In unincorporated Lee County, building permits come from the Lee County Building and Zoning Office at the Old Courthouse, 112 E. Second Street in Dixon (815-288-3109). Applications are filed through the county’s online portal with a site plan and architectural plans; staff respond within one to three business days, and work may begin only after the approval letter and placard are issued. Fees follow Ordinance 2026-04-003: buildings are priced from 60% of the International Code Council valuation, fences and above-ground pools cost $50, and septic and well approvals from the Lee County Health Department come first.
What requires a permit in unincorporated Lee County?
The county’s permit page covers any construction on rural land, whether agricultural, private or commercial, and lists separate applications for the common project types. If you are unsure whether a project needs one, the office asks you to call 815-288-3109 first.
County permits
- New homes, additions and structural alterations, including basements
- Garages and other accessory buildings
- Commercial and industrial buildings and agricultural buildings
- Fences and swimming pools (separate applications)
- Portable sheds and shipping or cargo containers
- Non-commercial grain bins
- Residential and commercial solar, wind turbines and pipelines
- Signs, temporary uses, cell and meteorological towers
- Development in a floodplain or floodway
Approvals from other offices
- Septic systems and wells: Lee County Health Department, before the building permit
- Driveway access, 911 address sign and drainage permits: Lee County Highway Engineer
- Land evaluation (LESA) report for a new dwelling outside a platted subdivision: Soil and Water Conservation District
- Work in a state highway or township road right-of-way: the road authority for that road
The fee sheet sets a late fee of twice the cost of the building permit and a $150 agricultural building penalty fee. Development that violates the zoning classification is charged $500 plus petition costs. Structures for a municipality, school or the state or federal government need an application but pay no fee.
What the county decides and what the state holds
Lee County’s own building permit form states that, with no Lee County building code adopted, plans are reviewed under the most current BOCA or International Building Code and the National Electrical Code. The county sets its own zoning, setbacks, fees and contractor registration, and adopted new ordinances for commercial wind and solar facilities and energy storage on June 25, 2026, following Public Act 104-0458, and a Technology Overlay District on June 18, 2025. Energy code compliance follows the Illinois Energy Conservation Code, which the office asks applicants to review before filing; plumbing follows the state plumbing code, and plumbers and roofers hold state licenses.
Short on time to read all of this?
Get a free quote →Lee County building department: who handles permitting
The Building and Zoning Office regulates construction only in the unincorporated parts of the county. It keeps the zoning maps for those areas and serves as staff to the Lee County Zoning Board of Appeals and Planning Commission. Before filing, look up the parcel on the county GIS map: it shows the 12-digit property index number (PPN) and the zoning district, which the application requires and which differs from how the parcel is assessed.
| Office | Contact |
|---|---|
| Building and Zoning Office (building permits, contractor registration) | Old Courthouse, 112 E. Second Street, Dixon, IL 61021; permits 815-288-3109; zoning 815-288-3643; Building Official Joe Bay |
| Lee County Health Department, Environmental Health (septic, wells) | 309 S. Galena Avenue, Suite 100, Dixon; 815-284-3371; Monday to Friday 8 a.m. to 4:30 p.m. |
| Lee County Highway Engineer (driveways, 911 signs, drainage) | 1629 Lee Center Road, Amboy, IL 61310; 815-857-4141 |
| Lee County Soil and Water Conservation District (LESA reports) | 319 S. Mason, Amboy; 815-857-3623 ext. 110 |
The county seat, Dixon (population 14,582), is a separate city government, as are Amboy (2,206), Ashton (929), Franklin Grove (868), Paw Paw (798), Sublette (371), Compton (264), Steward (222), West Brooklyn (128), Nelson (127) and Harmon (116), plus the parts of Lee village and Rochelle that reach into the county. Permits inside those limits come from each city or village, not from the county office.
Lee County permit types
Every county permit starts in the online portal. A building permit (for any structure other than a fence or pool) needs three items: the application, a site plan and architectural plans. The plans can follow after submission, but the office says processing is faster when they are uploaded with the application. If you have no site plan, the county provides a blank one, and a help kiosk is available at the office if you call ahead.
Residential permits
- New homes and additions: platted survey, site plan showing front, side and rear setbacks and the driveway, plans with the total square footage of living area, basement and garage, and Health Department septic and well approval.
- Fences, pools and portable sheds: separate short applications with the county’s fence, pool or shed site plan attached, or the contractor’s plan.
- Residential solar: the building permit with the residential solar attachment, unless the plans already show that information.
- Setbacks: residential zoning needs 7 feet from side and rear lines and 25 feet from the front line; agricultural zoning needs 15 feet from side and rear lines and 60 feet from a township road centerline, 75 feet from a county highway centerline or 50 feet from a state highway right-of-way.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
A commercial building is any principal building other than a single-family home, a dwelling with two or fewer units, or an exempt farm building. Commercial applications need two sets of plans sealed by an Illinois architect or engineer, with a code declarations page, fire-rated assemblies, accessibility details, energy compliance (COMcheck or prescriptive), sprinkler drawings where used, and electrical and plumbing plans, plus a site plan with drainage, parking and flood elevations. Third-party plan review may be required. Commercial and industrial zones need 15-foot side and rear setbacks, with front setbacks of 25 feet (commercial) and 65 feet (industrial).
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Address: give the Zoning Office a platted survey with the driveway and dwelling located so it can assign an address.
- Road permits: with the address issued, get the driveway access, 911 sign and drainage permits from the Highway Engineer.
- Health approval: preliminary septic and well approval from the Health Department.
- LESA report: required before a permit for a dwelling or development on any parcel outside a platted subdivision.
- Floodplain: a county floodplain permit, an elevation survey and any state application come before the building permit, which is issued only if the project is allowable.
- Zoning relief: rezoning, variances and special uses go through the zoning portal and a public hearing.
Lee County permit fees
The county’s current fee sheet cites Ordinance 2026-04-003 and Resolution 2025-03-005; it replaces the per-square-foot rates printed in the January 2024 Development Manual. Building fees for floor area, basements, garages, accessory and commercial buildings are calculated from 60% of the applicable International Code Council building valuation, so the office computes the figure for each project. Fixed fees include:
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Minimum building permit fee | $50 |
| Fence | $50 |
| Pool, above ground / inground | $50 / $100 |
| Shipping container | $100 per container |
| Development permit or temporary permit | $50 |
| Non-commercial wind turbine or solar array | $10 per kilowatt (AC side) |
| Signs, non-illuminated | $50 to $250 by size |
| Signs, illuminated | $100 to $500 by size |
| Cell or meteorological tower | $25 per foot |
| Reissued permit (once only) | $50 plus the permit cost |
| Late fee | Twice the cost of the building permit |
| Zoning petition (rezoning, variance, special use) | $750 up to 10 acres, then $25 per acre |
| Preliminary plat / final plat | $750 / $500 up to 10 lots, then $25 per lot |
Fees are paid after the office contacts you, by credit card, cash or check, and are non-refundable. Health Department fees are separate: a full residential septic system permit costs $225 when a licensed contractor applies and $450 for a homeowner, a tank-only permit $125 or $250, and a potable well permit $175, including the inspection and water sample.
Trade permits and who may pull them
Lee County registers contractors through the same portal. Registration carries a $50 lifetime fee for every license type except roofing and plumbing, and contractors must keep their license and insurance dates current with the county or register and pay again. Registered contractors can keep adding files to their permits after submission. The county’s permit pages list no separate electrical, plumbing or mechanical permit: that work is shown on the building permit plans, and commercial plans must include electrical and plumbing drawings.
- Plumbing: done to the Illinois Plumbing Code by plumbers licensed by the state; commercial plumbing plans must show riser diagrams, backflow protection and fixture details.
- Roofing: roofing contractors hold the state roofing license.
- Septic systems: the Health Department’s application has a contractor license line, and a homeowner who applies pays double the contractor fee.
- Wells: the driller or homeowner files the well permit; the well construction report is due within 30 days, with a $10-a-day late fee.
Rules for electricians and other trades inside Dixon or a village are set by that municipality.
Rather not deal with the Lee County building department?
Get a free quote →How to apply for a Lee County building permit
Use the county GIS map to confirm the land is unincorporated and note its PPN and zoning district.
Get preliminary septic and well approval from the Health Department (3 to 5 working days for wells), then the address and the Highway Engineer’s driveway, 911 sign and drainage permits.
New dwellings outside a platted subdivision need the Soil and Water Conservation District’s report.
Register each contractor on the portal and pay the $50 lifetime fee where it applies.
Submit the application with the site plan and architectural plans; watch for the green notice and assigned permit number.
Pay when contacted within one to three business days; start work only after the approval letter and placard arrive.
Review, corrections and what causes delay
The portal will not let you submit until required items are complete and flags what is missing. A permit number is not an approval. Missing septic or well approvals, an unassigned address or a missing LESA report hold up residential permits; commercial plans may go to third-party review, and incomplete well applications may be returned. A permit is void one year after it is issued and may be reissued only once.
Inspections and occupancy in Lee County
For commercial work, any structure built after July 1, 2011 in the R-4, C-1, C-2, C-3, I-1, I-2 or I-3 zones, or built after that date and later converted to commercial use, needs a certificate of inspection signed by an inspector qualified under Public Act 96-704; call Building Official Joe Bay at 815-288-3109 to set up inspections. The applicant must also arrange the local fire department’s inspections, and the office tells you which department to contact. No commercial building may be occupied until the Zoning Office issues the letter of occupancy.
- Septic: the Health Department inspects every private sewage system it permits.
- Wells: after the construction report arrives, the department takes a water sample at no extra charge.
- Property sales: a septic and well evaluation on request costs $100, with the tank lids exposed.
Illinois building code in Lee County
Lee County’s permit form directs plan review under the most current BOCA or International Building Code and the National Electrical Code in the absence of a county building code. FEMA’s Community Status Book lists Lee County (community 170413, unincorporated areas) as participating in the National Flood Insurance Program since April 15, 1988, with its current flood map dated August 17, 2016; the county has no Community Rating System class.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Permit search and official resources
The county portal includes a payment search by address, permit number or parcel number. For copies of county records, send a Freedom of Information Act request by email (sao@countyoflee.org), fax (815-284-1604), mail or hand delivery to the State’s Attorney’s FOIA officer at 309 South Galena Avenue, Suite 300, Dixon; replies are due within five working days, the first 50 black-and-white pages are free and later pages cost 15 cents each.
- Lee County building permits
- Building and Zoning Office
- Building permit fees, Ordinance 2026-04-003
- Commercial building permit requirements
- Lee County Development Manual (January 2024)
- Zoning ordinances and 2026 energy ordinances
- Floodplain information and regulations
- Lee County GIS maps
- Lee County Highway Department
- Lee County Health Department, environmental health
- Septic application packet (2025)
- Well permit packet
- Lee County FOIA requests
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Lee County permit FAQs
Does Lee County issue building permits in Dixon or Amboy?
No. The Building and Zoning Office covers unincorporated land only; cities and villages issue permits inside their own limits.
How much does a Lee County building permit cost?
Buildings are priced from 60% of the International Code Council valuation, with a $50 minimum; fences and above-ground pools are $50 and inground pools $100.
Can I start work once I get a permit number?
No. Only the placard and a letter stating “approved” allow the project to begin; the submission notice and number do not.
Do contractors have to register with the county?
Yes, through the county portal, with a $50 lifetime fee for all license types except roofing and plumbing, kept current with license and insurance dates.
What do I need before a permit for a new house?
An address from the Zoning Office, the Highway Engineer’s driveway, 911 sign and drainage permits, Health Department septic and well approval, and a LESA report if the parcel is not in a platted subdivision.
How much is a septic permit in Lee County?
A full residential system costs $225 when a licensed contractor applies and $450 when a homeowner applies; non-residential systems cost $325 or $650.
How long is a permit valid?
One year from issue; it can be reissued once for $50 plus the permit cost.
Simplify Lee County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lee County sooner?
Let Alliance prepare, file, and track your Lee County permits while your crew stays on the job.
More Illinois permitting guides
Ogle County
Read guide →Bureau County
Read guide →Whiteside County
Read guide →Lincoln Building Permit Guide
Read guide →Lincolnwood Building Permit Guide
Read guide →Lisle Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Lee County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.