Skip to main content
Municipal GuideIllinoisLake in the Hills · McHenry County

Lake in the Hills, Illinois Building Permit Guide

To get a building permit in Lake in the Hills, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Lake in the Hills’ Community Development Department issues building permits for the village from Village Hall, 600 Harvest Gate, and every contractor working there must hold a village contractor’s license.

Authority: Community Development DepartmentFiling: E-mail, drop box or Village HallPhone: 847-960-7400
Authority
Community Development600 Harvest Gate
Contractor license
$75 a yearJanuary 1 to December 31
Online permits
A/C, furnace, roof, sidingWater heaters and softeners
Plumbing inspections
Mon, Tue, ThuNoon to 4 p.m.

Building permits in the Village of Lake in the Hills are issued by its Community Development Department at Village Hall, 600 Harvest Gate (847-960-7400). Zoning and building code compliance are both reviewed before a permit is issued. You can bring the application to Village Hall, e-mail it as PDFs to cd@lith.org or leave it in the drop box at the Village Hall parking lot entrance, and permits for air conditioners, furnaces, roofing and siding, water heaters and water softeners can be filed online. Contractors must hold a village contractor’s license, $75 for the calendar year.

What requires a building permit in Lake in the Hills?

The village requires permits for construction of any type, including residential and commercial new construction. Its permit page walks through how to tell whether a project needs one, and if you are still unsure, call Village Hall at 847-960-7400. The kinds of work the village names directly:

Named on village pages

  • Residential and commercial new construction
  • Air conditioner and furnace installation
  • Roofing and siding
  • Water heaters and water softeners
  • Plumbing work, with its own inspection hours
  • Any work that needs a building permit under Chapter 24 of the village building code (which also triggers contractor licensing)

Checked with every permit

  • Zoning: setbacks, clearances and other zoning-code rules
  • Building code compliance
  • Other relevant village ordinances
  • Village contractor licensing (homeowners may do many projects themselves)

Village handouts set out the procedure for many common permit types; ask for the one that matches your project at Village Hall.

Homeowners associations

The village asks homeowners to get their association’s approval, but its own decision rests only on the codes and zoning: village approval is not contingent on HOA rules or approvals. An HOA sign-off therefore does not replace the village permit.

What Lake in the Hills decides and what the state holds

The village sets its own building code (Chapter 24), contractor licensing (Chapter 38, Building Contractor Licensing) and fees (Appendix B, Comprehensive Fine & Fee Schedule, of the municipal code), and it has a Planning and Zoning Commission staffed by Community Development. The state licenses plumbers (the 055 and 058 licenses the village asks plumbing contractors to show), roofing contractors and fire sprinkler contractors, and its Home Repair and Remodeling Act sets consumer paperwork rules for contractors doing home repairs. The Illinois Plumbing Code and the state energy and accessibility codes also apply.

Short on time to read all of this?

Get a free quote →

Lake in the Hills building department: who handles permitting

The Village of Lake in the Hills, through its Community Development Department, issues building permits and monitors every phase of construction and development in the village. The same department runs code enforcement, planning and zoning, economic development, contractor licensing and business registrations, and it provides staff support to the Planning and Zoning Commission. Unincorporated land nearby is permitted by McHenry County’s Building Division.

Lake in the Hills permit contacts
DetailInformation
OfficeCommunity Development Department, Village Hall, 600 Harvest Gate, Lake in the Hills, IL
PhoneVillage Hall, 847-960-7400 (permit questions and the licensed-contractor list)
E-mail submittalscd@lith.org (PDF attachments only, not photos of documents)
Drop boxAt the entrance to the Village Hall parking lot, 600 Harvest Gate
OnlinePublic Portal for selected permits and contractor licenses; ePay for license fees

Lake in the Hills permit types

Most permits start with the village’s building permit application and the project handout for the type of work, filed at Village Hall, by e-mail or through the drop box. A short list of routine jobs can be filed online through the Public Portal instead.

Residential permits

  • Online permits. Air conditioner, furnace, roofing or siding, water heater and water softener permits can be applied for through the Public Portal.
  • Paper or e-mailed permits. Other residential projects use the application and the matching handout; attach the documentation the handout lists.
  • Owner-built projects. Homeowners may do many of their own construction projects, and the village has separate guidance for homeowners who do their own plumbing.
  • Zoning first. Check setbacks, clearances and other rules in the zoning code before you draw the project, since zoning is reviewed together with the building code.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial new construction and alterations go through the same Community Development review of zoning and building code compliance. The same department handles business registrations and staffs the Planning and Zoning Commission. Every contractor on a commercial job needs a village contractor’s license or, for state-licensed trades, a copy of the state license on file.

What comes before the building permit

  • Zoning compliance under the zoning code, reviewed before any permit is issued.
  • HOA approval, which the village encourages but does not require for its own decision.
  • Contractor licensing, which must be complete before a contractor works in the village.
  • Unincorporated parcels, which go to McHenry County instead.

Lake in the Hills permit costs and fees

Building permit fees are assessed after the application is approved, using Appendix B, the Comprehensive Fine & Fee Schedule of the Lake in the Hills municipal code. The village’s permit page does not print the amounts; once your permit is approved, the village notifies you of the permit cost together with its conditions, the required inspections and how to pay. The fees the village does state:

Lake in the Hills fees stated on village pages
ItemFee
Building permitAssessed on approval under Appendix B, Comprehensive Fine & Fee Schedule
Contractor’s license$75, valid January 1 to December 31
Roofing, plumbing and sprinkler contractorsNo $75 fee; copy of the state license only
Online card payment (ePay)2.35% convenience fee
Contractor surety bond$10,000 surety bond required
Contractor insuranceAt least $1,000,000 general liability, each occurrence, products and completed operations

Rather talk it over?

Call 1-855-478-4290 →

To pay a contractor’s license fee online you need the license confirmation number, which starts with an L followed by six digits; an application stays incomplete until the fee is paid.

Trade permits and who may pull them

Lake in the Hills licenses contractors itself under Municipal Code Chapter 38. Any person or business doing work that needs a building permit under Chapter 24 of the building code must hold a village contractor’s license, applied for through the Public Portal. What each trade files:

Contractor license requirements in Lake in the Hills
ContractorWhat to file
General and other contractorsOnline application, $75 fee, certificate of insurance ($1,000,000 minimum, village as certificate holder), $10,000 surety bond with a hold-harmless statement (Chapter 38.02), and a Certificate of Good Standing from the Secretary of State for corporations and LLCs (a screenshot of the ilsos.gov record is accepted)
ElectricalA current electrical license plus the insurance certificate, surety bond and proof of good standing
PlumbingCopies of the state 055 and 058 licenses; no insurance certificate, bond or fee
Roofing and fire sprinklerA copy of the State of Illinois license; no insurance certificate, bond or fee

The village keeps a list of licensed contractors that changes almost daily; call Village Hall at 847-960-7400 before you hire to confirm a contractor is on it. Homeowners may do many of their own projects, including plumbing under the village’s homeowner plumbing guidance. Contractors doing home repairs must also give customers the Consumer Rights Brochure required by the Illinois Home Repair and Remodeling Act, and for contracts over $1,000 an acknowledgment form signed by the homeowner and the contractor.

Rather not deal with the building department?

Get a free quote →

How to apply for a Lake in the Hills building permit

1. Decide whether you need a permit

Use the village’s permit guidance or call 847-960-7400.

2. Check zoning

Read the zoning code for setbacks and clearances, and any other village ordinance that applies.

3. Get the handout and application

Pick up the application and project brochure at Village Hall, or use the Public Portal for the online permit types.

4. Line up licensed contractors

Confirm each contractor holds a village license, or file as the homeowner for your own work.

5. Submit

Bring the packet to Village Hall, e-mail PDFs to cd@lith.org or use the parking-lot drop box at 600 Harvest Gate.

6. Approval and payment

The village sends the approval, conditions, required inspections, cost and payment directions.

7. Build and inspect

Book the inspections listed on the approval.

Review, corrections and what causes delay

Every application gets a zoning review and a building code review before a permit is issued, so a project that does not fit the setbacks or clearances in the zoning code stops at the first step. E-mailed submittals must be PDF attachments; photos of documents are not accepted. A contractor without a current village license holds up the permit as well, and a license application counts as incomplete until its $75 fee is paid.

Inspections and certificates in Lake in the Hills

When the village approves a permit, it tells you which inspections the work requires. Community Development monitors all phases of construction and development in the village.

  • Plumbing inspections are available on Monday, Tuesday and Thursday, from noon to 4 p.m.
  • Permit conditions come with the approval notice; follow them for the whole job.
  • Questions about a permit go to Village Hall at 847-960-7400.

Illinois building code in Lake in the Hills

Lake in the Hills enforces its building code (Chapter 24), contractor licensing (Chapter 38) and zoning code, with fees in Appendix B of the municipal code. FEMA’s Community Status Book lists the Village of Lake in the Hills (community 170481, McHenry County) as participating in the National Flood Insurance Program, with a current flood map dated November 16, 2006, and in the Community Rating System at class 6 (a 20% discount), with the current rating effective October 1, 2026.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Lake in the Hills building permit FAQs

Can I apply for a Lake in the Hills permit online?

For air conditioners, furnaces, roofing or siding, water heaters and water softeners, yes, through the Public Portal. Other permits are filed at Village Hall, by e-mail to cd@lith.org or in the drop box.

Do contractors need a village license?

Yes. Anyone doing work that needs a building permit must hold a Lake in the Hills contractor’s license ($75, January 1 to December 31), with insurance and a $10,000 bond.

Do plumbers and roofers pay the $75 license fee?

No. Roofing, plumbing and sprinkler contractors file a copy of their Illinois license only.

Can a homeowner do their own work?

Yes, for many projects, and the village has separate guidance for homeowners doing their own plumbing.

Does my HOA have to approve my project?

The village asks you to get HOA approval, but its own permit decision is based only on codes and zoning.

When are plumbing inspections?

Monday, Tuesday and Thursday, from noon to 4 p.m.

How much does a building permit cost?

It is assessed on approval under Appendix B, the Comprehensive Fine & Fee Schedule, and the village tells you the amount with the approval.

Lake in the Hills permit search and official resources

For the status of a permit or to check whether a contractor is licensed, call Village Hall at 847-960-7400. The Public Portal holds the online permit types and contractor license applications.

Inspections are where schedules slip.

Get a free quote →

Simplify Lake in the Hills permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Lake in the Hills sooner?

Let Alliance prepare, file, and track your Lake in the Hills permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Lake in the Hills permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.