Building permits in Jacksonville are issued by the city’s Community Development Department, 200 West Douglas Avenue (217-479-4620), which also runs zoning, flood hazard, subdivision and property maintenance rules and carries out building, electrical, plumbing and fire prevention inspections. Many residential permits carry a flat fee, $15 for a re-roof, siding, a fence, a deck or a shed over 150 square feet, while garages and commercial work are priced on valuation. Permits expire 180 days after they are issued.
What requires a building permit in Jacksonville?
The city’s rule is that new buildings, additions and major renovations need a building permit before work begins, and that any electrical or plumbing work also needs a permit. The department’s list of work that requires a permit includes:
Exterior and accessory work
- Roofing of any existing structure
- New or replacement siding
- Fences
- In-ground and above-ground swimming pools
- Accessory structures, including sheds over 150 square feet
- Garages and carports, attached or detached
- Porches and decks, covered or uncovered
- Signs under the city’s sign ordinance
Structural, trade and site work
- All structural alterations
- Demolition
- Changes to an electrical system, including service upgrades, over $500 in labor and materials
- Plumbing fixtures, water and sewer services
- Solar panel systems, residential or commercial
- Asbestos abatement
- Any development in a flood hazard area
The department’s own explanation is practical: work done without permits and inspections may not be covered by property insurers and can reduce the value of the building if it does not meet the adopted codes.
What Jacksonville decides and what the state holds
The city adopts its own codes and ordinances: its zoning ordinance (No. 1765), subdivision ordinance (No. 1350), electrical ordinance (No. 88-0-5), historic preservation ordinance and solar energy ordinance, plus the model codes listed in the code section below. The state pieces it lists alongside them are the Illinois State Plumbing Code, the Illinois Accessibility Code (71 Ill. Adm. Code 400) and the Illinois Architecture Practice Act. Plumbing, electrical, asbestos abatement and roofing all need a state or municipal license, as the department notes on its permit page.
Jacksonville building department: who handles permitting
The Community Development Department, directed by Brian Nyberg, issues building, electrical and plumbing permits and inspects the work. Anyone planning to build, develop or relocate in the city is asked to contact it during the initial planning stage, so that the preliminary requirements are met and the rest of the development process runs smoothly. Its duties include zoning administration, annexation, special flood hazard regulations, subdivision regulations, property maintenance and fire prevention inspection, and it supports the Historic Preservation District, the Enterprise Zone and the downtown TIF district. The City Clerk’s office sends anyone asking about building or inspection permits to this department.
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| Community Development Department | 200 West Douglas Avenue, Jacksonville, IL 62650; 217-479-4620 |
| Office hours | Monday to Friday, 8 a.m. to 4:30 p.m. |
| Inspection requests | 217-479-4620; inspections 8:30 a.m. to 3 p.m. weekdays |
| City Hall main line | 217-479-4600 |
| Plan Commission & Zoning Board of Appeals | Petitions filed with the Inspections Department by the posted due date |
The department’s staff includes building, electrical and plumbing inspectors, a fire inspector and property maintenance inspectors. Morgan County’s GIS office maintains the mapping behind the city’s zoning and permitting software.
Jacksonville permit types
Applications are paper forms posted on the department’s residential and commercial pages; completed forms can be brought to the office or e-mailed to the department’s office supervisor at the address on those pages.
Residential permits
- Building application. Used for remodels, garages, carports, porches, decks, accessory structures over 150 square feet and roofs. It asks for the owner, the general contractor and license number, the architect or engineer, the electrical, plumbing and roofing contractors, setbacks, floor areas, a cost breakdown and a site plan for plan review.
- Separate forms for fences, pools, electrical work, plumbing work, solar systems and demolition.
- Construction details. The building application’s detail sheet lists the minimums the department checks: R-49 attic insulation, R-20 walls, R-19 floors, footings at least 36 inches deep, anchor bolts at 6 feet on center, smoke detectors in and outside every bedroom and on each level, egress windows with at least 5.7 square feet of openable area, risers no higher than 7¾ inches and treads at least 10 inches deep.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects use the same building application with the electrical, plumbing and solar forms, plus a utility right-of-way application (updated March 2026) for work in city rights-of-way and the demolition application and procedures for taking down a commercial building. Commercial plumbing permits add a valuation-based charge, and commercial garages and solar systems are priced on valuation.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning. The building application is also a zoning permit, valid for six months; work must start and continue diligently, and an extension must be requested in writing at least 14 days before it expires.
- Plan Commission and Zoning Board of Appeals. Rezoning ($100), variances ($50) and site plan approval ($100) go to the monthly meeting; for example, papers due December 16, 2026 are heard on January 6, 2027.
- Flood hazard areas. A city permit to develop in a flood hazard area ($50), the IDNR joint permit application where the state has jurisdiction, and FEMA elevation or floodproofing certificates.
- Historic district. Projects in the Historic Preservation District go through the Historic Preservation Commission.
- Owner consent. When the applicant is not the owner, the form requires an affidavit signed by the owner and the contractor.
Jacksonville permit fees
Most residential permits carry the flat fees printed on the department’s permits and licenses page. Work priced “on valuation” (garages, commercial plumbing, commercial electrical and commercial solar) is charged on the project’s valuation, and the rate is not printed on the permits page, so ask the department for the figure before you file.
| Item | Fee |
|---|---|
| Roofing an existing structure / new or replacement siding | $15 / $15 |
| Swimming pool, in-ground / above-ground | $30 / $15 |
| Accessory structure or shed over 150 sq ft | $15 |
| Fence / sign / carport / porch or deck | $15 each |
| Demolition | $20 |
| Plumbing | $5 per fixture, $10 per water or sewer service, $15 work permit (valuation added for commercial) |
| Residential solar hook-up | $40 |
| Development in a flood hazard area | $50 |
| Asbestos abatement | $0.003 × valuation |
| Garage, commercial electrical and commercial solar | Based on valuation |
| Rezoning / variance / site plan approval | $100 / $50 / $100 |
Rather talk it over?
Call 1-855-478-4290 →The plumbing line is built from parts: a charge for each fixture installed, replaced or repaired, a charge for each water or sewer service, and a work permit charge; the plumbing application counts fixtures by type (tubs and showers, sinks, lavatories, water closets, water heaters, floor drains, dishwashers, disposals, washing machines, cross-connection devices and grease interceptors), so list every one. Electrical changes need a permit once the labor and materials exceed $500. The building application also asks for a cost breakdown (electrical, plumbing, heating and air conditioning, other systems and all other costs), which is the starting point for any valuation-based fee.
Trade permits and who may pull them in Jacksonville
Electrical. Chapter 6, Section 6-97 of the city code requires electrical work in Jacksonville to be done by a contractor registered with the city. To register, an electrical contractor must have five years of experience, pass an examination and be bonded. The one exception is a homeowner doing their own electrical work on a single-family house they will live in for at least a year after the work is finished. The electrical application needs both the applicant’s and the license holder’s signatures for a contractor permit, or the owner’s signature for a homeowner permit.
Plumbing. The plumbing application asks for the plumber’s Illinois license number and plumbing contractor registration number and the number of fixtures, water services and sewer services. Its notice to homeowners says owners may do their own plumbing in a single-family residence if they have the knowledge and will live there at least six months after the work is complete; if the owner hires the work out, a licensed and registered plumbing contractor must install it.
Roofing and general contractors. The building application records the roofing contractor’s license number and the general contractor’s license number, and the department lists roofing and asbestos abatement among the trades that need a state or municipal license.
How to apply for a building permit in Jacksonville
Call 217-479-4620 to confirm zoning, setbacks and whether the site is in a flood hazard area or the historic district.
File any rezoning, variance or site plan petition by the due date for the monthly meeting.
Complete every section, including setbacks, cost breakdown and construction details, and attach a site plan.
Submit the electrical and plumbing applications the building form says are required.
Bring the forms to 200 West Douglas Avenue or e-mail them, and pay the permit fee the department sets.
Permits expire 180 days after issue; call for each inspection as the work reaches it.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The building application says it is for plan review, so a missing site plan, blank setbacks or an incomplete construction detail sheet will hold it up. Projects that need a rezoning, variance or site plan approval wait for the monthly meeting, and flood hazard sites may also need state approval through the IDNR joint application. A zoning permit lapses after six months unless work has begun and continues.
Inspections in Jacksonville
Inspections are made between 8:30 a.m. and 3 p.m., Monday to Friday. Call 217-479-4620 a day, or at least a couple of hours, before you need one so an inspector can plan a stop. The department’s inspection tables set out the stages:
- Plumbing: underground plumbing before concrete or backfill, then rough-in before drywall; commercial jobs add a final when the system is operational, and flushing of underground piping must be witnessed.
- Building: footing forms and foundation forms before concrete is poured, the foundation once waterproofed with drain tile and gravel in place before backfill, concrete floors once the base, reinforcing and vapor barrier are ready, framing before drywall (one inspection per floor, after the electrical and plumbing rough-ins pass), and a final.
- Electrical: the service once the meter socket, disconnect and main panel are in, and rough-in before insulation or drywall; commercial jobs add underground electrical and a final.
- Periodic progress inspections between the scheduled stages, mainly on large commercial and industrial buildings.
For commercial buildings, all fire stopping must be installed before the framing inspection, and a structural final follows when all work is complete. Fire prevention inspection is also part of the department’s job: a fire inspector works alongside the building inspectors, and the city enforces the 2021 International Fire Code and the 2021 Life Safety Code on the buildings they cover.
Codes adopted by the City of Jacksonville
The department’s list of codes adopted and enforced names the 2021 International Building, Residential, Mechanical, Fire and Property Maintenance Codes, the 2024 National Electrical Code (NFPA 70), the 2021 Life Safety Code (NFPA 101), the 2014 Illinois State Plumbing Code and the current International Energy Conservation Code, along with the city’s zoning, subdivision, electrical, historic preservation, floodplain, dog kennel and solar energy ordinances. The city’s Code of Ordinances is published on Municode.
Want this handled start to finish?
Get a free quote →FEMA’s Community Status Book lists the City of Jacksonville (community 170516, Morgan County) as a participating community in the National Flood Insurance Program, in the regular program since June 15, 1979, with a current flood map dated August 18, 2009. The department’s flood page posts Flood Ordinance No. 2009-O-14, while its code list still names Floodplain Development Ordinance No. 94-0-24; ask which applies to your site.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Jacksonville building permit FAQs
Do I need a permit to replace my roof in Jacksonville?
Yes. Roofing any existing structure needs a permit, which costs $15.
Do I need a permit for a shed?
Yes for accessory structures, including sheds, over 150 square feet; the permit is $15.
Can I do my own electrical work?
Only on a single-family house you will live in for at least a year after the work; otherwise a city-registered electrical contractor must do it.
Can I do my own plumbing?
The city’s plumbing form allows homeowners to plumb their own single-family residence if they will live there at least six months afterward.
Do I need a permit for a fence?
Yes. Fences take a $15 permit on the city’s fence application.
How long is a permit good for?
Building permits expire 180 days after they are issued, and the zoning permit lapses after six months unless work has begun.
When are inspections done?
Between 8:30 a.m. and 3 p.m. on weekdays; call 217-479-4620 a day ahead if you can.
How much is a variance?
$50 to apply; a rezoning or a site plan approval costs $100.
Do solar panels need a permit?
Yes. A residential solar hook-up permit is $40 and uses the city’s solar application; commercial solar systems are priced on valuation and follow the solar energy ordinance.
Jacksonville permit records and official resources
The department posts a monthly list of permits issued. Other permit or inspection records can be requested from the city through its online FOIA request portal; the City Clerk publishes the city’s FOIA policy and yearly logs of requests.
Inspections are where schedules slip.
Get a free quote →- Community Development Department
- Permits and licenses required, with fees
- Residential applications and inspections
- Commercial applications and inspections
- Codes adopted and enforced
- Rezoning, variance and site plan filing dates
- Flood zone permits and forms
- Community Development staff directory
- Boards and commissions
- City Clerk, FOIA policy and request portal
- FEMA Community Status Book, Illinois
Simplify Jacksonville permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Jacksonville sooner?
Let Alliance prepare, file, and track your Jacksonville permits while your crew stays on the job.
More Illinois permitting guides
Morgan County
Read guide →Cass County
Read guide →Sangamon County
Read guide →Jefferson County Building Permit Guide
Read guide →Jersey County Building Permit Guide
Read guide →Jo Daviess County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Jacksonville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.