In the Town of Clarksville, construction permits come from the Building Commissioner’s office in Suite 234 of the Administration Building, 2000 Broadway (812-283-1510, weekdays 8:30 a.m. to 4:30 p.m.). Applications, drawings, fee payments and inspection requests go through the town’s GovWell portal, and electricians, plumbers and HVAC contractors need a town license. Street cuts and sewer permits are the exception: Public Works and the wastewater billing office issue those.
What requires a building permit in Clarksville?
The town’s services directory lists what a building permit covers: fill; framing; plumbing, electrical and heating installation; sprinkler systems, fire alarms and hood assemblies; fences; sidewalks; foundations; signs and other building projects. It adds that permits are needed for construction, renovation and repair “in many instances”, so the office is the place to settle a borderline job.
Building permit
- New buildings and additions
- Framing and structural repairs
- Foundations and other building projects
- Fences and sidewalks
- Fill brought onto a lot
- Signs
Trade and other permits
- Electrical: any new residential or commercial wiring, a service upgrade or moving a meter
- Plumbing and heating installation
- Mechanical (HVAC) work
- Commercial sprinklers, fire alarms and hood systems
- Curb cuts and pavement cuts (Street Department)
- Sewer connections (wastewater billing office)
What Clarksville decides and what the state holds
The Building Commissioner enforces the state-adopted building codes and, with Planning and Zoning, the town’s own zoning ordinance and subdivision regulations. The town sets its permit and license fees, licenses electrical, plumbing and mechanical contractors, and requires Plan Commission approval of a development plan for all new construction and for many renovations and site changes. Indiana keeps the codes themselves and the design release for Class 1 buildings; the town says commercial fire alarms and sprinkler systems need that state release, a town permit and inspection by both the Fire Marshal and the Building Commissioner.
The Town Council has approved ordinances amending both the general ordinances and the zoning ordinance so that data centers, as the ordinance defines them, are not permitted in any zoning district in Clarksville; the town announced the change on July 14, 2026. The definition leaves out ordinary server rooms, routine information technology services and telecommunications facilities. The town gave limited land as a reason: Clarksville covers about 10 square miles, and roughly 20% of it is considered undevelopable because of regular flooding.
Clarksville building department: who handles permitting
The Building Commissioner’s office issues permits, licenses trade contractors, inspects the work and issues the certificate of occupancy. The same office handles zoning-use compliance, rezoning and zoning appeal requests, weed control, junk cars and unsafe housing, with a staff of four: the Building Commissioner, two inspectors and a secretary. Planning and Zoning staffs the Plan Commission, the Board of Zoning Appeals and the Technical Review Committee and keeps the town’s maps and GIS.
Short on time to read all of this?
Get a free quote →The commissioner’s post has been hard to fill: in July 2026 the council approved a national search firm to recruit a permanent Building Commissioner after two earlier attempts, so ask who signs permits. The town’s Building Commission, a board, gained a new role in January 2026 when the council adopted a fire prevention code: it now acts as hearing officer for actions under the fire ordinance and hears and decides appeals.
| Detail | Information |
|---|---|
| Building Commissioner’s office | Suite 234, Administration Building, 2000 Broadway, Clarksville, IN 47129 |
| Phone and hours | (812) 283-1510; Monday to Friday, 8:30 a.m. to 4:30 p.m. |
| Planning and Zoning | Same suite and phone, (812) 283-1510 |
| Online portal | GovWell (app.govwell.com/clarksville), open 24 hours |
| Street and curb cuts | Public Works / Street Department, 107 Roy Cole Drive; (812) 283-8233 |
| Sewer (wastewater) permits | Wastewater Billing Office, first floor of Town Hall, 2000 Broadway |
| Fire inspections | Fire Department, (812) 282-7619 |
Clarksville borders Jeffersonville and Sellersburg, and each runs its own building office, so confirm from the parcel record that an address is inside town limits before you file. Land in unincorporated Clark County is outside the town’s jurisdiction.
Clarksville permit types
GovWell carries building permits, trade permits, contractor licenses and zoning approvals. Users set up an account with an active email address, then submit drawings and documents, pay fees, request inspections and look up pending applications, issued permits and inspection results. Applicants without internet access can use staffed portal stations at the office.
Residential permits
- New houses and additions need a building permit and inspections at several stages.
- Decks: the Building Commissioner’s office handles deck permits.
- Fences need a permit; the Planning and Zoning office or the Building Commissioner can explain height and placement rules.
- Pools: residential pool installation is regulated by the Building Commissioner’s office.
- Electrical: any new wiring, a service upgrade or a moved meter needs an electrical permit.
- Solar: the town posts a permitting checklist for owners installing their own solar panels.
- House numbers must be shown on every house in figures at least 3 inches tall.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
New commercial buildings and many renovations and site changes go to the Plan Commission for development plan approval before the building permit. Commercial sprinkler and fire alarm systems need a town permit after the state design release, and signs follow the size, number, location and design rules in the zoning ordinance. The town issues no general business license but does license transient merchants, taxicabs, massage therapists and adult businesses through the Building Commissioner or Planning and Zoning.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Technical Review Committee. Department directors review projects early, on the second and last Thursday of each month between 9:00 and 11:30 a.m.; the committee decides some cases and recommends most to the Plan Commission, BZA or Town Council. Schedule through Planning and Zoning.
- Development plan. Plan Commission approval for new construction and many renovations or site changes. The commission meets on the first Wednesday of each month in the Administration Building; its next meeting is listed for December 2, 2026 at 7:00 p.m.
- Variances and special exceptions. The Board of Zoning Appeals hears them on the fourth Wednesday of each month at 7:00 p.m. in the Administration Building.
- Floodplain. Planning and Zoning says whether a property is in a flood plain and which restrictions apply.
- Street and sewer. Street cut and wastewater permits are issued outside GovWell, at Public Works and the wastewater billing office. A right-of-way application is due five working days before the proposed start, only from contractors licensed with the town. The July 2026 fee ordinance moves these applications into GovWell, while the portal page still sends them to Public Works, so ask which to use.
- State release. Class 1 buildings need the state Construction Design Release first.
Clarksville permit costs and fees
Building, trade and zoning permits are priced under the town’s current building and zoning fee schedule, which the Building Commissioner and Planning and Zoning page links as an online document, with a separate contractor fee schedule for trade licenses. The council took up Ordinance 2025-G-14, amending the fee schedule for the building and zoning departments, at its May 6 and May 20, 2025 meetings. The office quotes the fee for a specific job at (812) 283-1510, and fees are paid in GovWell by card or electronic check, or in cash or by check at the office.
Two related permits have published prices. Work on a sanitary sewer line, from the town main to the connection inside the home, needs a $75 permit from the Wastewater Billing Office. Work in a street, sidewalk or utility corridor needs a right-of-way permit, whose fees the council updated on July 7, 2026.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Base permit fee, includes the pre-construction inspection | $75 each |
| Pavement cut, pavement over 5 years old | $1 per sq ft |
| Pavement cut, pavement 4 or 5 years old | $2 per sq ft |
| Pavement cut, pavement 3 years old or less | $40 per sq ft |
| Curb and gutter | $1 per linear foot |
| Sidewalk, crosspan or driveway ramp | $1 per sq ft |
| Water, sanitary, fire line or storm work | $1 per sq ft; minimum connection $100 |
| Gas, phone, cable, electric, conduit trenching | $1 per sq ft |
| Pedestals, pull boxes, transformers, cabinets | $75 each |
| Public Works inspection, per category of work | $75 each |
The draft permit form in the same packet shows a $100 base fee in one box and $75 in its summary, so confirm the base fee with Public Works at (812) 283-8233. Worked example with the schedule’s $75 base fee: a driveway ramp of 60 square feet into a street with pavement older than five years, with a 40-square-foot pavement cut, comes to $75 base + $40 pavement + $75 inspection + $60 ramp + $75 inspection = $325.
Fee accounting changes in 2027. Under House Enrolled Act 1001 (2026), the State Board of Accounts’ Directive 2026-01 requires building, zoning and development fees collected after December 31, 2026 to go into a dedicated Building and Construction Related Fees Fund used only for the costs of that work. The council discussed it on July 7, 2026, and the town manager’s memo proposed moving the services to full cost recovery from applicants, so check for a new schedule before budgeting a 2027 project. New businesses should also budget for stormwater: the business rate is $3.85 a month plus $5.20 for every 2,527 square feet of impervious surface.
Trade permits and who may pull them
A town license is required to do electrical, plumbing or mechanical business in Clarksville, and the Building Commissioner’s office issues all three.
- Electrical. Licenses are based on scores on the National Assessment Test or NAI/Block & Associates exams. The Building Commissioner’s office conducts electrical inspections.
- Mechanical (HVAC). Heating and air contractors are licensed on the same exam basis; the office administers the mechanical code for heating, air conditioning, ventilation and refrigeration.
- Plumbing. The town issues its license to plumbers who hold an Indiana plumbing license, and the office enforces the plumbing code.
- Fire protection. Commercial sprinkler and alarm permits are issued by the Building Commissioner’s office and inspected with the Fire Marshal.
Rather not deal with the building department?
Get a free quote →The town’s pages do not describe a separate homeowner permit or a general contractor license; call the office before an owner does trade work.
How to apply for a Clarksville building permit
Check that the parcel is inside town limits and ask Planning and Zoning about zoning, floodplain status and whether a development plan is needed.
For larger projects, book the Technical Review Committee and any Plan Commission or BZA hearing.
Create an account with an active email address, or use a staffed station at the office.
Upload drawings and documents, and list licensed trade contractors.
File any street cut at Public Works and any wastewater permit at the billing office.
Pay online or at the office, then request inspections through GovWell or by phone.
Review, corrections and what causes delay
New construction needs Plan Commission approval of a development plan, which adds a hearing cycle, and the Technical Review Committee may first send a recommendation to the commission, the BZA or the Town Council. Commercial fire protection work cannot be permitted before the state design release. Trade work must be done by a contractor holding a Clarksville license, and an electrical upgrade needs its own electrical permit.
Inspections and certificates in Clarksville
Work under a permit is inspected, often at several stages, and the certificate of occupancy is issued once construction has passed every required inspection. Request an inspection in GovWell or call the Building Commissioner’s office at (812) 283-1510 to book building, electrical, plumbing or mechanical inspections; inspection results also show in the portal. The Fire Department inspects businesses separately and takes requests at (812) 282-7619.
Right-of-way work has its own inspections by Public Works: every pavement, concrete and utility job is inspected, the applicant must call Public Works at (812) 283-8233 at least 24 hours before starting, and a right-of-way permit expires 30 days after it is signed unless the town notes otherwise.
The office also handles housing code standards and reports of unsafe buildings, and the zoning ordinance caps grass and weeds at 12 inches.
Indiana building code in Clarksville
FEMA’s Community Status Book lists the Town of Clarksville (community 180026) as participating in the National Flood Insurance Program, with flood maps effective April 16, 2014, and in the Community Rating System at class 8, a 10% premium discount, since May 1, 2017.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Clarksville permit search and official resources
GovWell lets users look up pending applications, issued permits and inspection results and review parcel information. For other records, file a digital records request in GovWell’s Public Records Request module. Town Council minutes and ordinances come from the Clerk-Treasurer’s office, (812) 283-1500, and council, Plan Commission and BZA agendas, packets and minutes are posted on the town’s Granicus meeting page.
- Clarksville Building Commissioner and Planning and Zoning
- GovWell permit portal instructions
- GovWell portal
- Town services directory
- Meeting agendas, packets and minutes (Granicus)
- Public Works and Wastewater (sewer permits, rates)
- Staff directory
- Request for records
- Historic Preservation Commission
- Comprehensive Plan
- Subdivision regulations
Clarksville building permit FAQs
Inspections are where schedules slip.
Get a free quote →Do I need a permit for a fence in Clarksville?
Yes. The town lists fences among the projects that need a building permit; Planning and Zoning or the Building Commissioner can give the height and placement rules.
Can I apply online?
Yes. GovWell takes applications, drawings, payments and inspection requests around the clock; staffed stations at the office help people without internet access.
Do electricians need a Clarksville license?
Yes. Electrical and HVAC licenses are based on National Assessment Test or NAI/Block & Associates scores, and plumbers receive a town license based on their state plumbing license.
Where do I get a curb cut or street cut permit?
From the Street Department at Public Works, 107 Roy Cole Drive, (812) 283-8233. The portal page keeps these permits out of GovWell, although the July 2026 ordinance moves them there; ask which to use.
Does new construction need Plan Commission approval?
The town says all new construction, and many renovations and site changes, need a development plan approved by the Plan Commission.
Who inspects electrical work?
The Building Commissioner’s office conducts electrical inspections, along with building, plumbing and mechanical inspections.
Can a data center be built in Clarksville?
No. Ordinances the Town Council approved, announced on July 14, 2026, bar data centers, as defined, from every zoning district; ordinary server rooms and telecommunications facilities are excluded from the definition.
How much is a sewer or street cut permit?
A permit for sewer line work between the town main and the house is $75 at the Wastewater Billing Office. A right-of-way permit starts with a $75 base fee plus per-square-foot cut fees and $75 inspections under the July 2026 schedule.
How do I get copies of old permits?
Search GovWell for permits on file, or submit a public records request through the GovWell Public Records Request module.
Simplify Clarksville permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Clarksville sooner?
Let Alliance prepare, file, and track your Clarksville permits while your crew stays on the job.
More Indiana permitting guides
Clark County
Read guide →Jeffersonville
Read guide →Floyd County
Read guide →Clay County Building Permit Guide
Read guide →Clinton County Building Permit Guide
Read guide →Connersville Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Clarksville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.