In unincorporated Cherokee County, the county Zoning office at 5074 Highway 3, Cherokee (712-260-0913, Monday to Friday 7:00 am to 4:00 pm), issues the zoning building permit or a free certificate of zoning exemption before any building is built or moved. The permit checks land use and setbacks only: the county’s regulations state that the zoning administrator is not a building inspector. A house or other non-farm building costs $25 under the 2007 fee list, septic systems and wells go to Environmental Health, and electrical permits come from the state.
What requires a permit in unincorporated Cherokee County?
The Cherokee County Zoning Regulations, as amended July 1, 1993 and replacing the 1976 regulations, cover the unincorporated county. Before any building is constructed or relocated, the owner must obtain either a certificate of zoning compliance (the zoning building permit) or a certificate of zoning exemption, and no building may be erected, altered, moved, converted, extended or enlarged, except exempt farm buildings, without the compliance certificate.
Zoning permit needed
- Houses, including modular homes, and other non-farm buildings
- Additions
- Feedlots and confined feeding facilities
- Farm buildings in a floodplain
- Signs and billboards
- Wind energy devices, solar energy systems and battery storage, under their own ordinances
- Septic systems and private wells (Environmental Health)
- Entrances and work in the county road right of way (County Engineer)
Exemption certificate, no fee
- Farm houses, barns and other buildings primarily adapted for farm use, outside the floodplain
- Work inside any of the eight incorporated cities, which is not county business at all
The farm exemption is narrower here than many readers expect. The regulations say plainly that feed lots and confined feeding facilities are not exempt, and that farm buildings in a floodplain are not exempt either, with the flood zone set by government maps. Even an exempt farm building needs the certificate of zoning exemption, which the administrator issues or denies in writing within 15 days, free of charge.
What the county decides and what the state holds
Cherokee County regulates land use through its zoning regulations, a floodplain management ordinance (2004-4), well and onsite wastewater ordinances (2000-102 and 2000-101) and separate ordinances for solar, wind and battery storage; the ordinances it posts include no building code, and the regulations define the zoning administrator as “not a building inspector.” For animal confinements, the supervisors adopted a construction evaluation resolution in 2026 so the county can review every confinement construction permit application it receives between February 1, 2026 and January 31, 2027 with the state’s master matrix and send a recommendation to the Iowa DNR, which issues those permits.
Short on time to read all of this?
Get a free quote →Cherokee County building department: who handles permitting
Zoning is administered by a county zoning administrator with an assistant, Steve Zarr, together with the Zoning Commission and the Board of Adjustment, from the office at 5074 Highway 3, the same address as the County Engineer. Septic and well permits come from Environmental Health in Cherokee, run by Environmental Health Coordinator Justin Pritts, and the County Engineer, Kelly Puhrmann, handles entrances, right-of-way work and rural addresses.
| Office | Contact |
|---|---|
| Zoning | 5074 Highway 3, Cherokee, IA 51012; 712-260-0913; Monday to Friday, 7:00 am to 4:00 pm |
| Environmental Health (septic, wells) | 322 Lake Street, Cherokee; 712-225-6721; fax 712-225-6733; Monday to Friday, 8:00 am to 4:30 pm |
| County Engineer (entrances, right of way, rural addresses) | 5074 Highway 3, Cherokee; 712-225-6712; fax 712-225-6715; Monday to Friday, 7:00 am to 4:00 pm |
| Electrical permits | State of Iowa electrical program (DIAL), online |
The secondary road system the Engineer maintains runs to 1,005 miles: 218 paved, 758 gravel and 29 dirt, with 212 bridges and large culverts. The Engineer’s duties include entrance permit review and approval, rocking house and farm entrances within the right of way, and maintaining existing driveways and entrance extensions.
Cities in Cherokee County
Each incorporated city handles building permits inside its own limits; the county zoning regulations apply only outside them.
| City | Who handles building permits |
|---|---|
| Cherokee (5,122) | City of Cherokee, under its own rules |
| Marcus (1,038), Aurelia (935) | Each city under its own rules |
| Quimby (236), Cleghorn (225), Washta (199), Meriden (168), Larrabee (113) | Each city under its own rules |
Cherokee County permit types
The zoning office posts printable forms: the zoning building permit, a sign permit, a variance application, a conditional use application and an application to change a property’s zoning classification. The building permit must be filled out by the owner or the person leasing the property, and asks for the legal description, township and section, acreage, what is being built, its value, dimensions and height, its setbacks from the right of way and lot lines, whether the land is in a flood plain, and a sketch of the property with north at the top showing every building.
Residential permits
A rural house needs the zoning building permit, a septic permit unless sewer is available, a well permit for a private well, an entrance permit from the Engineer for a new driveway, a rural address from the Engineer and a state electrical permit. The Agricultural-Conservation district lists detached single-family dwellings, including modular homes, among its permitted uses. Applications for a compliance certificate go with a plot plan in duplicate showing lot lines and the location and size of buildings, and a boundary survey and staking by a surveyor may be required.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial and industrial projects use the same permit, and uses allowed only by exception go to the Board of Adjustment as conditional uses; sand and gravel pits in the agricultural district, for example, must be at least 300 feet from a residence and 100 feet from a property line and be levelled and filled within six months after extraction ends. A permit for a confinement or feedlot must list the owners of property within a quarter mile.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning changes and variances. Rezonings go to the Zoning Commission for a public hearing and then to the supervisors; a denied petition cannot be brought back for a year. Variances and appeals go to the Board of Adjustment.
- Floodplain. The permit form asks whether the land is in a flood plain, and development there falls under Flood Plain Management Ordinance 2004-4; even farm buildings in a floodplain need the county’s compliance certificate.
- Battery storage. Resolution 2026-10, adopted March 24, 2026, put an indefinite moratorium on applications for new battery storage projects until the county enacted a battery storage ordinance. That ordinance, 2026-01, was adopted August 25, 2026 after three readings and took effect October 23, 2026; ask the zoning office how new applications are being handled.
- Wind and solar. Wind energy devices are governed by Ordinance 2026-02 and solar energy systems by Ordinance 2025-01, both on the county’s ordinance list.
Cherokee County permit costs and fees
Zoning fees were approved by the Board of Supervisors on August 28, 2007, with wind energy fees added March 8, 2016. The fee is flat and does not depend on the value written on the permit.
| Item | Fee |
|---|---|
| Farm building | Exempt (certificate of zoning exemption, no fee) |
| Other buildings and additions | $25.00 |
| Rezone to residential | $175.00 |
| Rezone to commercial or industrial | $175.00 |
| Conditional use | $175.00 |
| Variance | $175.00 |
| Administrative appeal | $175.00 |
| Platting a subdivision | $50.00 plus $10.00 for each lot over 10 lots |
| Signs and billboards | $25.00 |
| Wind energy: wind farm permit | $300.00 |
| Wind energy: residential / commercial | $100.00 / $1,000.00 |
| Septic permit and septic contractor license | Set each fiscal year by the Board of Health |
Rather talk it over?
Call 1-855-478-4290 →Worked examples: a new rural house pays the flat $25 zoning permit whatever it costs, a 15-lot subdivision plat costs $50 plus 5 × $10, or $100, and a new machine shed on a working farm outside the floodplain needs only the free exemption certificate. Septic fees are not printed on the county site; the policy says the Board of Health sets them at the start of each fiscal year and that the contractor or homeowner pays when the application is filled out.
A permit form adds its own time limit: construction must begin within 90 days of the permit being signed. Under the regulations a compliance certificate expires after 90 days without a substantial beginning and after one year if the work is not finished, unless extended in writing.
Trade permits and who may pull them
The county pages describe no county electrical, plumbing or mechanical permit, so rural wiring needs a state electrical permit from DIAL and a state inspection. Electricians, plumbers and HVAC contractors hold state licenses, and contractors earning $2,000 or more a year from construction work register with the state.
- Septic contractors must apply every year to Environmental Health for a county septic contractor license under Ordinance 2015-03, covering all their installers, show knowledge of the state rules (IAC 567 chapter 69), document the continuing education the policy requires, and file a $10,000 surety bond in favor of the county.
- Landowners may install their own septic system if they contact the Sanitarian for help laying it out, apply for a license, show knowledge of chapter 69, obtain a permit and pass a final inspection; a system installed because of a property transfer also needs a $10,000 bond good for 12 months.
- Well contractors work under the county well ordinance; Environmental Health issues private well permits and runs the state Grants to Counties program, which pays for free well water tests and helps with plugging old wells and cisterns and rehabilitating wells.
Environmental Health also performs septic time-of-sale inspections, so a rural home sale can bring the existing system under review.
Rather not deal with the Cherokee County building department?
Get a free quote →How to apply for a Cherokee County permit
Make sure the parcel lies outside the eight cities and find its zoning district.
Call 712-260-0913 to learn whether the project needs a $25 permit or the free farm exemption certificate.
No septic work of any kind may start before talking with Environmental Health, which sizes the system from a soil analysis.
Get entrance approval and a rural address from the County Engineer.
Complete the form, sketch the property, and pay the fee at the zoning office.
Begin construction within 90 days, and have the electrician buy the state electrical permit first.
Review, corrections and what causes delay
The administrator must issue the compliance certificate, or a written denial with reasons, within 15 days of the filing; if neither arrives the applicant may appeal directly to the Board of Adjustment. Projects needing a conditional use, variance or rezoning take longer because of hearings, and petitions for a rezoning that the supervisors deny cannot be refiled for a year. For septic work, Environmental Health asks for at least 48 hours’ notice for a pre-planned permit; construction or repair cannot begin until the permit is issued, though emergencies are handled as needed.
Inspections in Cherokee County
The county does not inspect framing, plumbing or mechanical work: its zoning administrator is not a building inspector, and the zoning file closes with a certificate of occupancy issued within ten days after a building is completed in line with the regulations. The county’s construction inspections are for septic systems. The Sanitarian inspects each system before it is covered, Monday to Friday between 8:00 am and 4:00 pm, and the installer must arrange a utility locate through Iowa One Call (811) before digging.
Each new system is recorded on an as-built drawing kept with the permit by the Board of Health, showing the building, well, lot lines, driveways, nearby water and drainage tile, water lines, and the septic tank, clean-out, distribution box and every lateral line with its length, depth and width. Owners receive a maintenance folder with a copy of the permit, the inspection checklist and the system map. Wiring is inspected by the state electrical inspector under the state permit.
Iowa building code
Cherokee County enforces its zoning regulations and its floodplain, well, wastewater and energy-facility ordinances in the unincorporated area, and none of the ordinances it posts is a building code. FEMA’s Community Status Book lists Cherokee County as participating in the National Flood Insurance Program, with flood maps effective December 2, 2021.
Iowa lets most cities and counties adopt the state building code, another code or none (a city of more than 15,000 must enforce at least the state code), but the energy, accessibility, fire, plumbing, mechanical and electrical rules apply statewide. Iowa rules
Want this handled start to finish?
Get a free quote →Cherokee County permit search and official resources
There is no online permit search; zoning permit and exemption records are kept by the zoning administrator, and septic permits, as-built drawings and inspection records by Environmental Health. The county posts its ordinances and resolutions on one page and the supervisors’ minutes, through October 20, 2026, on another.
- Cherokee County Zoning
- Zoning forms
- Zoning building permit form
- Fees for zoning permits
- Cherokee County Zoning Regulations
- County ordinances and resolutions
- Flood Plain Management Ordinance 2004-4
- Battery Energy Storage Systems Ordinance 2026-01
- Resolution 2026-10, battery storage moratorium
- Construction evaluation resolution 2026-01
- Environmental Health
- Onsite wastewater policy and procedures
- County Engineer
- Board of Supervisors minutes
- State electrical permits (DIAL)
- FEMA Community Status Book, Iowa
Inspections are where schedules slip.
Get a free quote →Cherokee County permit FAQs
Does Cherokee County inspect new houses outside city limits?
No. The county issues a zoning building permit, and its regulations state the zoning administrator is not a building inspector; septic systems are inspected by Environmental Health and wiring by the state.
How much is a rural building permit?
$25 for a house, addition or other non-farm building under the fee list approved in 2007.
Do farm buildings need anything from the county?
A free certificate of zoning exemption. Feedlots, confined feeding facilities and farm buildings in a floodplain are not exempt and need the regular permit.
Can I install my own septic system?
Yes, with a landowner license, a permit and the Sanitarian’s final inspection; a system installed because of a property transfer also needs a $10,000 bond.
Who gives a new rural address?
The County Engineer’s office, at 5074 Highway 3, which also reviews and approves entrance permits.
Is there still a moratorium on battery storage projects?
The March 2026 moratorium was written to last until the county enacted a battery storage ordinance; Ordinance 2026-01 took effect October 23, 2026, so ask the zoning office how new applications are being handled.
How long is a zoning permit good for?
Construction must begin within 90 days of the permit being signed, and the work must be completed within one year.
Simplify Cherokee County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Iowa. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Cherokee County sooner?
Let Alliance prepare, file, and track your Cherokee County permits while your crew stays on the job.
More Iowa permitting guides
Clay County
Read guide →Jackson County
Read guide →Jasper County
Read guide →Chickasaw County Building Permit Guide
Read guide →Clayton County Building Permit Guide
Read guide →Clinton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Cherokee County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.