Skip to main content
Municipal GuideIndianaYorktown · Delaware County

Yorktown, Indiana Building Permit Guide

To get a building permit in Yorktown, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Yorktown’s Building Commissioner at Town Hall, 9312 West Smith Street, issues building permits for one- and two-family homes directly and the local permit for commercial work after the state approves it; applications are completed in person.

Authority: Yorktown Building CommissionerFees: Ordinance 875 (May 18, 2026)Phone: 765-759-8521
Authority
Town Building Commissioner9312 W. Smith St., Yorktown
Base fee
$400 per permitPlus area, value or flat fee
New house
$400 + 0.50% of valueValuation method, Ord. 875
Inspections
Usually threeCall 765-759-0142

In the Town of Yorktown, building permits come from the Building Commissioner’s Office at Town Hall, 9312 West Smith Street (765-759-8521), where Matt Ray is Zoning and Building Commissioner. The town issues one- and two-family dwelling permits itself; commercial and industrial projects need state approval first and then a town permit. Ordinance 875, adopted by the Town Council on May 18, 2026, replaced the 2009 fee rules with a $400 base fee plus a square-foot, valuation or flat fee, taking effect 90 days after publication.

What requires a building permit in Yorktown?

The town asks owners to check with the Building Commissioner before any indoor or outdoor building project, and its permit page names new homes, additions, porches, fences, sheds, pools, signs and commercial buildings. Under the town’s 2009 Zoning Ordinance, a zoning compliance permit (Yorktown’s name for the improvement location permit) is required for:

Zoning compliance permit

  • Any building or structure over 144 square feet, or a smaller one on a permanent foundation
  • Moving a building over 144 square feet
  • Any addition to a building
  • Demolishing a structure
  • Structural alteration of a building over 144 square feet
  • A change in the use of a lot or the expansion of a land use
  • Fences and signs (separate permits under the ordinance)

No zoning compliance permit

  • Plowing and preparing land for farming, gardens and yards
  • Trimming or removing trees and shrubs
  • Earth moving for farming
  • Laying drain tile and ditch maintenance

The Building Permits page adds that fences, sheds and other minor projects need a building permit from the Building Commissioner before work starts, and that starting without one risks a stop-work order and fines.

Sheds, garages and fences under the Zoning Ordinance

  • Accessory buildings must meet the district’s standards whether or not they need a permit, sit to the side or rear of the house, stay off easements without the easement holder’s written consent, and may not go up before the house except during its construction, for personal storage or for farming. Mobile homes, trailers, boats and vehicles may not be used as accessory buildings.
  • In the R1 to R4 districts a lot may have no more than two enclosed accessory buildings, together no larger than 1,200 square feet or 12% of the rear yard, whichever is less, and any over 144 square feet must match or closely resemble the house’s exterior.
  • Residential fences may run to the property line (5 feet back along an alley), up to 6 feet tall in side and rear yards and 4 feet in a front yard; front-yard fences must be ornamental, no more than 60% opaque and not chain link. Barbed, razor or security wire is not allowed. Fences in commercial and industrial districts may be 8 feet tall but are not allowed in front yards. Every fence needs a permit.

Short on time to read all of this?

Get a free quote →

What Yorktown decides and what the state holds

Yorktown runs its own zoning within the corporate limits through a Plan Commission and Board of Zoning Appeals, sets its permit fees by ordinance, and issues the house permits itself. The Town Council adopts the zoning map, ordinance changes and planned developments that the Plan Commission certifies, and it appoints the commission’s seven voting members. Land annexed into the town is given the zoning district closest to its former county zoning. The town has 18 zoning districts, from R1 single-family to Downtown District and Farming District, with separate standards for the downtown overlay and farming district. Commercial and industrial buildings are Class 1 work: the state must approve the plans first, and the approved plan set goes in with the town application.

Yorktown building department: who handles permitting

The Building Commissioner’s Office, which also serves as the Zoning Administrator, handles permits, inspections, zoning questions and code enforcement inside the town. The Clerk-Treasurer keeps the town’s ordinances and records, and the Town Manager’s office (765-759-4003) also answers zoning questions. Land outside the town limits is permitted by the Delaware County Building Commissioner in Muncie, which covers unincorporated Delaware County only.

Yorktown permit contacts
DetailInformation
OfficeBuilding Commissioner / Zoning Administrator, Town Hall, 9312 W. Smith St., Yorktown, IN 47396 (mail: PO Box 518)
Phone / fax765-759-8521 / 765-759-4016; inspections 765-759-0142
HoursMonday to Friday, 8:00 a.m. to 4:00 p.m.
Building and Zoning CommissionerMatt Ray
Erosion controlMuncie Sanitary District Stormwater Management issues sediment and erosion control permits
Flood insuranceParticipates in the National Flood Insurance Program (community 180361); current map August 2, 2017
Outside the townDelaware County Building Commissioner, 100 W. Main St., Room 206, Muncie; 765-747-7799

Yorktown permit types

The town completes building permit applications with the applicant in person at Town Hall. The Zoning Ordinance lists the formal petitions the Zoning Administrator handles: zoning compliance, occupancy, sign, temporary sign and fence permits, development standards and use variances, special exceptions, rezonings, planned developments, administrative appeals and questionable land use appeals. Application forms come from the Zoning Administrator’s office.

Not sure this scope needs a permit?

Get a free quote →

Residential permits

For a house, addition, deck, porch or shed, bring a drawing showing the overhead (site) view and the front, side and rear elevations, so staff can check setbacks, utility easements and local code. A single-family zoning compliance application also needs the address, a site plan of the lot, setbacks from property lines and road rights-of-way, the landscaping, the location of existing and proposed buildings and paved areas, and the building height.

Commercial permits

Commercial and industrial projects get state approval first; the town permit follows with a set of the approved plans. Non-single-family site plans must be prepared by an Indiana-licensed land surveyor, engineer, architect or landscape architect and show curb cuts, utilities, wells and septic systems, floodplain or wetlands on or within 100 feet of the lot, elevations, unit counts, a landscape plan, a lighting plan and any drainage approval. The Zoning Administrator may waive items not needed to judge a project.

What comes before the building permit

  • Zoning. Use and setbacks must fit the district; the Plan Commission reviews rezonings and plats and the BZA hears use and design variances and special exceptions.
  • Erosion control. Sites that disturb soil may need a sediment and erosion control permit from Muncie Sanitary District Stormwater Management.
  • Drainage. The town’s building page links Delaware County’s general drainage standards and drainage plan application.
  • State approval. Commercial and industrial work needs the state Construction Design Release before the town permit.

Yorktown permit fees

Ordinance 875 was introduced April 20, 2026; on May 18 the Town Council accepted an amended version 7-0 and adopted it. It repealed Section 150.32 of the town code and set a new building permit fee schedule. Under its Section 4 the new fees apply 90 days after legal publication; the town has not posted the publication date, so confirm with the office that the new schedule is in force on your filing date.

Rather talk it over?

Call 1-855-478-4290 →
Yorktown building permit fees, Ordinance 875
PartFee
Base fee on every building permit$400
Plus, square-footage method (accessory structure, pole barn, shed)$0.115 per sq ft residential (Class 2); $0.495 per sq ft commercial (Class 1)
Or valuation method (primary structure, addition, remodel, pool)0.50% of total project valuation
Or flat rate (categories not listed above)Sign or fence permit $100; demolition $400

Worked examples: a new house valued at $300,000 costs $400 plus $1,500 (0.50%), or $1,900. A 200-square-foot residential shed costs $400 plus $23 (200 × $0.115), or $423. As written, every permit carries the $400 base plus one of the three methods; ask the office whether the base is added to the flat sign, fence and demolition fees.

⚠️ The town’s permit page still shows the old fees. It describes the 2009 ordinance (about $140 plus $35 per inspection for a house, $35 minimum), which Ordinance 875 replaced. The ordinance is the adopted rule once in effect.

Zoning petition fees are paid at the Zoning Administrator’s office when a docket number is assigned, and re-inspection fees must be paid before the certificate of occupancy is issued.

Trade permits and who may pull them in Yorktown

Yorktown’s building permit covers the job, and its inspections include a mechanical rough-in for water, gas and electric work. The town’s posted forms list shows no separate electrical, plumbing or HVAC permit forms; ask the office when you file how trade work is listed on your application.

  • Contractors. If you hire a contractor, the town requires that they hold a current license for their trade and be registered in Delaware County. The county registers general, electrical, plumbing and HVAC contractors yearly.
  • Plumbers must also hold the state plumbing contractor license.
  • Pools must follow both the Zoning Ordinance and the state pool rules in 675 IAC 20, according to the ordinance.

The town’s pages explain why it checks credentials: insurers look closely at liability after a fire or poor work, and unlicensed work can leave the owner paying for the damage.

Rather not deal with the building department?

Get a free quote →

How to apply for a building permit in Yorktown

1. Call the Building Commissioner

Ask at 765-759-8521 whether the project needs a permit and which district rules apply.

2. Prepare drawings

An overhead site view plus front, side and rear elevations for a house project; a licensed professional’s site plan for other uses.

3. Check contractors

Hired contractors need a current trade license and Delaware County registration.

4. Line up erosion control and drainage

Apply to Muncie Sanitary District Stormwater Management where soil is disturbed, and use the county drainage plan application where it applies.

5. Commercial: state approval first

Bring the approved plan set with the town application.

6. Apply and pay in person

The application is completed at Town Hall, and payment is due before the permit is issued.

Review, corrections and what causes delay

The Zoning Administrator reviews fence permits from a scaled plan showing the lot, existing structures and utilities, setbacks, the fence location and its height and materials, and approves those that clearly meet the standards. A zoning compliance permit expires if work has not begun within one year or is not finished within two years; the Zoning Administrator may grant up to three six-month extensions if asked within two weeks of expiry. Work that differs from the approved plans is a violation and can bring a stop-work order, removal or fines. Projects that need a variance or rezoning wait for the BZA or Plan Commission and the Town Council.

Inspections and certificate of occupancy in Yorktown

The Building Commissioner inspects throughout construction. Three inspections are typical: foundation, mechanical rough-in (water, gas and electric) and final. Larger or more complex buildings may get more. Schedule them with the Building Commissioner’s office at 765-759-0142.

  • Foundation inspection.
  • Mechanical rough-in for the water, gas and electrical systems.
  • Final inspection when the work is complete.
  • Certificate of occupancy: issued to the contractor once all inspections are passed and any re-inspection fees are paid.

The Zoning Ordinance adds an occupancy permit from the Zoning Administrator before anyone uses a building that needed a zoning compliance permit, and before using temporary classrooms, sales or construction trailers or model homes. It is issued once the zoning compliance and building permits are in place, the building inspector’s final is passed, and the Zoning Administrator approves the application. Where weather delays landscaping, building finishes or parking-lot paving, the Zoning Administrator may issue it early and may ask for a performance bond, letter of credit or contract as surety. Occupying without the permit can bring a stop-work order, fines or penalties.

Want this handled start to finish?

Get a free quote →

Indiana building code

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Yorktown building permit FAQ

Do I need a permit for a shed in Yorktown?

Yes for a building permit, according to the town’s permit pages. A zoning compliance permit is needed for any structure over 144 square feet, or a smaller one on a permanent foundation.

Do I need a permit for a fence?

Yes. Fences need a permit from the Building Commissioner; Ordinance 875 lists a $100 flat rate for a fence permit.

How much is a building permit for a new house in Yorktown?

Under Ordinance 875, the $400 base fee plus 0.50% of the project value; a $300,000 house works out to $1,900.

How many sheds or garages can I put on a house lot?

In the R1 to R4 districts, no more than two enclosed accessory buildings, with a combined size no larger than 1,200 square feet or 12% of the rear yard, whichever is smaller.

Who issues commercial permits in Yorktown?

The state approves commercial and industrial plans first; the Yorktown Building Commissioner then issues the town permit with the approved plans attached.

Can I apply online?

The town’s permit page says applications are completed in person at Town Hall, 9312 W. Smith St.

How long is a zoning compliance permit valid?

Work must begin within one year and be finished within two; up to three six-month extensions are possible. A fence permit is shorter: start within six months and finish within one year.

My property is outside Yorktown. Who issues the permit?

The Delaware County Building Commissioner (765-747-7799) for unincorporated land, or the city or town office if it lies in another municipality.

Permit search and official resources

Permit and inspection records for a Yorktown property are held by the Building Commissioner’s Office; approved plans are kept by the Plan Commission, Zoning Administrator or Building Commissioner. For other town records, call the Clerk-Treasurer at 765-759-8521 (press 4) for the records request form. Council agendas, ordinances and minutes are posted with each meeting.

Inspections are where schedules slip.

Get a free quote →

Simplify Yorktown permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Yorktown sooner?

Let Alliance prepare, file, and track your Yorktown permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Yorktown permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.