Skip to main content

Bates County, Missouri Building Permit Guide

To get a building permit in Bates County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Bates County has no county building or zoning office: Butler, Adrian and Rich Hill permit construction in town, while the Bates County Health Center issues septic permits under a county ordinance.

Authority: Bates County CommissionSeptic: Bates County Health CenterPhone: 660-386-7776
Septic permits
Health Center, 660-679-6108
Butler permits
2024 codes, City Hall 660-679-4182
Township roads
Maintained by each township
County floodplain contact
(660) 679-4031

The Bates County Commission runs no building, planning or zoning office, so the county issues no building permits; the county seat, Butler, enforces the 2024 International Codes and Adrian the 2018 International Residential Code inside their limits. On rural land the main county rule is the wastewater ordinance: the Bates County Health Center in Butler (660-679-6108) issues septic permits, though a single-family home on more than 3 acres is exempt.

Bates County building department: who handles permitting

Bates County still has a township form of government. The Commission, which meets Mondays and Wednesdays from 9 a.m. to 4:30 p.m. (appointments through the County Clerk, 660-386-7776 option 1, 103 W. Dakota St., Butler), manages county property and the culverts and bridges that cross county roads, while each township grades, gravels and maintains its own roads. None of the county offices reviews plans or inspects private construction. Town populations below are Census Bureau Vintage 2025 estimates for the part in Bates County.

Short on time to read all of this?

Get a free quote →
Who issues building permits in Bates County
PlaceWho permits building work
Butler (4,317)City Hall, 22 W. Ohio; (660) 679-4182. 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, Existing Building, Electrical, Property Maintenance and Fire Codes, adopted June 3, 2025
Adrian (1,798)City Hall, 16 E. 5th St.; 816-297-2659, or the City’s online building permit portal. 2018 International Residential Code, adopted October 14, 2025 (Ordinance 1214)
Rich Hill (1,264)The City’s zoning ordinance (Ordinance 1799, September 22, 2025) ties its building permits to zoning and plat approvals; City office, 120 N. 7th St.; (417) 395-2223
Hume (290)The published sources do not show a building permit; the City’s posted ordinances cover replacing mobile, manufactured and modular homes and dangerous buildings
Amsterdam (225), Rockville (141), Amoret (134)The published sources do not say; ask the city
Drexel (140; 842 in Cass County)The published sources do not say; ask the city office at 137 E. Main St.
Foster (80), Merwin (70), Passaic (29)The published sources do not say; ask the village or town
Unincorporated Bates CountyNo county building permit or zoning; septic permit from the Bates County Health Center

Septic systems, roads and flood rules

Septic systems: the county’s Wastewater Treatment Systems Ordinance, enacted under section 192.300 RSMo and last revised in August 1996, states that it covers every wastewater system in the county except those connected to a system run by a city or a public sewer district. Under that ordinance and the Health Center’s posted on-site sewage rules, a permit from the Bates County Health Center, 501 N. Orange, Butler (660-679-6108, weekdays 8:30 a.m. to 4:30 p.m.), is needed before a new system or a major modification or repair for a single-family home on less than 3 acres and for businesses, schools, churches, rentals and anyone else; it costs $75 for a single-family home and $125 for a commercial facility. A single-family home on more than 3 acres needs no permit but must still meet county standards, and a second system on such a tract needs one unless that land is deeded in the owner’s name and is also over 3 acres. Repairing a crushed lateral or pumping a tank needs no permit, and the Health Center’s environmental public health specialist inspects a permitted system before it is covered. The county rules cover systems of up to 3,000 gallons a day; larger systems, lagoons that are not for single-family homes and any subdivision go to the Missouri Department of Natural Resources first.

Not sure this scope needs a permit?

Get a free quote →

Roads: ask the township for gravel, grading and maintenance on a township road, and the Commission about culverts and bridges crossing county roads or about opening and closing a road. The county posts a list of township officials for 2025 to 2027.

Flood rules: Bates County takes part in the National Flood Insurance Program, with flood maps dated May 3, 2010, and the state’s floodplain contact list gives the county floodplain administrator at 103 W. Dakota St., Butler, (660) 679-4031. Adrian, Butler, Drexel and Rich Hill also take part; Amoret, Amsterdam, Foster, Merwin and Rockville are in FEMA’s section of communities not in the program.

Building in Butler

Besides new construction, Butler requires permits for interior work that cuts structural members or changes required exits, and for plumbing and mechanical work. Carports count as buildings, and a second layer of shingles or a tear-off needs a $35 roofing permit. The City’s fee schedule of July 2, 2024 charges by project value:

Rather talk it over?

Call 1-855-478-4290 →
City of Butler permit fees (July 2024)
PermitFee
Construction up to $1,000,000 in value$50 for the first $2,000, plus $5 for each additional $1,000
Construction over $1,000,000$5,000 for the first million, plus $2 for each additional $1,000
Roofing$35
Fence 5 ft or higher$50
New driveway or culvert$50
Swimming pool$15
Demolition$0.01 per sq ft
Zoning, variance or conditional use application$150

For example, a $300,000 house costs $50 for the first $2,000 plus 298 × $5, or $1,540. Fees double if work starts before the permit is issued.

Steps for building in Bates County

1. Find out which town, if any, governs the lot

Butler, Adrian and Rich Hill permit construction; county land has no building permit.

2. Apply in town

In Butler, apply at City Hall before work starts to avoid a double fee; in Adrian, use City Hall or the online portal.

3. Get the septic permit

A single-family home on less than 3 acres, or any other kind of building, needs a Bates County Health Center permit ($75 for a home) before the system is installed.

4. Check for larger-system rules

Subdivisions, lagoons for other than a single home and systems over 3,000 gallons a day start with the state Department of Natural Resources.

5. Check the flood map

Call the county floodplain administrator about a lot in a mapped flood zone.

Rather not deal with the Bates County building department?

Get a free quote →

Missouri building code

Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri

Bates County permit FAQs

Does Bates County issue building permits?

No. The county has no building, planning or zoning office; Butler, Adrian and Rich Hill handle permits in town.

Who issues septic permits in Bates County?

The Bates County Health Center, 501 N. Orange, Butler (660-679-6108), under the county’s wastewater ordinance.

How much is a building permit in Butler?

$50 for the first $2,000 of value plus $5 for each additional $1,000, so a $300,000 house pays $1,540; a roofing permit is $35.

Which code does Adrian use?

The 2018 International Residential Code, adopted on October 14, 2025.

Who maintains rural roads in Bates County?

Each township maintains its own roads; the county crews look after culverts and bridges that cross county roads.

Want this handled start to finish?

Get a free quote →

Bates County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Simplify Bates County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Bates County sooner?

Let Alliance prepare, file, and track your Bates County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Bates County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.