no building department. Each of its 18 towns appoints a code officer who issues building permits, and the Villages of Lake Placid and Saranac Lake are covered by their own offices; several small towns share one officer. Because all of the county’s towns lie inside the Adirondack Park, many projects also need a ruling from the Adirondack Park Agency (APA), and septic systems and private wells fall to the New York State Department of Health office in Saranac Lake.
What requires a building permit in Essex County?
The town or village decides, under the Uniform Code and its own local law. The local laws posted by Ticonderoga (Local Law 4 of 2026) and the Village of Lake Placid (chapter 114) both require a permit for building, enlarging, altering, moving or demolishing a structure and for installing a solid-fuel heater or chimney, and both exempt detached one-story sheds and playhouses of 144 sq ft or less at a house. Saranac Lake adds that electrical service upgrades, re-roofing, re-siding and window replacement need a permit in the village.
Town or village permit
- New houses, additions, garages and decks
- Pools, solar arrays and woodstoves
- Demolition and changes of use
- In North Elba and Lake Placid, a separate foundation permit before the construction permit
Approvals from others
- APA permit or letter of no jurisdiction for regional projects, wetlands and shoreline work
- Individual water and sewage systems: NYSDOH, Saranac Lake
- Driveways and digging in a county road: Essex County DPW
What the towns decide and what the state holds
The technical rules are the state’s 2025 Uniform Code and Energy Code; a town board chooses its zoning, its permit fees and how it staffs enforcement, and any local building standard stricter than the code needs state Code Council approval. Zoning varies widely: the APA’s March 2024 map of Park communities shows Crown Point, Lewis and St. Armand with no zoning, subdivision or site plan law, while Chesterfield, Newcomb, Westport and Willsboro run APA-approved local land use programs under which the town, not the Agency, acts on Class B regional projects.
Essex County building department: who handles permitting
The table covers every town and village the Census Bureau counts in Essex County, with code phones from the county’s 2026 directory and each town’s own page. Port Henry and Au Sable Forks are hamlets of Moriah and Jay, and the Essex County side of Keeseville is part of Chesterfield, so permits there come from those towns. No Essex County municipality has a finished guide on this site yet.
Short on time to read all of this?
Get a free quote →| Place | Who issues building permits | Phone and official page |
|---|---|---|
| Chesterfield (town; APA-approved land use program) | Town code officer | 518-975-6202; Town of Chesterfield code page |
| Crown Point (town) | Town code enforcement officer, also serving Essex, Minerva, Newcomb and Willsboro | 518-545-7433; Town of Crown Point code page |
| Elizabethtown (town) | Town code officer, in the Town Hall office Wednesdays 9 a.m.–noon | 518-637-5620; Town of Elizabethtown code page |
| Essex (town) | Separate codes officer and zoning officer | 518-963-4287 ext. 5; Town of Essex code page |
| Jay (town; includes Au Sable Forks) | Town code officer, shared with St. Armand | 518-647-2204 ext. 106; Town of Jay code page |
| Keene (town) | Town code officer, shared with Elizabethtown and Lewis | 518-576-4444; Town of Keene code page |
| Lewis (town) | Town codes officer, in the office Thursdays 9 a.m.–noon | 518-873-6777 ext. 6; Town of Lewis code page |
| Minerva (town) | Town codes officer | 518-545-7433; Town of Minerva code page |
| Moriah (town; includes the hamlet of Port Henry) | Building codes office, plus a property-maintenance officer | 518-546-3510; Town of Moriah code page |
| Newcomb (town; APA-approved land use program) | Town code officer | 518-582-3211 ext. 1004; Town of Newcomb code page |
| North Elba (town) | Building & Planning office, 2693 Main Street, Lake Placid; online filing only | 518-523-9518; North Elba Building & Planning |
| North Hudson (town) | Town code officer, shared with Schroon | 518-532-7666; Town of North Hudson |
| St. Armand (town) | Town code officer | 518-891-3189; Town of St. Armand code page |
| Schroon (town) | Buildings & Codes office | 518-532-7737 ext. 15; Town of Schroon code page |
| Ticonderoga (town) | Code Enforcement, Community Building, 132 Montcalm Street; 8 a.m.–4 p.m. | 518-585-9851; Ticonderoga Code Enforcement |
| Westport (town; APA-approved land use program) | Codes and zoning officer | 518-962-2037; Town of Westport code page |
| Willsboro (town; APA-approved land use program) | Codes officer, with a separate zoning officer | 518-963-8668; Town of Willsboro code page |
| Wilmington (town) | Town code enforcement officer | 518-390-8580; Town of Wilmington code page |
| Lake Placid (village, in North Elba) | Joint North Elba–Lake Placid Building & Planning office | 518-523-9518; Cloudpermit portal |
| Saranac Lake (village; 1,328 residents in North Elba and St. Armand, the rest in Franklin County) | Village Code Enforcement Office, 39 Main Street; Monday–Thursday 8 a.m.–noon | 518-891-4150 ext. 233; Saranac Lake Code Enforcement |
Not sure this scope needs a permit?
Get a free quote →What Essex County itself does
- Public Works: a right-of-way permit for any driveway, water line, sewer, cable or other work in a county road, under section 136 of the Highway Law. Engineering staff decide whether a new driveway needs a culvert; the owner pays for and installs a required culvert, and a driveway without one gets at least 6 inches of compacted Item 4 gravel. 8053 US Route 9, Elizabethtown; 518-873-3739.
- Planning: the county planning board reviews General Municipal Law 239-m referrals, but under an agreement signed by every municipality only zoning laws, special use permits, site plans and variances within 500 ft of a municipal boundary, agricultural district land, or county and state roads and facilities are referred.
- Health: the county Health Department, 132 Water Street, Elizabethtown (518-873-3500), is a partial-service department; it posts boil water orders, while the state district office handles environmental permits.
- Real Property Tax Services: parcel maps that show which town a lot is in.
Essex County permit types and applications
Residential permits
Filing methods differ by town. North Elba and Lake Placid take every building application online through Cloudpermit, with owner authorization, project narrative, truss information and 911 address sign forms uploaded there. Ticonderoga accepts building, sign and use permits through its iWorQ portal or on paper. Most other towns take paper applications from an officer who keeps short office hours, so call first.
Rather talk it over?
Call 1-855-478-4290 →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Businesses that sell goods or services are APA regional projects in every land use area except hamlets, and in North Elba and Lake Placid site plans and conditional uses go to the joint Review Board, which meets on the first and third Wednesdays at 5:30 p.m. Ticonderoga prices new non-residential buildings at $0.30 per sq ft and inspects businesses for fire safety.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- APA jurisdiction: send the Jurisdictional Inquiry Form with the deed, tax map number, project description and sketch; staff answer by letter. No clearing, grading, road building or utility work may start on a project that needs a permit until it is issued.
- Shoreline setbacks: new structures over 100 sq ft must sit 50 to 100 ft back from the mean high-water mark, depending on the land use area, and new septic leach fields at least 100 ft from any water body.
- Zoning and boards: town zoning permits, ZBA variances and planning or review board approvals, with county referral only in the cases listed above.
- Flood zones: new FEMA maps take effect on December 10, 2026, and Ticonderoga posts its Local Law 6 of 2026 on flood damage prevention; building in a mapped flood zone needs the town floodplain review.
Building permit fees in Essex County
There is no county building permit fee; each town sets its own. Ticonderoga, the county’s second-largest town, posts the schedule its board adopted on February 14, 2019, and its fees are non-refundable application fees.
| Work (Town of Ticonderoga only) | Fee |
|---|---|
| New one- or two-family dwelling | $0.20 per sq ft, $150 minimum |
| Addition with conditioned space | $0.20 per sq ft, $100 minimum |
| New multiple dwelling (3 or more units) | $0.25 per sq ft, $300 minimum |
| New non-residential building | $0.30 per sq ft, $200 minimum |
| Garage or storage building | $50 up to 250 sq ft; $100 minimum above 250 sq ft |
| Carport, deck or porch (unconditioned) | $50 |
| Re-roofing | $35 residential; $50 commercial up to 1,500 sq ft, then $5 per additional 100 sq ft |
| Swimming pool, above or in ground | $50 |
| Residential solar | $50 up to 12 kW; $100 over 12 kW |
| Sewage disposal system permit | $75 ($35 tank, $45 leach field, as printed) |
| Demolition | $50 partial residential; $100 whole house; $200 commercial |
| Re-inspection after a failed or missed inspection | $25 |
| Certificate of occupancy search | $25 |
Rather not deal with the Essex County building department?
Get a free quote →Worked example: a new 2,000 sq ft one-family house in Ticonderoga costs 2,000 × $0.20 = $400, above the $150 minimum. Other towns use different bases, so ask the code officer for the fee before writing a check. The county right-of-way permit and any APA permit are separate approvals.
Trade permits and who may pull them
Neither the county nor the town pages listed above describe a local electrician, plumber or contractor license. In North Elba and Lake Placid the Building Department itself issues electrical permits for new wiring, electric heat and service changes. In Saranac Lake the code officer inspects everything except electrical work, which goes to an approved third-party electrical inspector from the village’s list. Before a permit issues, the applicant shows workers’ compensation and disability coverage or the state exemption form.
How to get a building permit in Essex County
Use the county tax maps or the table above; hamlet names and post office names do not match town lines.
Send a Jurisdictional Inquiry Form for any new house, subdivision, commercial use or work near wetlands or shorelines.
Contact the NYSDOH Saranac Lake office for an individual well or septic system, and any town that issues its own septic permit.
For a driveway on a county road, apply to Public Works for a right-of-way permit.
Submit the application, plans and insurance proof online (North Elba, Lake Placid, Ticonderoga) or to the code officer.
Call for each inspection and obtain the certificate of occupancy or compliance.
Review, corrections and what causes delay
The APA decides minor projects, meaning single-family dwellings and two-lot subdivisions, within 45 days of a complete application and other projects within 90 days, so start that review before the town file. Part-time code officers who cover two or three towns are the next bottleneck, and North Elba’s two-phase process means the construction permit cannot be requested until the foundation phase is finished.
Inspections and certificates
Book inspections with the officer who issued the permit, and leave time for officers who are in the office only one morning a week, as in Elizabethtown and Lewis. Ticonderoga charges $25 for a re-inspection when a stage fails or an appointment is not cancelled. North Elba issues certificates of occupancy for new buildings and major renovations and certificates of compliance for equipment; Saranac Lake also inspects places of assembly, businesses and buildings with three or more apartments on a routine schedule. Any APA permit conditions must be met as well before the work is complete.
Want this handled start to finish?
Get a free quote →New York building code
New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York
FEMA’s status book lists every Essex County town and both villages as taking part in the National Flood Insurance Program, with new flood maps for the towns and Lake Placid taking effect on December 10, 2026.
Essex County permit FAQ
Does Essex County issue building permits?
No. The 18 towns and the Villages of Lake Placid and Saranac Lake issue them; the county issues right-of-way permits for work in county roads.
Do I need an APA permit as well as a town permit?
Often. New dwellings, subdivisions, commercial uses, wetland work and structures over 40 ft can need one; the APA’s reply to a Jurisdictional Inquiry Form settles it.
Who approves a septic system or well in Essex County?
The New York State Department of Health district office in Saranac Lake (518-891-1800) handles individual water and sewage systems; some towns, Ticonderoga among them, also charge their own sewage disposal permit fee.
Who handles permits in Lake Placid?
The joint North Elba–Lake Placid Building & Planning office at 2693 Main Street, which takes applications only through Cloudpermit.
Do I need a permit for a shed?
Not in Ticonderoga or Lake Placid for a one-story detached shed of 144 sq ft or less at a house, though zoning setbacks and APA shoreline rules still apply.
Do I need county approval for a new driveway?
Yes, on a county road: Public Works issues a right-of-way permit and decides whether a culvert is required.
How do I look up an old permit?
Ask the town that issued it; Ticonderoga has a record search request form and charges $25 for a certificate of occupancy search. County records are requested through the county’s FOIL page.
Essex County permit search and official resources
Permit files stay with the town or village that issued them. Use the town clerk or code office for copies, the county FOIL page for county records, and Real Property Tax Services to confirm the parcel.
Inspections are where schedules slip.
Get a free quote →- Essex County 2026 directory of town officials
- Essex County Health Department, Environmental Health
- NYSDOH district offices (Saranac Lake serves Essex County)
- Essex County Community Resources and Planning: 239-m referrals
- Essex County 239-m referral form (2024)
- Essex County Department of Public Works
- Essex County right-of-way permit form
- Essex County Real Property Tax Services
- Essex County FOIL requests
- Adirondack Park Agency permitting overview
- APA Jurisdictional Inquiry Form
- APA Citizen’s Guide to land use regulations
- APA map of local land use controls in the Park (March 2024)
- North Elba–Lake Placid Building & Planning
- Village of Saranac Lake Code Enforcement
- Town of Ticonderoga Code Enforcement
- Ticonderoga fee schedule (adopted Feb. 14, 2019)
- Ticonderoga Local Law 4 of 2026 (Uniform Code administration)
- FEMA Community Status Book, New York
- NYS code adoption and enforcement updates
Simplify Essex County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Essex County sooner?
Let Alliance prepare, file, and track your Essex County permits while your crew stays on the job.
More New York permitting guides
Erie County
Read guide →Dutchess County
Read guide →Franklin County
Read guide →Town of Evans Building Permit Guide
Read guide →Town of Fallsburg Building Permit Guide
Read guide →Town of Farmington Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Essex County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.