To get a building permit in Nodaway County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Nodaway County has no planning and zoning, so county land needs no county building permit; Maryville permits construction inside the city, and a data center moratorium runs to January 21, 2027.

Authority: Nodaway County Health Center (septic)Septic rules: 19 CSR 20-3.060Phone: 660-562-2755
County building permit
None (no planning and zoning)
Septic permits
Health Center, 660-562-2755
Maryville codes
2024 I-Codes, 2023 NEC
Data centers
Moratorium to Jan. 21, 2027

Nodaway County has no planning and zoning, so land outside the towns needs no county building or zoning permit; the County Commission’s 2026 minutes say so directly. Two county rules still apply there: a six-month moratorium on data centers, adopted July 21, 2026 and set to run to January 21, 2027 unless ended or extended, and septic permits from the Nodaway County Health Center (2416 South Main, Maryville; 660-562-2755). Inside Maryville, the City’s Code Enforcement Department issues building permits under the 2024 International Codes.

Nodaway County building department: who handles permitting

The County Commission (presiding commissioner and North and South District commissioners), the County Clerk, Recorder, Collector-Treasurer and Sheriff work from the Administration Center at 403 N. Market, Maryville (660-582-2251), open 8 a.m. to 4:30 p.m.; the courts are in the courthouse at 305 N. Main. The county has no planning and zoning, and in 2026 the Commissioners told residents that, for that reason, no county permit was needed for work such as soil and water sampling on private land. The Commission has since been discussing a volunteer advisory committee on county-wide planning and zoning; under state law, county planning or zoning would need voter approval.

Inside the towns, each town decides; of the 15, Maryville sets out its permit program on its own site. Populations are Census Bureau Vintage 2025 estimates.

Short on time to read all of this?

Get a free quote →
Who issues building permits in Nodaway County
PlaceWho permits building work
Maryville (10,092)City of Maryville Code Enforcement Department: plan review, permits and inspections under the 2024 International Building, Residential, Mechanical, Fuel Gas and Plumbing Codes and the 2023 NEC; inspections 660-562-8015
Burlington Junction (483)The published sources do not say; City Hall 660-725-4514
Hopkins (437)The published sources do not say; ask City Hall
Ravenwood (409)The published sources do not say; ask the town
Skidmore (226)The published sources do not say; City Hall 660-224-0882
Barnard (185)The published sources do not say; ask City Hall
Conception Junction (166)The published sources do not say; ask the town
Clearmont (147)The published sources do not say; ask City Hall
Pickering (140)The published sources do not say; ask City Hall
Graham (138)The published sources do not say; ask the town
Parnell (129)The published sources do not say; ask City Hall
Elmo (105)The published sources do not say; ask City Hall
Guilford (57), Arkoe (52), Clyde (52)The published sources do not say; ask the town or village
Unincorporated Nodaway CountyNo county planning and zoning or building permit; septic permits from the Nodaway County Health Center; data center moratorium to January 21, 2027

Not sure this scope needs a permit?

Get a free quote →

What still needs approval on county land

Approvals that apply

  • A Health Center permit to build, or make a major modification or repair to, an on-site sewage system for a single-family home
  • The same permit for any facility producing less than 3,000 gallons of wastewater a day
  • Floodplain review for work in a mapped flood zone: contact the county floodplain administrator

No county office for

  • Building permits
  • Zoning or land-use permits
  • Building inspections or occupancy certificates

Data center moratorium: on July 21, 2026 the County Commission adopted an Order and Ordinance stopping the construction, conversion, start of operations or expansion of any data center in unincorporated Nodaway County, including the issue of any related permits, for six months from adoption, which runs to January 21, 2027. The Commission can end it sooner or extend it once by up to six more months by a further order. A data center here means a facility mainly for data processing or storage of 2,500 sq ft or more, or with 250 kW or more of IT power, plus its supporting substations, generators, cooling and water facilities; projects that had physically started construction before July 21, 2026 are exempt, and site grading alone does not count as a start.

Rather talk it over?

Call 1-855-478-4290 →

Septic permits from the Nodaway County Health Center

The Health Center, at 2416 South Main in Maryville, is the agency the Missouri Department of Health and Senior Services lists, under contract, for on-site wastewater permits in Nodaway County; the state notes that inside an incorporated town a local permitting authority may refer the permit back to DHSS. It permits new systems and major modifications or repairs for single-family homes and for facilities generating less than 3,000 gallons of wastewater a day, applying the state’s minimum construction standards for on-site sewage disposal systems (19 CSR 20-3.060). Call 660-562-2755 for the application and fee before the system is designed. The Health Center also inspects food service, lodging and child care facilities, which matters if a new building will house one of those businesses.

Floodplain in Nodaway County

FEMA’s Community Status Book lists Nodaway County as participating in the National Flood Insurance Program, together with Barnard, Burlington Junction, Hopkins, Maryville and Pickering. Arkoe, Clyde, Conception Junction, Elmo, Parnell and Skidmore are in its list of communities not participating, and Clearmont, Graham, Guilford and Ravenwood are not listed. SEMA’s directory gives the county floodplain administrator’s address as 403 N. Market, Maryville (660-582-5541), and the Commission’s 2024 minutes show it signing a floodplain development permit for a county bridge project.

Steps for building in Nodaway County

1. Check the town limits

Inside Maryville, apply to the Code Enforcement Department; in another town, ask City Hall; on county land there is no county building permit office.

2. Check the flood map

If the site is in a mapped flood zone, contact the county floodplain administrator at 403 N. Market before work starts.

3. Plan the sewage system

Without a public sewer, get the Health Center permit before installing or repairing a septic system.

4. Build and close out

Install the septic system under the Health Center permit; in Maryville, schedule each building inspection with Code Enforcement at 660-562-8015.

Rather not deal with the Nodaway County building department?

Get a free quote →

Missouri building code

Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri

Nodaway County permit FAQs

Does Nodaway County issue building permits?

No. The county has no planning and zoning, so land outside the towns needs no county building or zoning permit. Data centers are on hold there under a moratorium running to January 21, 2027, and septic systems still need a Health Center permit. The County Commission is at 660-582-2251.

Is there a moratorium on data centers in Nodaway County?

Yes. The County Commission’s Order and Ordinance of July 21, 2026 stops new or expanded data centers in unincorporated Nodaway County for six months, to January 21, 2027, unless the Commission ends it sooner or extends it.

Who issues building permits in Maryville?

The City of Maryville’s Code Enforcement Department, which reviews plans under the 2024 International Codes and the 2023 National Electrical Code and schedules inspections at 660-562-8015.

Do I need a septic permit in rural Nodaway County?

Yes, to build or make a major modification or repair to a home’s on-site system. The Nodaway County Health Center issues it (660-562-2755).

Want this handled start to finish?

Get a free quote →

Who handles floodplain permits in Nodaway County?

The county floodplain administrator, listed by SEMA at 403 N. Market, Maryville; the county takes part in the National Flood Insurance Program.

Nodaway County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Simplify Nodaway County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Nodaway County sooner?

Let Alliance prepare, file, and track your Nodaway County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Nodaway County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.