Lawrence County’s government in Lawrenceville has no building, zoning or planning department, so the county publishes no building permit for houses, garages or barns on unincorporated land. The approvals that apply there come from the Lawrence County Health Department (2101 James Street, 618-943-3302), which issues $100 private sewage permits and processes well permits, and from the county Highway Department, which permits utility lines and field tile in county road rights-of-way. Lawrenceville, Bridgeport, Sumner, St. Francisville and Russellville are separate governments that set their own building rules.
What requires a permit in unincorporated Lawrence County?
The county’s department list covers ambulance and EMS, animal control, the circuit and county clerks, coroner, E911, emergency management, the health and highway departments, probation and court services, the sheriff, state’s attorney, supervisor of assessments and treasurer. None of them is a building, zoning or planning office, and the county’s website lists no building code or zoning ordinance. Rural construction still involves several permits:
Permits that apply
- A private sewage disposal system, new or renovated: Health Department plan review and permit
- A new, deepened, repaired or sealed water well: state well permit application through the Health Department
- Utility lines and agricultural field tile in a county highway right-of-way: Highway Department permit
- Loads over 8 tons on posted county highways from January 15 to April 15: only at times the County Engineer allows
- Heavy hauling on posted township roads: permission from the township road commissioner
Not published by the county
- A county building permit or building code
- County zoning permits, setbacks or a zoning board
- County electrical, plumbing or mechanical permits
- A county contractor license or registration
Before a large or unusual rural project, ask the county clerk’s office (618-943-2346) whether the county board has adopted any new land-use rule; the board meets on the third Wednesday of each month at 4 p.m.
What the county decides and what the state holds
With no county building code, Illinois law sets the minimums for commercial buildings and new homes in unincorporated Lawrence County, as the state note below explains. Septic systems follow the Illinois Private Sewage Disposal Licensing Act and Code, which the Health Department enforces locally, and wells follow the state water well rules on the Illinois Department of Public Health’s own permit form. Plumbing follows the Illinois Plumbing Code and plumbers are licensed by the state, as are roofing contractors.
Short on time to read all of this?
Get a free quote →Lawrence County building department: who handles permitting
For unincorporated land the offices a builder deals with are the Health Department for sewage and wells and the Highway Department for county roads. To tell whether a parcel is inside a city or village, look it up on the county’s GIS map site.
| Office | Contact |
|---|---|
| Lawrence County Health Department, Environmental Health (septic, wells) | 2101 James Street, Lawrenceville, IL 62439; 618-943-3302; Monday to Wednesday 7 a.m. to 4 p.m., Thursday 7 a.m. to 6 p.m., Friday 8 a.m. to 4 p.m.; Public Health Administrator Amy Marley |
| Lawrence County Highway Department (county roads, utility permits) | 2204 15th Street, Lawrenceville; 618-943-4215; Monday to Friday 8 a.m. to 4 p.m., closed noon to 1 p.m.; County Engineer Aaron Mefford |
| County Clerk (records, FOIA) | 1100 State Street, Lawrenceville; 618-943-2346 ext. 4 |
The county’s own Health Department page gives the department’s address as 11362 Country Club Road, while the department’s website and its septic application use 2101 James Street; call 618-943-3302 before visiting. The county seat, Lawrenceville (population 4,356), and Sumner (1,656), Bridgeport (1,652), St. Francisville (522) and Russellville (91) govern building inside their own limits. The City of Lawrenceville’s website sends building permit and zoning questions to City Hall at 618-943-2116; in the other towns, ask the city or village hall.
Lawrence County permit types
With no county building permit, the permit types on rural land are the health and highway approvals those offices list.
Residential permits
- Private sewage system: the Health Department’s plan review application (revised March 2, 2023) asks for the owner, contractor and license number, site location by township, range and section, whether the system is new or a renovation, bedrooms and residents, extras such as a garbage grinder, water softener, geothermal well or hot tub, the water supply, the soil investigation and the proposed design: septic tank, aerobic treatment plant, seepage field, chamber or gravelless system, seepage bed, stabilization pond, sand filter, drip irrigation or low-pressure piping.
- Lot diagram: the house and lot lines, the system and its dimensions, distances to water lines, wells (including neighbors’ wells near the line), storage tanks and buildings, soil test holes, curtain drains, the discharge point, elevations, and any sanitary sewer within 300 feet.
- Water well: the Illinois Department of Public Health’s application to construct, deepen, repair or seal a well, filed with the local health department.
- Houses, garages and sheds: no county building permit; the septic and well rules and any county road work still apply.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Non-residential septic systems use the same application with the number of employees and the design flow. Commercial buildings have no county building permit but fall under the statewide minimums, and food businesses need Health Department food permits. Utility companies placing lines in a county right-of-way need the Highway Department’s permit under its utility policy.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before construction
- Check the parcel: confirm on the GIS map whether the land is in a city or village.
- Soil investigation: a subsurface seepage system cannot be approved without a copy of the soil investigation results.
- Road access: ask the Highway Department about work in a county highway right-of-way, or the township road commissioner for a township road.
- Flood maps: FEMA has mapped flood areas in the county, with a current map dated July 18, 2011, even though the county is not in the flood insurance program.
Lawrence County permit costs
There is no county building permit fee to budget. The fees that do apply on rural sites come from the Health Department’s septic application and the Highway Department’s utility permit policy (approved January 16, 2019, revised April 9, 2019):
| Item | Fee |
|---|---|
| Private sewage disposal system permit | $100 |
| Utility permit, emergency or minor maintenance | No application fee |
| Utility permit, major maintenance | $75 |
| Single residential service installation | $75 |
| Agricultural field tile in the right-of-way | $50 |
| Modification or new construction (public or franchise utility) | $500 |
| Non-public utility | $500 plus usage fees |
| Pavement open-cut | $500 plus vehicle delay cost, each time |
Rather talk it over?
Call 1-855-478-4290 →The County Engineer may add a usage fee to modification or new construction permits, and any permit that involves cutting the pavement is charged at the open-cut rate whatever type of permit it is. The well permit form does not print a fee, so ask the Health Department for the current amount. Building fees inside Lawrenceville or a village are set by that municipality.
Trade permits and who may pull them
The county’s pages list no electrical, plumbing or mechanical permits and no contractor license or registration of its own. The trade rules that apply on rural land come from the state and the Health Department:
- Septic systems: work not done by the homeowner, who must own and occupy the residence, must be done by a licensed contractor, whose license number goes on the application. The contractor signs that the work will meet the Private Sewage Disposal Licensing Act and Code.
- Owner duties: the property owner signs too, accepts responsibility for notifying the Health Department before the system is backfilled, and takes responsibility for nuisances or health hazards from its use; the department does not guarantee trouble-free operation.
- Wells: the state application covers new wells, deepening, repair and sealing, with the well log attached when one exists.
- Plumbing and roofing: plumbers and roofing contractors hold state licenses.
Inside the cities and villages, any electrical, plumbing or contractor rules are each municipality’s own.
How to get permits for a rural Lawrence County project
Look up the parcel on the county GIS map; inside a city or village, ask that municipality.
Call the Highway Department (618-943-4215) about any work in a county right-of-way, or the township road commissioner.
Get the soil investigation done and note the depth of the limiting layer and soil type.
Send the completed application, lot diagram, soil results and $100 fee to the Health Department at 2101 James Street.
Submit the state well permit application through the Health Department.
Call the Health Department before the septic system is covered.
Rather not deal with the Lawrence County building department?
Get a free quote →Review, corrections and what causes delay
An application without soil investigation results cannot be approved for a subsurface system, and an incomplete lot diagram (missing well distances, elevations or the discharge point) holds up review. Applications must carry both the contractor’s and the owner’s signatures. Late-winter deliveries of heavy equipment are limited by the 8-ton posting on county highways from January 15 to April 15, unless the County Engineer allows heavier loads at set times.
Inspections in Lawrence County
Without a county building department there are no county building inspections or certificates of occupancy on unincorporated land. The inspections that happen are the Health Department’s: the owner must notify the department before a septic system is backfilled, and its environmental health staff carry out inspections and sanitary surveys and review subdivision plans and site suitability under the private water program. Work in a county right-of-way follows the Highway Department’s utility permit conditions.
Illinois building code in Lawrence County
Lawrence County has adopted no building code for unincorporated areas, so the statewide minimums apply there. FEMA’s Community Status Book lists Lawrence County (community 170409, unincorporated areas) among communities that do not participate in the National Flood Insurance Program, although FEMA has mapped flood hazards there since 1978 and its current flood map is dated July 18, 2011.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Permit search and official resources
Freedom of Information Act requests go to the FOIA officer, County Clerk Will C. Gibson, by email or by mail to the Lawrence County Clerk, 1100 State Street, Lawrenceville, IL 62439 (618-943-2346 ext. 4). Septic and well records are kept by the Health Department.
- Lawrence County, Illinois
- County departments
- Lawrence County Highway Department
- Utility permit policy and regulations
- Health Department (county page)
- Lawrence County Health Department, environmental health
- Private sewage disposal system application
- Water well permit application
- Lawrence County Board
- Lawrence County GIS map
- City of Lawrenceville FAQ (building permits and zoning)
- Lawrence County FOIA requests
- FEMA Community Status Book, Illinois
- Illinois building codes and regulations (Capital Development Board)
Lawrence County permit FAQs
Inspections are where schedules slip.
Get a free quote →Do I need a county building permit to build a house in rural Lawrence County?
The county has no building or zoning department and publishes no building permit. You still need the Health Department’s septic permit and a well permit if you drill a well.
How much is a septic permit?
$100, paid to the Lawrence County Health Department with the plan review application and soil investigation results.
Can I install my own septic system?
Only if you own and live in the home; otherwise a licensed contractor must do the work.
Who issues permits in Lawrenceville or Sumner?
Each city or village governs building inside its own limits. Lawrenceville directs building permit and zoning questions to City Hall at 618-943-2116; in Sumner and the villages, contact the city or village hall.
Is Lawrence County in the National Flood Insurance Program?
No. FEMA lists the county’s unincorporated area among communities that do not participate, although flood maps exist, dated July 18, 2011.
Do I need a permit to put a line or tile in a county road right-of-way?
Yes, from the Highway Department: $75 for a single residential service, $50 for agricultural field tile and $500 for new utility construction.
Simplify Lawrence County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lawrence County sooner?
Let Alliance prepare, file, and track your Lawrence County permits while your crew stays on the job.
More Illinois permitting guides
Crawford County
Read guide →LaSalle County
Read guide →Lake County
Read guide →Lee County Building Permit Guide
Read guide →Lincoln Building Permit Guide
Read guide →Lincolnwood Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Lawrence County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.