New Lenox issues its own building permits through the Building Department, a division of Community Development at Village Hall, 1 Veterans Parkway (815-462-6490). Fences, roofs, driveways, HVAC units and other common jobs can be applied for online through BS&A Online and usually cost $75, remodeling permits are $8 per $1,000 of construction cost, and every contractor must hold a $150 village registration backed by a $10,000 bond.
What requires a building permit in New Lenox?
The village’s starting rule is structural: any construction or remodeling that builds or alters a structural part of a building needs a building permit. Beyond that, New Lenox sorts its permits into miscellaneous permits for small jobs, remodeling permits, roofing, pools and hot tubs, signs and new construction.
Permit needed
- Room additions, attached and detached garages and three-season rooms
- Interior remodeling and rooftop solar
- Covered decks, porches, gazebos and pergolas; uncovered decks
- Sheds, and playhouses over 100 square feet
- Fences, driveways and underground sprinklers
- Roofs, windows, doors and siding
- Furnaces, air conditioners, water heaters and radon mitigation systems
- Electrical service upgrades, generators and electric car chargers
- Pools, hot tubs, signs and demolition
No permit
- Private sidewalks
- Concrete or paver patios
- Dog runs
- Playhouses under 100 square feet
Size decides which permit a shed needs. Up to 180 square feet it is a miscellaneous permit; anything larger is treated as a detached garage and needs a remodeling permit with footing, foundation and framing details. No work may start until the permit is paid for and issued, and starting early can double the fee.
What New Lenox decides and what the state holds
New Lenox adopts its own codes with local amendments, which are available at Village Hall. Its Building Code page lists the 2018 International Building, Residential, Mechanical, Fuel Gas, Fire and Property Maintenance Codes, the 2017 National Electrical Code, the 2014 Illinois State Plumbing Code, the 2018 Illinois Accessibility Code and the 2024 International Energy Conservation Code with Illinois amendments. The Building Code page also points new construction to the state’s electric-vehicle charging requirements under Public Act 103-0053, effective January 1, 2024.
New Lenox building department: who handles permitting
The Building Department is responsible for all phases of construction, permitting and inspection in the village: it reviews plans, issues permits and inspects everything from a backyard shed to commercial projects and medical facilities. The Engineering Department reviews every new construction project for municipal utilities and stormwater detention, and the village enforces a property maintenance code for residential property.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Community Development (Building Department) | Permits, plan review, inspections, contractor registration | Village Hall, 1 Veterans Parkway, New Lenox, IL 60451; 815-462-6490; fax 815-462-6469; buildinginspections@newlenox.net |
| Village Hall | General questions; Village Clerk and FOIA | 815-462-6400; Monday to Friday 8:30 a.m. to 5 p.m. |
| Engineering Department | Utilities, detention, right-of-way work | Village Hall, 815-462-6400 |
| Plan Commission / Zoning Board of Appeals | Zoning, variances, temporary uses | 7 p.m., first and third Tuesdays, 1 Veterans Parkway |
New Lenox has about 28,900 residents, all in Will County. The village zoning map shows its limits: any parcel left uncolored on the map is unincorporated and falls under Will County’s zoning jurisdiction, so its building permit comes from the county’s Land Use Department instead.
New Lenox permit types
The village publishes a permit application and a matching guide for each category: new construction (residential, multi-family and commercial-industrial), remodeling (residential and commercial-industrial), miscellaneous permits, roofing, pools and hot tubs, signs and temporary uses. Many of the smaller permits can now be filed through BS&A Online.
Residential permits
- Miscellaneous permits. Furnaces, air conditioners and water heaters, uncovered decks and porches, driveways, electrical service upgrades, fences, generators, car chargers, garage heaters, radon systems, sheds up to 180 square feet and large playhouses. The village asks for three to five working days to review them.
- Remodeling permits. Additions, garages, covered decks and porches, larger sheds, interior remodels, roofs, rooftop solar, underground sprinklers and window, door or siding replacements, reviewed in seven to ten working days.
- Fences. No more than 3 feet in a front yard, 6 feet in side and rear yards and 4 feet in a corner side yard, with posts facing inside the lot; in an easement the bottom must be raised so water passes under. A pool fence is 5 to 6 feet tall.
- Garages and large sheds. At least 5 feet from side and rear lines and 10 feet from the house (more when the facing wall is over 20 feet long), never in an easement, and no taller than 15 feet. Buildings under 600 square feet may sit on a floating slab with a thickened 12-by-18-inch edge; larger ones need supports that reach the frost line unless they rest on solid rock or are otherwise protected from frost.
- Driveways. Concrete driveways are at least 5 inches thick with 6-by-6 welded wire fabric (or approved fiber reinforcement), using a six-bag mix with 4% to 7% air entrainment that reaches 3,500 psi in 28 days.
- New houses. The residential new construction packet (updated January 2022) sets the documents, fees and inspections; a final grade survey and grading bonds apply.
Not sure this scope needs a permit?
Get a free quote →Electrical work follows local minimums: a house under 1,500 square feet needs at least a 100-amp service and a larger house at least 200 amps, and the miscellaneous guide requires service work to be installed in metal conduit (EMT, IMC or rigid).
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial projects use the new construction or remodeling packets for that class, multi-family buildings have their own packet, and elevators have a separate guide and permit. Commercial certificates of occupancy, including temporary ones, are issued on their own applications.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The seven-member Plan Commission serves as the village’s planning agency and its Zoning Board of Appeals, hearing appeals and variances and reviewing temporary use requests.
- Engineering. New construction is checked for utility capacity and stormwater detention, and the village publishes engineering design standards and an NPDES Phase II stormwater page.
- Right-of-way. A contractor working in the public right-of-way must contact the Village Engineer before starting.
- Winter concrete. From December 1 to March 30 no concrete flatwork may be placed; the village accepts bonds instead of exterior concrete during that period.
New Lenox permit costs and fees
New Lenox publishes its fees in its permit guides. The remodeling and miscellaneous guides set flat and value-based fees, and the residential new construction packet carries a fee sheet effective January 1, 2023 that charges the building permit by floor area and adds utility and village fees.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Miscellaneous permits (HVAC unit, deck, driveway, fence, service upgrade, generator) | $75 each |
| Roof, underground sprinkler, or window / door / siding replacement | $75 each |
| Other remodeling permits | $8 per $1,000 of estimated construction cost |
| Reinspection on miscellaneous and remodeling permits | $25 each |
| New house: living area | Square feet x $137.90 x 0.008 |
| New house: basement | Square feet x $23.57 x 0.008 |
| New house: garage | Square feet x $53.77 x 0.008 |
| New house: sewer / water tap-on | $8,156 / $5,092 |
| New house: plan review | $150, then $35 for each additional review |
| New house: inspection fees | $500 |
| New house: transportation / municipal building / infrastructure fees | $713 / $569 / $100 |
| New house: water meter equipment (1-inch), deposit, temporary water | $600, $50, $50 |
| New house: reinspections | $75 for the first; $300 each after the second |
| Certificate of occupancy | $30 |
Worked example. Using the rates on the fee sheet, a house with 2,000 square feet of living area, a 1,000-square-foot basement and a 575-square-foot garage pays $2,206.40 for living area, $188.56 for the basement and $247.34 for the garage, a building permit of $2,642.30. The village’s own example on that sheet shows $2,641.90 because it multiplies the basement by $23.52 rather than the $23.57 rate printed above it. Tap-on, meter, temporary water, plan review, inspection, transportation, municipal building and infrastructure fees then add $15,980, the certificate of occupancy $30, and an open space contribution may apply under Resolution 19-20. For a remodel, a $40,000 kitchen project costs $320.
Trade permits and who may pull them
New Lenox treats most trade work as its own small permit. Furnace, air conditioner and water heater replacements, electrical service upgrades, generators and car chargers are miscellaneous permits at $75 each; sewer repairs and irrigation systems can be filed online; and plumbing on a new house is inspected at the underground, rough and final stages by the village.
- Contractor registration. All contractors and subcontractors working in the village must be registered, and no building permit is issued for work involving an unregistered contractor. Registration costs $150 and needs proof of general liability insurance with a $1,000,000 per-occurrence limit, workers’ compensation where it applies, and an original $10,000 surety bond.
- Plumbers and sprinkler contractors. They file only the application, a copy of the business’s state registration and their State Plumbers ID card.
- Homeowners. Owners may do work on their own primary residence but still need the permit; in BS&A Online they check the homeowner box instead of creating a contractor account.
- Contractor accounts. Contractors, engineers and design professionals log in to a BS&A contractor account linked by a web PIN that the Building Department emails on request.
Rather not deal with the building department?
Get a free quote →To find out whether a contractor is registered, call Community Development at 815-462-6490 during office hours. The remodeling guide also sets construction hours: 7 a.m. to 9 p.m. on weekdays and 8 a.m. to 9 p.m. on Saturdays and Sundays.
How to apply for a New Lenox building permit
Check the zoning map; uncolored areas are unincorporated Will County.
Open the miscellaneous, remodeling or new construction guide for your project.
Every contractor needs a current village registration before the permit is issued.
A signed application, plat of survey and the plans or specifications the guide lists.
Use BS&A Online for eligible permits; bring or mail the others to Community Development.
Online applicants hear within two business days whether the file can proceed.
A payment request follows plan approval; work starts only after payment and issue.
Review, corrections and what causes delay
Review only begins once the application is complete. For online filings, the status email says whether the file can continue, needs more information or is denied. The village estimates three to five working days for miscellaneous permits and seven to ten for remodeling permits; new construction depends on plan review, and each extra review round costs $35. If a BS&A address does not appear, email buildinginspections@newlenox.net to have it corrected before you continue.
Inspections in New Lenox
Inspections are booked with the Building Department at 815-462-6490, first come, first served. Building inspections need 48 hours’ notice and water meter and plumbing inspections 24 hours. The work must be ready: a failed inspection, including one where the project is not ready when the inspector arrives, is charged.
A new house moves through footing, foundation, foundation insulation, a sealed foundation survey before framing, sewer, water and sump lines, underground plumbing, basement floor, electric service (after which the village notifies ComEd), rough plumbing, rough building, insulation and energy code checks, and concrete flatwork before it is poured. A third-party blower door test must show no more than five air changes per hour, and a sealed final grade survey with spot elevations every 25 feet comes before the final plumbing, final building and final water meter inspections. The general contractor then applies for the certificate of occupancy. Fences need no inspection; generators need an underground and a final inspection.
Want this handled start to finish?
Get a free quote →Illinois building code in New Lenox
New Lenox enforces the 2018 International Codes, the 2017 National Electrical Code and the 2024 energy code with Illinois amendments, all with village amendments, plus the state plumbing and accessibility codes. FEMA’s Community Status Book lists the Village of New Lenox (community 170706) as participating in the National Flood Insurance Program, with flood maps effective February 15, 2019.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
New Lenox permit search and official resources
Permit files are public records requested from the Village Clerk’s Office, whose clerk is the village’s Freedom of Information officer. Use the online general request form, or print the FOIA form and mail it, deliver it to Village Hall or email it; records sent by email carry no photocopy fee. Requests are taken from 8:30 a.m. to 5 p.m. on weekdays.
- New construction and building renovations
- Online permitting (BS&A)
- Building permits and forms
- Miscellaneous permits guide
- Residential remodeling guide
- Residential new construction packet and fees
- Residential new construction inspections
- Contractor registration
- Adopted building codes
- Zoning
- Plan Commission / Zoning Board of Appeals
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →New Lenox building permit FAQs
How much is a fence or deck permit in New Lenox?
$75 each, as miscellaneous permits; fences need no inspection.
Do I need a permit for a patio?
No. Concrete and paver patios, private sidewalks and dog runs need no permit.
How is a remodeling permit priced?
$8 per $1,000 of the estimated cost, except roofs, underground sprinklers and window, door or siding jobs, which are $75.
Can I apply online?
Yes, for listed permit types such as roofs, fences, driveways, HVAC units and windows, through BS&A Online.
Can a homeowner do the work?
Yes, on your own primary residence, with a permit; contractors must be registered.
How much notice do inspections need?
48 hours for building inspections and 24 hours for plumbing and water meter inspections.
Can I pour a driveway in winter?
Not between December 1 and March 30; the village accepts bonds in lieu of the concrete until spring.
Simplify New Lenox permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in New Lenox sooner?
Let Alliance prepare, file, and track your New Lenox permits while your crew stays on the job.
More Illinois permitting guides
Will County
Read guide →Plainfield
Read guide →Romeoville
Read guide →Niles Building Permit Guide
Read guide →Normal Building Permit Guide
Read guide →Norridge Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about New Lenox permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.