Mississippi County, Missouri Building Permit Guide

To get a building permit in Mississippi County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Mississippi County, Missouri requires a floodplain development permit from the County Clerk before any development outside city limits; building permits come from the cities.

Rural permits: Mississippi County ClerkSeptic: State onsite wastewater programPhone: 573-683-2959
Unincorporated land
Development permit, County Clerk
Rural 911 address
County Clerk
Septic
State health department (DHSS)
City permits
Charleston, East Prairie and other towns

Mississippi County publishes no building code of its own for land outside the cities, but it does make the County Clerk its floodplain administrator: a development permit from the Clerk’s office (573-683-2959) is required before any development of unincorporated land, and the same office issues rural 911 addresses. Building permits inside Charleston, East Prairie and the smaller towns come from each city, and septic systems are permitted through the state health department.

Mississippi County building department: who handles permitting

The courthouse is at 200 N. Main St., Charleston, open weekdays 8:00 a.m. to 4:30 p.m. The County Commission meets there every Thursday at 9:00 a.m.; to get on its agenda, call the County Clerk. The county sits at the meeting of the Ohio and Mississippi Rivers behind Corps of Engineers levees, and its Highway Department maintains 342 miles of county roads and 52 bridges and works with the drainage districts.

The county Assessor reviews the new-construction permits filed with Bertrand, Charleston, East Prairie, Wilson City and Wyatt each month (its page still lists Anniston too), so a city permit also feeds the county’s property records.

Short on time to read all of this?

Get a free quote →
Who permits building work in Mississippi County’s towns (2025 Census estimates)
PlaceWho permits building work
Charleston (4,731)City of Charleston; applications go to the City Engineer with two sets of plans. 2012 International Building, Residential, Plumbing, Mechanical, Fuel Gas and Property Maintenance Codes and the 2011 National Electrical Code (Ord. 2831, 2014). City Hall, 204 N. Main St., 573-683-3325
East Prairie (2,841)City Code Enforcement / Building Inspection office at City Hall, 127 E. Main St., 573-649-3057. 2018 International Codes and the 2017 National Electrical Code (Ord. 1747, 2020)
Bertrand (698), Wyatt (212), Wilson City (75)The county Assessor’s page refers to construction permits filed with each of these cities; none of the three posts a code or permit form online. City floodplain contacts listed by SEMA: Bertrand 573-683-3051, Wyatt 573-675-3314, Wilson City 573-675-3305
Anniston (179)Voters chose to dissolve the city on April 2, 2024, and the County Commission appointed a trustee on June 4, 2024; the city now exists only to wind up its affairs (Missouri DNR order PDWB-2026-234). The Census, FEMA and the county Assessor still list it. County rules for unincorporated land then apply: ask the County Clerk (573-683-2959) about development permits and addresses
Miner (no residents in this county)Scott County city; its building inspector permits all city land

City permit fees in Charleston and East Prairie

The county publishes no building permit fee. The two largest cities set theirs by construction cost in their city codes:

Not sure this scope needs a permit?

Get a free quote →
Building permit fees in the city codes (eCode360)
City and workFee
East Prairie: residential building$1.50 per $1,000 of estimated cost or fraction of $1,000; $15 minimum
East Prairie: commercial building$2.25 per $1,000 of estimated cost or fraction of $1,000; $15 minimum
Charleston: any building permit$25 minimum, covering projects of $1,000 or less; plus $2 per $1,000 of cost, labor and materials included
Charleston: work started without a permitAdded administrative fee of $30 up to $10,000 of cost, $40 for $10,000 to $25,000, $50 over $25,000

In East Prairie a house estimated at $200,000 costs $300 (200 × $1.50). East Prairie issues a certificate of occupancy only after the final inspection, and the city will not connect utilities without it. Charleston needs no permit for ordinary repairs and minor alterations that change no major structural part, or cost $500 or less, nor for a detached shed or one-car garage outside the fire limits costing $200 or less, nor for minor wiring repairs; its permits lapse if work has not started within 6 months or is not finished within 24 months.

Floodplain, 911 address and septic rules on county land

Floodplain development permit: the County Clerk runs the county’s floodplain program, and a development permit is required before any development of unincorporated land. Mississippi County joined the National Flood Insurance Program with flood maps dated January 18, 1989, and Bertrand, Charleston, East Prairie, Wilson City and Wyatt participate; FEMA still lists Anniston as well. Charleston’s city manager reported in November 2025 that FEMA’s preliminary maps would add parts of Charleston to the flood zone. Inside Charleston, new or substantially improved homes in mapped flood zones must have the lowest floor 1 foot above base flood elevation.

Rather talk it over?

Call 1-855-478-4290 →

Rural 911 addresses: the County Clerk’s office issues them, and a floodplain permit or exemption is needed along with the address.

Septic systems: the state health department’s directory lists its own Onsite Wastewater Treatment program (573-751-6095 ext. 5) as the permitting authority for Mississippi County. The Mississippi County Health Department in Charleston (573-683-2191, ask for Environmental) still describes the steps on its site: an application, a soil morphology evaluation or percolation test, and a design reviewed before the permit. The state suspended its septic application fee on August 28, 2026, until it sets new fees; the county page still lists the old $90 fee.

Starting a project in Mississippi County

1. Find the jurisdiction

A Charleston or East Prairie mailing address can cover county land; check whether the lot is inside city limits.

2. Inside a city

Apply at that city hall: Charleston’s City Engineer, East Prairie’s Code Enforcement Officer, or the smaller town’s clerk.

3. Outside the cities

Get a development permit or exemption and a 911 address from the County Clerk before building or placing a home.

4. Septic

Request an application number from the state onsite program before installing or repairing a system.

Rather not deal with the Mississippi County building department?

Get a free quote →

Missouri building code

Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri

Mississippi County permit FAQs

Do I need a county permit to build outside city limits in Mississippi County, Missouri?

Yes. The County Clerk requires a development permit before any development of unincorporated land; the county publishes no separate building permit or building code.

Who issues 911 addresses in rural Mississippi County?

The County Clerk’s office at the courthouse in Charleston (573-683-2959), which also requires a floodplain permit or exemption.

How much is a building permit in East Prairie?

$1.50 per $1,000 of estimated cost for residential work and $2.25 per $1,000 for commercial work, with a $15 minimum.

Which building code does Charleston use?

The 2012 International Building and Residential Codes and related 2012 codes, with the 2011 National Electrical Code.

Who issues septic permits in Mississippi County?

The state health department’s onsite wastewater program, which suspended its application fee from August 28, 2026.

Want this handled start to finish?

Get a free quote →

Mississippi County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Simplify Mississippi County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Mississippi County sooner?

Let Alliance prepare, file, and track your Mississippi County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Mississippi County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.