Skip to main content
Municipal GuideMissouriNodaway County · Maryville

Maryville, Missouri Building Permit Guide

To get a building permit in Maryville, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Maryville’s Code Enforcement Department, part of Public Works at City Hall, reviews plans and issues building, electrical, plumbing and mechanical permits for work inside the city.

Authority: Code Enforcement, City of MaryvilleCode: 2024 I-Codes, 2023 NECPhone: 660-562-8015
Authority
Code EnforcementCity Hall, 415 N. Market St.
Codes
2024 I-CodesAdopted Dec. 22, 2025
New building fee
$0.05 per sq ftPlus trade fees, $15 minimum
Licences
$175 a yearContractors and trades

Inside Maryville city limits, building, electrical, plumbing and mechanical permits come from the Code Enforcement Department of Public Works at City Hall, 415 N. Market Street, which plan-reviews every building permit. The City adopted the 2024 International Codes and the 2023 National Electrical Code on December 22, 2025, and a new building or addition costs $0.05 per square foot under Section 500.090 of the City Code, with separate trade fees.

What needs a permit in Maryville?

Code Enforcement lists the most common projects that need permits and asks owners to call before starting anything not on the list. A permit is required whenever a structural change is made to a building.

Permit needed

  • New buildings, additions, alterations, renovations and demolition
  • Electrical, plumbing and HVAC work, and water heaters
  • Garages and accessory buildings larger than 120 sq ft
  • Decks, roofing, siding and structural masonry
  • Digging or trenching over 3,000 sq ft
  • Sidewalks, driveways and concrete work in the public right-of-way
  • Swimming pools, signs and new or replacement fences

No permit

  • Replacement doors and windows with no structural change
  • Replacing a few basement blocks (rebuilding a whole wall needs a permit)
  • Maintenance of an existing fence or deck
  • A deck under 30 inches high including its rail (the code also requires that it not sit over a basement)
  • Sheds and playhouses of up to 120 sq ft
  • Electrical, plumbing, mechanical or building repairs under $150 in labor and materials, once per address in any 30 days

Maryville building department: who handles permitting

Code Enforcement, a division of the Public Works Department headed by Director Matt Smith, enforces the building, plumbing, mechanical and electrical codes and the zoning ordinance: it reviews building plans, issues permits, carries out progress inspections and investigates complaints. James Wiederholt is the Code Enforcement Officer. Contractor and trade licences are issued by the City Clerk, and the Public Works Director is the floodplain administrator.

Short on time to read all of this?

Get a free quote →
Maryville permit contacts
DetailInformation
OfficeCode Enforcement Department, Public Works
AddressCity Hall, 415 N. Market Street (mail: P.O. Box 438), Maryville, MO 64468
Inspections660-562-8015
Code Enforcement Officer660-562-8027
Public Works office660-562-8012 (fax 660-562-8016)

Maryville permit applications

The Code Enforcement page carries the City’s building, demolition, fence, sign and swimming pool permit forms, the contractor licence application and licensing exam form, and the rezoning, special use, zoning variance, lot-split and sidewalk program applications. A building permit application needs:

  • A site plan showing existing and new structures with dimensions, setbacks from property lines, finished contours and drainage, easements, utility locations and lot dimensions
  • Design drawings: plans of every floor, footing and foundation drawings, elevations, wall sections, structural drawings, and plumbing, electrical and HVAC drawings for every floor
  • The cost of construction, a list of contractors and the legal description

A structural plan review is carried out on every building permit against the City’s adopted codes and ordinances, and Code Enforcement either approves the plans or tells the applicant what must change. Before new construction starts, the permit holder must set up a weatherproof box next to the street, marked with the address, where inspectors leave the inspection record cards until the final approval.

Maryville permit fees

Permit fees are set in Section 500.090 of the City Code, last amended in 2004, which the Code Enforcement page links as its fee schedule.

Not sure this scope needs a permit?

Get a free quote →
Maryville permit fees (City Code Sec. 500.090)
ItemFee
New construction or addition, all areas incl. garage and unfinished basement$0.05 per sq ft ($15 minimum)
Alterations / siding$15 / $15
Repair or reshingling$0.75 per 100 sq ft
Swimming pool$1 per 1,000 gallons, $20 minimum
Electrical, new home or addition (unfinished basement included)$0.03 per sq ft, $15 minimum
Electrical, new commercial building or addition$0.01 per sq ft
Electrical service disconnect / additions / temporary service$25 / $15 / $15
Furnace / A/C or heat pump$20 / $15
Plumbing fixture or water heater$5 each
Sewer tap inspection / water meter inspection / dig permit$20 / $20 / $25
Demolition$0.01 per sq ft for the first floor, $0.015 for each added floor, $25 minimum
Fence / sidewalk / residential driveway$10 / $15 / $15
Work done without a permit$50 investigation fee added

For example, a new 2,000 sq ft house with no garage (unfinished basement included) pays a $100 building permit fee and a $60 electrical permit fee, plus the plumbing and mechanical items it contains.

Water and sewer connections are charged separately: a 3/4-inch water tap costs $400 plus the meter ($2,000 plus the meter in the area the City acquired from Public Water Supply District No. 1), and the residential sewer tap fee is $600 per unit. Disconnecting water and sewer service needs deposits of $400 and $300.

Contractor and trade licences

Electricians, plumbers and mechanical installers need a City licence, and so does anyone doing building, roofing, siding or concrete work or land disturbance over 3,000 sq ft. Licences are issued by the City Clerk, expire on December 31 and are renewed in January.

Maryville licence fees (Sec. 500.040)
LicenceFee
Electrical, plumbing, mechanical or contractor licence$175 a year
Electrical, plumbing or mechanical exam$50

Rather talk it over?

Call 1-855-478-4290 →

The City Code requires a score of at least 70% on the City’s written exam before an electrical, plumbing or mechanical licence is issued; the Code Enforcement page adds that the division may accept certain credentials in place of the local test, such as a passed Block and Associates exam, union journeyman status or a diploma from a certified institute, while a licence from another city does not count on its own. Contractors must carry at least $300,000 of general liability insurance. When the City adopts new codes, licensed contractors must attend the City’s seminar for their trade or retest.

An owner-occupant of a single-family home may do their own building, electrical, plumbing and mechanical work without a licence if they buy the materials and permits, do all the labor, call for inspections and live in the home for a year; no more than one such permit is issued in five years unless the owner has lived there a year after the certificate of occupancy.

How to get a Maryville building permit

1. Check zoning

Confirm setbacks and use; rezonings, special uses and variances have their own applications.

2. License the contractors

Each contractor and tradesperson needs a current City licence from the City Clerk.

3. Prepare the plans

Assemble the site plan, floor, foundation and structural drawings and trade drawings.

4. Apply at City Hall

File the building permit application with Code Enforcement, with the cost, contractor list and legal description.

5. Plan review

Code Enforcement reviews the plans and approves them or asks for changes; then work can begin.

6. Schedule inspections

Put up the inspection card box and call 660-562-8015 for each inspection through the finals.

Maryville inspections

The contractor is responsible for scheduling each inspection with Code Enforcement by calling City Hall at 660-562-8015. The typical sequence is:

Rather not deal with the building department?

Get a free quote →

During construction

  • Footing
  • Underground plumbing
  • Sewer tap and water tap
  • Temporary electric
  • Rough-in electric, building, full-service electric
  • Rough-in drain, waste and vent, potable water, HVAC and gas plumbing

Finals

  • Final electric
  • Final plumbing
  • Final mechanical (HVAC)
  • Final building
  • Driveway and sidewalk

Local Maryville rules

Codes: on December 22, 2025 the City Council adopted the 2024 International Building, Residential, Mechanical, Fuel Gas, Plumbing, Fire, Property Maintenance and Existing Building Codes and the 2023 National Electrical Code. The residential code amendments delete the energy efficiency chapter and the automatic sprinkler section and adopt the appendices on accessory dwelling units and tiny houses; the design criteria use a 31 psf ground snow load and a 36-inch frost depth.

Floodplain: Maryville takes part in the National Flood Insurance Program, using the Nodaway County flood maps dated January 22, 2020 (the residential code’s design table lists January 23, 2020). Development in a mapped flood area needs a floodplain development permit from the Public Works Director, and new or substantially improved homes must have the lowest floor, including any basement, 1 ft above the base flood elevation.

Water service: a new Chapter 720, adopted March 23, 2026, requires buildings on property within 100 ft of a public water main to connect within 60 days of official notice, and a privately owned public water system needs a $2,500 permit.

Short-term rentals: a short-term rental needs a City permit, applied for through the Public Works administrative assistant for a $125 fee and renewed every year. Guests are limited to two per bedroom and ten in all, the operator must answer complaints within 30 minutes, and the City may inspect the unit under the fire and building codes; Council agendas in 2025 and 2026 include public hearings on individual applications.

Downtown wiring: electrical work in buildings other than single-family homes in the Downtown Overlay District, roughly between Seventh, Vine, Jenkins and Fillmore streets, must meet the extra wiring rules of Section 525.020.

Want this handled start to finish?

Get a free quote →

Missouri building code

Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri

Maryville building permit FAQ

Who issues building permits in Maryville?

The Code Enforcement Department of Public Works at City Hall, 415 N. Market Street; inspections are booked at 660-562-8015.

How much is a building permit in Maryville?

$0.05 per square foot for new construction or additions (garage and unfinished basement included), with a $15 minimum, plus electrical, plumbing and mechanical fees.

Which codes does Maryville use?

The 2024 International Building, Residential, Mechanical, Fuel Gas, Plumbing, Fire, Property Maintenance and Existing Building Codes and the 2023 National Electrical Code, adopted December 22, 2025.

Do I need a permit for a shed, deck or fence?

Accessory buildings larger than 120 sq ft need a permit, as do new or replacement fences and most decks; the City’s FAQ exempts only decks under 30 inches high including the railing.

Can a homeowner do their own work?

Yes, on a single-family home they occupy and will live in for a year, if they buy the permits and materials, do all the work and call for inspections.

Do contractors need a Maryville licence?

Yes. Building, roofing, siding, concrete and large land-disturbing work and all electrical, plumbing and mechanical work need a City licence at $175 a year.

Inspections are where schedules slip.

Get a free quote →

Maryville permit search and official resources

Simplify Maryville permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Maryville sooner?

Let Alliance prepare, file, and track your Maryville permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Maryville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.