Skip to main content
Municipal GuideIllinoisNorth Aurora · Kane County

North Aurora, Illinois Building Permit Guide

To get a building permit in North Aurora, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

North Aurora’s Community Development Department issues building permits inside the village, with applications and inspection requests handled through Cloudpermit or on paper at the Public Works building while Village Hall is closed.

Authority: Community Development, Building and Zoning DivisionFiling: CloudpermitPhone: 630-897-1457
Authority
Building and Zoning DivisionCommunity Development Department
Paper filing
312 Butterfield RoadPublic Works, while Village Hall is closed
Review time
10 working daysResidential applications
Remodel permit
$350 / $500Without / with plumbing

Inside North Aurora, permits come from the Building and Zoning Division of the Community Development Department (630-897-1457, cdinfo@northaurora.org), headed by Community Development Director Nathan Darga. Applications, status checks and inspection requests run through Cloudpermit; paper applications go by email or to the Public Works Department at 312 Butterfield Road while Village Hall at 25 East State Street is closed for renovation after the July 2026 storm damage. Residential applications take about 10 working days, and a remodel or addition permit costs $350, or $500 with plumbing.

What requires a building permit in North Aurora?

The village lists new commercial buildings and commercial remodeling, new single-family homes and residential remodeling, roofing, siding, windows, driveways, patios, stoops, walkways, fences, decks, pergolas, gazebos, three-season rooms, additions, structural changes, electrical and plumbing work, gas lines, generators, lawn sprinklers, solar panels, signs, pools and hot tubs as typical permit projects. Its local amendments to the 2021 International Residential Code make the Director of Community Development (or a designee) the building official and strike six building items (numbers 1 to 5 and 10) from the code’s list of work exempt from permit, the items that in the model code exempt small accessory buildings, fences, retaining walls, water tanks, sidewalks and driveways, and low decks, so that work needs a village permit.

Permit needed

  • New homes, additions and remodels, including kitchens and baths
  • Roofing, siding and windows
  • Fences, decks, patios, stoops and walkways
  • Sheds, pergolas, gazebos and three-season rooms
  • Driveways
  • Pools and hot tubs
  • Generators, gas lines, solar panels and lawn sprinklers

No permit

  • Painting, wallpaper and flooring
  • Tuckpointing, gutters and downspouts
  • Appliance repair or replacement and minor repairs
  • Small playground sets, trampolines and arbors
  • Baby pools holding less than 2 feet of water
  • Awnings, patio umbrellas and bird feeders

What North Aurora decides and what the state holds

North Aurora has adopted the 2021 International Building, Residential, Existing Building, Mechanical, Fuel Gas, Property Maintenance and Swimming Pool and Spa codes and the 2020 National Electrical Code, each with local amendments posted on the Building and Zoning Division page. The 2021 International Fire Code and the NFPA fire codes are administered through the North Aurora Fire District. The Illinois Plumbing Code, Illinois Energy Conservation Code and Illinois Accessibility Code apply as state-required codes, and plumbing must be done by a licensed plumber except by a homeowner in a permanent residence.

Short on time to read all of this?

Get a free quote →

North Aurora building department: who handles permitting

The Building and Zoning Division of the Community Development Department maintains the village’s building and zoning ordinances and issues building permits; staff check each application for completeness and review the plat of survey and drawings against local, state and national standards. The village’s applications page says Village Hall is closed for renovation following the storm damage in July (the storms of July 2 to 4, 2026, per the village notice of July 7), so paper filings go to Public Works for now. The Planning Division and the Plan Commission handle zoning cases, and the North Aurora Fire District handles fire code matters. Parcels outside the village limits are permitted by Kane County (see the Kane County building permit guide); the City of Aurora runs its own separate department.

North Aurora permit contacts
DetailInformation
DepartmentCommunity Development, Building and Zoning Division
Phone630-897-1457 (Building and Zoning also 630-897-8228 ext. 259)
Emailcdinfo@northaurora.org
Paper applicationsPublic Works Department, 312 Butterfield Road, while Village Hall is closed
Village Hall25 East State Street, North Aurora, IL 60542; closed for renovation after the July 2026 storm damage (posted hours weekdays 8 a.m. to 4:30 p.m.)
Department headNathan Darga, Community Development Director
Online portalCloudpermit

North Aurora permit types

The village posts a separate application for each common residential project (deck, driveway, fence, lawn sprinkler, new single-family home, patio, pergola or gazebo, pool, remodel or addition, roofing, siding and windows, shed, solar panels and sod watering) and for non-residential new construction, remodels and additions, and signs. Every application must arrive complete, or it is not accepted, and the review clock starts only when everything is in.

Residential permits

  • Remodels and additions. A current plat of survey showing all existing improvements and the new work to scale (not needed for interior remodels), the contractor’s contract or proposal and a scope of work with construction details. Pre-1978 buildings need EPA lead-safe certified contractors.
  • Sheds, decks, pools and driveways. The plat plus a location worksheet whose distances match it (driveways need two plat copies); no building may sit in an easement, although fences are allowed in some. Owners are responsible for meeting their homeowner association’s by-laws and covenants.
  • Site plans for new buildings. The amended code calls for a site plan drawn from a boundary survey by an Illinois Professional Land Surveyor, showing street grades, finished grades, top of foundation and corner elevations; a foundation survey must be approved before framing starts, and as-built drawings are due when a new building is finished. Buildings in flood hazard areas follow chapter 15.64 of the village code.
  • Fences. A plat marked with the fence route; heights are capped at 3 feet in front yards and 4 feet in corner side yards, and 6 feet in side and rear yards (8 feet next to business, office or industrial land).
  • New homes. Architect-stamped plans that are not flopped or flipped, truss certifications and layout, a performance energy report, Manual J and S calculations, a PDF of everything and a $500 deposit credited to the permit fee. Before issuance the village needs the contractor list, the plumber’s letter of intent, roofing and plumbing licenses, a paid Fox Metro Water Reclamation District permit and a paid Kane County road impact fee receipt.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Non-residential projects use the new construction, remodel and addition, or sign applications. Under the village’s code amendments, drawings for new one- and two-family homes, townhouses and any addition or alteration that changes the structural design must be signed and stamped by an Illinois-registered design professional, and commercial work also coordinates with the North Aurora Fire District.

What comes before the building permit

  • Zoning. Map and text amendments, variances, special uses, planned unit developments and site plan review go through Cloudpermit or a paper application to the Plan Commission, which meets monthly on the first Tuesday and makes recommendations to the Village Board. A zoning verification letter or home occupation approval uses its own form.
  • Sewer. Connections in the Fox Metro service area need a Fox Metro engineering permit.
  • Stormwater and roads. The village points applicants to Kane County’s stormwater rules and the road impact fee of the Kane County Department of Transportation (KDOT).

North Aurora permit costs and fees

North Aurora’s permit fees are set in Chapter 15.56, Development and Permitting Fees, of the village code. The application forms print a few of them, and staff contact you when the permit is approved; payment can be made by phone with a debit or credit card, and the permit is then emailed.

Rather talk it over?

Call 1-855-478-4290 →
North Aurora fees and charges printed on village forms
ItemDetail
Residential remodel or addition, no plumbing$350
Residential remodel or addition with plumbing$500
New single-family home$500 deposit at submittal, credited to the permit fee
Other residential permitsSet in Chapter 15.56; the fee is listed on each project’s information sheet
Failed inspectionRe-inspection fee may apply, paid before rebooking
Fox Metro sewer permitPaid to Fox Metro before a new home permit issues
Kane County road impact feePaid to KDOT before a new home permit issues

Worked example from the forms: a kitchen remodel that moves plumbing is a remodel with plumbing, so the permit is $500, while a bedroom-only remodel with no plumbing is $350. For a new home, the $500 paid at submittal comes off the final permit fee. Starting work before a permit adds a further fee under Title 15, and fines for code violations follow Section 15.08.050. Contractors pay no village registration fee, because registration is not required.

Trade permits and who may pull them

Electrical, plumbing, gas line, lawn sprinkler, generator and solar work all need village permits through the same division. North Aurora does not require contractor registration; instead, the application asks for a copy of the State of Illinois roofing or plumbing license where the job involves that trade. The remodel and addition form names the general contractor, plumbing contractor and roofing contractor, with license numbers for the last two, and asks whether the project includes plumbing, which sets the fee.

  • Plumbing: every permit with plumbing needs a letter of intent on the licensed plumber’s stationery, signed by the license holder, with the corporate seal if the business is incorporated or notarized if it is not.
  • Homeowner plumbing: a homeowner may install the plumbing in a home that is his or her permanent residence, but still files a letter of intent naming the homeowner as installer and must make sure the work meets the state plumbing code before calling for inspection.
  • Roofing: a copy of the Illinois roofing license; solar panel permits also need a letter of intent from a licensed roofer.
  • Lawn sprinklers: irrigation systems use the village’s lawn sprinkler (RPZ) application.

Rather not deal with the building department?

Get a free quote →

How to apply for a North Aurora building permit

1. Confirm the parcel

Make sure the property is inside North Aurora, not Aurora or unincorporated Kane County.

2. Create a Cloudpermit account

Register on the village’s Cloudpermit page to file and track applications.

3. Assemble the packet

Use the project application’s checklist: plat, contract, scope, licenses and letters of intent.

4. Submit

File on Cloudpermit, email cdinfo@northaurora.org, or bring paper to Public Works at 312 Butterfield Road.

5. Pay

When staff call or email to say the permit is approved, pay by phone with a debit or credit card; the permit is emailed.

6. Post the job card

Keep the permit job card visible from the street until the certificate of occupancy issues.

Review, corrections and what causes delay

Allow ten working days for residential applications; the clock starts only when every required document is in, and incomplete submittals are turned away. Cloudpermit sends an email whenever an application’s status changes and lets you message staff and request changes to an issued permit. A new home permit is not issued until the contractor list, plumbing letter of intent, licenses and the paid Fox Metro and road impact fee receipts are in.

Inspections and certificates in North Aurora

Schedule and cancel inspections in Cloudpermit, which also shows each inspection’s status; the required inspections are listed on the permit job card, and the applicant is responsible for booking every one. If an inspection fails, the re-inspection fee must be paid before the next visit is scheduled. Homeowners installing their own plumbing must confirm it meets the state plumbing code before asking for a plumbing inspection. The job card stays on site, visible from the street, until the village issues the certificate of occupancy. Sites and their access roads must be kept clean, free of mud and debris and open to emergency vehicles at all times; the general contractor is responsible, and the building official can post a stop work order if they are not. A temporary certificate of occupancy for part of a building is possible under chapter 15.52 of the village code. Work is allowed from 6 a.m. to 9 p.m. Monday through Saturday and 8 a.m. to 6 p.m. on Sunday, and the village keeps a cold-weather concrete policy for winter pours.

Illinois building code in North Aurora

North Aurora enforces the 2021 International codes and 2020 National Electrical Code listed on its Building and Zoning Division page, with local amendments. FEMA’s Community Status Book lists the Village of North Aurora (community 170329) as participating in the National Flood Insurance Program, with a current flood map dated August 3, 2009; the village is not in the Community Rating System.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

North Aurora building permit FAQs

Where do I drop off a paper permit application while Village Hall is closed?

At the Public Works Department, 312 Butterfield Road, or by email to cdinfo@northaurora.org; Cloudpermit is open around the clock.

Do I need a permit for a new roof or windows in North Aurora?

Yes. Roofing, siding and windows are on the village’s permit list and share one application, with a copy of the roofer’s Illinois license.

How much is a remodel permit?

$350 for a residential remodel or addition without plumbing and $500 with plumbing.

Do contractors have to register with the village?

No. North Aurora does not require contractor registration, but plumbing and roofing jobs need copies of the state licenses.

Is a small shed exempt?

No. The village’s code amendments remove the model code’s small-shed exemption, and sheds have their own permit application.

How long does review take?

About ten working days for residential applications once every required document has been submitted.

Who is North Aurora’s building official?

The Director of Community Development or a designee, under the village’s amendment to the residential code; appeals of building decisions follow Section 15.08.030 of the village code instead of the model code’s board of appeals.

Can I build on Sunday?

Yes, between 8 a.m. and 6 p.m.; Monday through Saturday the hours are 6 a.m. to 9 p.m.

North Aurora permit search and official resources

Applicants follow their own permits and inspections in Cloudpermit, and Community Development answers status questions at 630-897-1457. For copies of permit records, send a written Freedom of Information Act request to the village’s FOIA Officers by mail, hand delivery, fax or email; the village prefers its request form but does not require it.

Inspections are where schedules slip.

Get a free quote →

Simplify North Aurora permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in North Aurora sooner?

Let Alliance prepare, file, and track your North Aurora permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about North Aurora permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.