Inside the Village of Huntley, building permits are issued by the Development Services Department, whose Building & Code Enforcement Division reviews plans and inspects building, electrical, plumbing and mechanical work. Applications, documents and payments go through the village’s eSuite Permit Portal. The fee schedule that took effect January 1, 2026 charges $1.56 per square foot for a new house, $103 for a wood deck and $57 for a fence, and every general or primary contractor on a permit must be registered with the village.
What requires a building permit in Huntley?
The village’s rule is simple: making additions, improvements or alterations to a home or property requires a permit. Its building page lists the projects residents ask about most, and the 2026 fee schedule shows the full range of permit types, from window wells and skylights to elevators and warehouse racking.
Permit needed
- Basement, kitchen and bathroom remodels
- Decks, fences, sheds and detached garages
- Driveways, driveway ribbons, patios and sidewalks
- Electrical installations and service upgrades
- Furnaces, air conditioners and water heaters
- Fire pits and outdoor fireplaces
- Pools, hot tubs, pool heaters and pool removal
- Sunrooms, three-season rooms and lawn irrigation
No permit
- Store-bought pergola, gazebo or pavilion kits (unless wired)
- Residential security alarms
- Residential cable installs and low-voltage alterations
A roofed or enclosed deck is treated as an addition to the house and must meet every code that applies to one. A stick-built pergola or gazebo needs an $83 permit, and adding electrical work to a shed, deck, pergola or gazebo adds $57. Work in the public right-of-way, such as a new driveway apron, also needs a cash bond.
What Huntley decides and what the state holds
Huntley adopts its own codes in Chapter 150 of the village code. Since January 1, 2026 it enforces the 2024 International Building, Residential, Existing Building, Mechanical, Fuel Gas, Fire, Property Maintenance, Swimming Pool and Spa and Plumbing codes and the 2023 National Electrical Code, with local amendments, along with the current Illinois Accessibility Code, Illinois Elevator Safety Code, Illinois Energy Conservation Code and Illinois Plumbing Code. Village rules decide who may work on a house: since January 1, 2023 a homeowner must hire a licensed electrician to install a new electrical service, a swimming pool or a hot tub. Plumbing licenses are state licenses, and the village’s permit FAQ, citing the state plumbing law, sets an occupancy rule for homeowners who do their own plumbing.
Short on time to read all of this?
Get a free quote →Huntley building department: who handles permitting
Development Services is responsible for plan review, permits, inspections and code enforcement in the village. Its Building & Code Enforcement Division works with the Planning & Zoning Division, Public Works and Engineering and the Huntley Fire Protection District, which reviews sprinkler and alarm plans under its own fee schedule. Huntley straddles the Kane and McHenry county line; the parcel owner records in the portal come from whichever county the lot is in, but the village issues the permit either way.
| Detail | Information |
|---|---|
| Office | Development Services, Municipal Complex, 10987 Main Street, Huntley, IL 60142 |
| Phone | 847-515-5252 (permits and inspections); 847-515-5249 (backflow testing) |
| inspections@huntley.il.us | |
| Hours | Weekdays, 8:00 a.m. to 5:00 p.m. |
| Portal | eSuite Permit Portal (applications, uploads, deposits and fees) |
Huntley permit types
Permit names in the portal begin with “Res” or “Com”. A permit type cannot be changed once chosen, so an application filed under the wrong type has to be deleted and filed again. Separate jobs by different contractors, such as a patio and the hot tub wiring on it, are separate permits.
Residential permits
- What to upload. The residential application, the general or primary contractor’s quote, licenses for subcontractors such as roofers, plumbers and electricians, a plat of survey with dimensions for outdoor work, plans or product cut sheets and, for exterior work in most subdivisions, a homeowners’ association approval letter.
- Remodels. Kitchens, bathrooms and basements are priced as minor, intermediate or major depending on how much plumbing and electrical work is involved; the Chief Building Official makes the final classification.
- New homes. A separate new-construction residential application applies, with a non-refundable $2,500 plan review deposit.
- Tenants. A renter may file online, but the application must be signed by the owner or include the owner’s written permission.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects use the commercial application, and new buildings and tenant build-outs pay a plan review deposit before review starts: $2,500 for new commercial construction and $258 for a remodel. Fire sprinkler and alarm systems use the village’s fire protection permit application, and the Huntley Fire Protection District reviews their plans. New businesses must also register with the village and pass inspections by the building, fire and planning staff before the registration certificate is issued.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning. The Planning & Zoning Division prepares recommendations to the Plan Commission and Zoning Board of Appeals on subdivisions, special uses and variations.
- Engineering. Site engineering review and inspection cost 1.5% of the approved engineer’s opinion of probable cost.
- Right-of-way bonds. A driveway approach needs a bond of at least $744 and sidewalk or parkway work at least $375 per lot.
- Water, sewer and impact fees. A 1-inch tap costs $5,828 for water and $6,002 for sewer in 2026, and a home with fire sprinklers needs at least a 1-1/2-inch tap. Impact fees on the village’s 2022 sheet total $8,806.40 for a three-bedroom detached house.
Huntley permit costs and fees
The Village of Huntley Building Permit Fee Schedule took effect January 1, 2026 and rises every January 1 by the consumer price index used for property tax extensions, or by at least 2%. Square-foot fees are measured from the outer perimeter of the structure and include every story, basement and mezzanine.
| Work | Fee |
|---|---|
| New house or multi-family building (incl. trades and plan review) | $1.56 per sq ft, plus a $2,500 non-refundable plan review deposit |
| Residential remodel, repair or restoration | $0.52 per sq ft, $103 minimum, plus trade and plan review fees |
| Kitchen remodel: minor / intermediate / major | $181 / $361 / $721 |
| Basement: minor / intermediate / major | $412 / $772 / $1,029 |
| Wood deck | $103, plus $57 if electrical work is added |
| Fence or dog run | $57 |
| Shed / detached garage | $83 / $155 |
| Driveway, patio or sidewalk | $52 each |
| Furnace or air conditioner / both | $52 / $88 |
| Water heater | $57 |
| Residential solar / generator | $258 / $129 |
| Above-ground / in-ground pool | $129 / $258 |
| Re-inspection | $155 per inspection, per discipline |
| Certificate of occupancy | $155 per unit |
Rather talk it over?
Call 1-855-478-4290 →Worked example: a new wood deck with a lighting circuit pays the $103 deck fee plus $57 for the added electrical work, a $160 permit. The deck still needs post-hole, rough framing and final inspections.
Permits are valid for six months, and the Chief Building Official may extend one where work is progressing; otherwise a six-month extension costs 25% of the original fee. Refunds must be requested in writing within 30 days of issuance and before any inspection, are limited to 75% of the fee above $150, and never include plan review fees or deposits. Starting work without a permit adds a penalty of at least $100 or 100% of the permit fee, plus a $515 after-the-fact inspection fee.
Fire protection is billed twice. The village charges a sprinkler permit of $129 plus 77 cents per head and $258 for a new fire alarm system, and Appendix A adds the Huntley Fire Protection District’s plan review: $170 for a residential (NFPA 13D) sprinkler system of up to 20 heads and $175 for a fire alarm system of up to 20 devices. Where the village or the fire district sends plans to an outside reviewer, the applicant pays the reviewer’s invoice plus 10%.
Trade permits and who may pull them
Every general or primary contractor named on a Huntley permit must be registered with the village. Registration runs for the calendar year and expires December 31; the registration page states a $100 fee, and the 2026 fee schedule lists $103. The contractor files a certificate of insurance naming the village as certificate holder with a general aggregate of at least $600,000, and work in the public right-of-way or an easement needs a $10,000 surety bond for the year. The primary contractor supplies copies of the licenses of plumbers, electricians, roofers, irrigation installers and security and fire protection companies working under it. Plumbers provide both their 055 and 058 licenses and a notarized or corporate-sealed letter of intent for each project.
Homeowners may do their own work under the residential code by choosing “Homeowner/Property Owner” as the contractor type, with two limits: a licensed electrician must install any new electrical service, pool or hot tub, and, as the village’s FAQ puts it under the state plumbing law, a homeowner doing plumbing must occupy the house for at least six months and file a notarized letter of intent. On commercial property all electrical, plumbing and roofing work must be done by licensed contractors.
Rather not deal with the building department?
Get a free quote →How to apply for a Huntley building permit
The general or primary contractor registers with the village and keeps insurance and licenses current in the portal.
Choose the Res or Com permit that matches the job; call 847-515-5252 if unsure.
Add the application, quote, licenses, plat of survey, plans and HOA letter in the eSuite portal.
New homes and build-outs pay the plan review deposit only after staff email the instruction.
Upload a full revised plan set and a response letter, then call or email that it is ready.
Pay online or at Village Hall, then post the emailed permit card on site before work begins.
Review, corrections and what causes delay
Submittals with missing items delay processing. The village emails the applicant when a review is complete; if the general contractor’s registration or a subcontractor license is still missing, the permit waits until it arrives. Paying before staff ask is discouraged, because some fees are calculated by hand and early payments can be wrong. Each resubmittal must include a complete set of revised plans, not only the changed sheets, with file names that include the property address. An address must already be assigned to the parcel before the portal accepts an application.
Inspections and certificates in Huntley
Schedule inspections by calling 847-515-5252 with the permit number. Calls must come in by 2:00 p.m. for an inspection the next business day; the village does not do same-day inspections and will not book a rough and a final for the same day. Driveways, patios and sidewalks get a base inspection and a final. Fences, decks and pergolas get a post-hole inspection and a final, and decks also need a rough framing inspection before the floor boards go down. Furnaces, air conditioners and water heaters need a final inspection only.
A failed inspection costs $155 per discipline to repeat. A new building needs a certificate of occupancy ($155 per unit), and a temporary certificate for a home costs $309. Construction within 1,000 feet of a home is limited to 7:00 a.m. to 8:00 p.m. on weekdays, 8:00 a.m. to 7:00 p.m. on Saturdays and 10:00 a.m. to 7:00 p.m. on Sundays and holidays. Lawn irrigation and fire sprinkler backflow devices must be tested every year; the village charges $70 or $90, or any registered Illinois cross-connection inspector may do it. Commercial elevators, lifts and dumbwaiters are inspected once a year by the village’s elevator inspection contractor, at $103 per unit for the annual compliance inspection.
Illinois building code in Huntley
Huntley enforces the 2024 International codes and Illinois state codes adopted with effect from January 1, 2026. FEMA’s Community Status Book lists the Village of Huntley (community 170480) as participating in the National Flood Insurance Program, with current flood maps dated June 2, 2015, and as a Community Rating System class 7 community, with a 15% flood insurance premium discount.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Huntley building permit FAQs
How much is a building permit in Huntley?
It depends on the job: $52 for a driveway or patio, $57 for a fence, $103 for a deck and $1.56 per square foot for a new house. Fees rise each January.
Do I need a permit for a shed or pergola?
Yes for a shed ($83) and for a pergola built on site ($83). A store-bought pergola or gazebo kit needs no permit unless electrical work is added.
Can I do my own electrical work in Huntley?
Homeowners may do some work themselves, but since January 1, 2023 a licensed electrician must install a new electrical service, a swimming pool or a hot tub.
How do I schedule an inspection?
Call 847-515-5252 by 2:00 p.m. for the next business day. Same-day inspections are not offered.
How long is a Huntley permit valid?
Six months from issuance. The Chief Building Official may extend a permit where work is progressing; otherwise an extension costs 25% of the original fee.
Does my contractor need to register?
Yes. The general or primary contractor registers each calendar year, carries at least $600,000 in general aggregate insurance and supplies its subcontractors’ licenses.
Can I get a refund if I cancel the project?
Only if you ask in writing within 30 days of issuance and no inspection has been made; the refund is limited to 75% of the fee above $150.
Huntley permit search and official resources
Applicants follow their applications and fees in the eSuite portal, and the Building Division compiles new building permit reports every month. Copies of permits, plans or inspection records are requested under the Freedom of Information Act: requests must be in writing, on the village’s online or printable FOIA form, and go to the FOIA Officer in the Village Clerk’s Office.
Inspections are where schedules slip.
Get a free quote →- Huntley Building & Code Enforcement
- Development Services Department
- Building codes effective January 1, 2026
- 2026 building permit fee schedule
- Online permit information
- E-permits FAQ
- eSuite Permit Portal
- Business and contractor registration
- 2026 water and sewer tap-on fees
- Residential impact fees
- Village Clerk and FOIA requests
Simplify Huntley permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Huntley sooner?
Let Alliance prepare, file, and track your Huntley permits while your crew stays on the job.
More Illinois permitting guides
McHenry County
Read guide →Lake in the Hills
Read guide →McHenry
Read guide →Iroquois County Building Permit Guide
Read guide →Jackson County Building Permit Guide
Read guide →Jacksonville Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Huntley permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.