Gurnee, Illinois Building Permit Guide

To get a building permit in Gurnee, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Gurnee’s Building Safety Division reviews plans and inspects construction inside the village, and its Building Division takes calls on permits and inspections at 847-599-7550.

Authority: Building Safety DivisionFiling: One Stop portal or paper formsPhone: 847-599-7550
Authority
Building Safety DivisionVillage of Gurnee
Three applications
New building, Short-Form, One StopPick by project
Inspections
24 hours’ noticeCall 847-599-7550
Flood insurance
CRS class 525% discount listed by FEMA

Inside the Village of Gurnee, building permits come from the village itself: the Building Safety Division reviews the plans and carries out the inspections, and the Building Division answers permit and inspection calls at 847-599-7550. Gurnee sorts projects into three filing routes: a New Buildings & Additions application for major construction, the online One Stop portal for routine replacements such as roofs, siding, furnaces and water heaters, and a Short-Form application for everything else. Inspections need 24 hours’ notice and your permit number.

What requires a building permit in Gurnee?

The village’s rule of thumb is broad: most construction, remodeling and improvement projects need a building permit before work begins. The Building Permits page then lists the projects it sees most often, each with its own submittal list, and that list is the best guide to what Gurnee expects you to file.

Inside the house

  • Basement finishes
  • Bathroom and kitchen remodels
  • Furnace and air conditioner installation or replacement
  • Water heater replacement
  • Window and exterior door replacement
  • Generators and solar panels
  • A certificate of occupancy for a space

Outside and on the lot

  • New buildings, additions and garages
  • Decks, patios, sidewalks and stoops
  • Sheds, gazebos and pergolas
  • Fences
  • Reroofing and siding
  • Swimming pools, hot tubs and lawn irrigation systems
  • Driveways and parking lot modifications
  • Demolition of a building

The list is not a complete catalogue. If your project is not on it, assume a permit is likely and call the Building Division before you order materials. Gurnee also points out that a permitted, inspected job can head off problems later, when the property is sold, insured or refinanced.

Rules Gurnee prints for specific work

  • Roof layers. Only one layer of asphalt or fiberglass shingles may go over an existing asphalt or fiberglass shingle roof. Asphalt or fiberglass shingles may not be laid over wood shingles or shakes, a second layer of wood shingles or shakes is not allowed, and asbestos-cement shingles are prohibited.
  • Window and door energy ratings. For commercial property the maximum U-factor is 0.34 for fixed glazing, 0.45 for operable glazing and 0.63 for entrance doors. For homes, the page’s Windows entry sets 0.28 for windows, doors, sidelights and patio doors, while its Doors entry gives 0.30 for the same group; ask the Building Division which figure it will apply before you order units.
  • Attached gazebos. A gazebo attached to the house, even only by a deck, needs plans stamped by an Illinois architect; a detached gazebo needs a drawing of its foundation and framing.
  • Fences. The village asks you to confirm the fence meets every Zoning Ordinance requirement before you apply.

Short on time to read all of this?

Get a free quote →

What Gurnee decides and what the state holds

Gurnee enforces its own building and zoning ordinances and sets its own permit fees; its Comprehensive Fee Schedule is part of the village code, in Chapter 32, Article II. The state supplies the rest of the framework: the Illinois Plumbing Code from the Department of Public Health, which also licenses plumbers; the Illinois energy and accessibility codes; roofing contractor licensing through the Department of Financial and Professional Regulation; and state approval for building in a regulated floodway.

Gurnee building department: who handles permitting

For property inside the village limits, Gurnee issues the permit. Its Community Development department houses the Building Safety Division, which reviews plans and inspects the work, and the Building Division line handles questions and inspection booking. Land outside the village, in unincorporated Lake County, is permitted by the county instead, so check which side of the boundary a parcel sits on before you file.

Gurnee permit contacts
DetailInformation
OfficeBuilding Safety Division, Community Development, Village of Gurnee
PhoneBuilding Division, 847-599-7550 (permits and inspections)
Online filingOne Stop portal, for the replacement projects it covers
Paper formsNew Buildings & Additions application; Building Application Short Form
Inspection notice24 hours; have the permit number ready
FeesComprehensive Fee Schedule, village code Chapter 32, Article II

The village’s permit page does not print office hours or a street address for the division, so call 847-599-7550 before you plan a counter visit.

Gurnee permit types and applications

Choosing the right form is the first step, because Gurnee uses three:

  • New Buildings & Additions application, for major construction: new buildings, additions and garages.
  • One Stop online portal, for air conditioner and furnace replacements, reroofs, siding, water heater replacement, fences, parking lot modifications, driveways, and window and door replacements.
  • Building Application Short Form, for everything else, including residential and commercial remodels, decks and patios.

Residential permits

Most house projects use the Short Form plus a project handout (Basement, Bathroom Remodel, Deck-Patio, Detached Accessory, Fence, Generator, Hot Tub, Kitchen Remodel, Lawn Irrigation, Mechanical, Pool, Solar Panel or Electrical Requirements). The submittals Gurnee lists for the common jobs:

Not sure this scope needs a permit?

Get a free quote →
What Gurnee asks you to submit
ProjectSubmit
Basement finishShort Form, list of contractors, and a layout of the whole basement with stairs, existing windows, furnace and mechanicals, outlets and switches, HVAC supplies and returns, new walls and doors, and plumbing
Bathroom remodelExisting and proposed layout showing outlets, switches, toilet, sink and shower or tub; contractor list; two sets of complete plans
Kitchen remodelExisting and proposed layout with outlets and switches; contractors and their proposals; two sets of complete plans
DeckPlat of survey with the deck drawn to dimension, the signed deck requirements sheet, and a construction plan
Patio, sidewalk or stoopPlat of survey with the work drawn to dimension and the contractor’s proposal
Shed or garagePlat of survey showing the location and a drawing of the foundation and framing; a garage also needs two sets of complete plans
PergolaPlat of survey with size and placement, construction plans showing how it is fixed to the deck or ground, and the contractor’s proposal
FencePlat of survey with the fence highlighted and the contractor’s proposal with specifications
Hot tubPlat of survey showing the tub and its distance to lot lines, the house and easements, plus the contractor’s proposal
GeneratorPlat of survey showing the generator and the contractor’s proposal
Lawn irrigationPlat of survey and the contractor’s proposal
Furnace or air conditionerThe contractor’s proposal
Water heaterThe proposal and a written letter of intent from a licensed plumber
Windows or doorsThe contract with sizes and locations (and U-factor ratings for windows), or, for owner-installed units, a copy of the order
SidingThe contractor’s proposal; install the water meter remote-reader mounting block to the village detail
ReroofThe contractor’s proposal

Swimming pools follow the village’s Pool Requirements sheet, which sets out every submittal, together with the Electrical Requirements. Solar panels need the Short Form, two sets of plans, a diagram of the electrical installation, a letter acknowledging the smoke and carbon monoxide detector requirements, and a signed and sealed letter from an Illinois architect or structural engineer certifying that the roof structure has been evaluated.

Rather talk it over?

Call 1-855-478-4290 →

Commercial permits

Commercial remodels go on the Short Form, and new commercial buildings and additions on the New Buildings & Additions application. To occupy a space, apply for a certificate of occupancy on the Short Form with a layout of the space and full details of any changes being made. Parking lot modifications can be filed through One Stop, and commercial windows and doors must meet the commercial U-factor limits above.

What comes before the building permit

  • Zoning. Fence applicants must first meet every Zoning Ordinance requirement, and most outdoor projects (decks, patios, sheds, garages, pergolas, hot tubs, generators) are filed with a plat of survey showing where the work will sit.
  • Demolition. Get disconnection letters from ComEd and the gas company, and file a description of the work, a site plan or aerial showing what will be removed, and the contractor’s details.
  • Floodplain. Gurnee takes part in the National Flood Insurance Program; work in a state-regulated floodway also needs approval from the Illinois Department of Natural Resources.
  • Unincorporated land. A parcel outside the village is a Lake County matter, not a Gurnee one.

Gurnee permit costs and fees

Gurnee’s permit fees are set in its Comprehensive Fee Schedule, which the village publishes as part of its municipal code (Chapter 32, Article II) rather than on the Building Permits page. The amounts are not repeated on the permit page, so the figure for a given project comes from that code chapter or from the Building Division when your application is reviewed.

Where Gurnee fee information sits
ItemWhere it is set
Building, trade and plan review feesComprehensive Fee Schedule, village code Chapter 32, Article II
Fee for your specific jobCalculated by the Building Division during review; call 847-599-7550
Flood insurance discountFEMA Community Rating System, class 5 (25% listed)

Rather not deal with the building department?

Get a free quote →

Trade permits and who may pull them

Gurnee does not split trade work into separate applications on its permit page: furnace, air conditioner and water heater jobs have their own One Stop entries, and remodels list every trade contractor on the Short Form. The village’s trade rules that are published:

  • Electrical. For solar work the village asks you to make sure the electrician is registered with the Village of Gurnee, and pool and hot tub permits come with a separate Electrical Requirements sheet.
  • Plumbing. A water heater permit needs a written letter of intent from a licensed plumber. Plumbers are licensed by the state, through the Illinois Department of Public Health.
  • Mechanical. Furnace and air conditioner permits come with the Mechanical Requirements handout and the installer’s proposal.
  • Roofing. Reroofs go through One Stop with the roofer’s proposal; roofing contractors hold Illinois state licenses.
  • Design professionals. Attached gazebos need Illinois-architect stamped plans, and solar installations a sealed roof-structure letter from an Illinois architect or structural engineer.

Homeowners do appear in the village’s instructions: for window and door permits, an owner doing the work files a copy of the order instead of a contractor’s contract. For other trades the page does not say whether an owner may do the work, so ask the Building Division before you apply as your own installer.

How to apply for a Gurnee building permit

1. Confirm the parcel is in Gurnee

Village land is permitted by Gurnee; unincorporated land around it goes to Lake County.

2. Pick the application

One Stop for the listed replacement jobs, the New Buildings & Additions form for major construction, the Short Form for everything else.

3. Download the project handout

Each common project has a requirements sheet listing its drawings and details.

4. Assemble the packet

Plat of survey with the work drawn in, plans (two sets where the village asks), contractor list and proposals.

5. File and answer review comments

The Building Safety Division reviews the plans; correct anything it flags.

6. Pay and receive the permit

Fees follow the Comprehensive Fee Schedule in the village code.

7. Book inspections

Call 847-599-7550 at least 24 hours ahead with your permit number.

Want this handled start to finish?

Get a free quote →

Review, corrections and what causes delay

The village’s page does not publish review times, so ask for an estimate when you file. Most of the delay it can head off comes from missing pieces it has already listed: a plat of survey without the project drawn to dimension, one set of plans where two are required, a basement or kitchen layout that leaves out outlets, switches or mechanical equipment, or a contractor list that is incomplete. Solar and attached-gazebo projects stall without the professional letters or stamped plans, and demolition cannot move until both utility disconnection letters are in.

Inspections and certificates in Gurnee

Book inspections by calling the Building Division at 847-599-7550. The village needs 24 hours’ notice and will ask for your permit number, so keep the permit paperwork at hand. The inspections themselves are conducted by the Building Safety Division.

A certificate of occupancy is requested on the Short Form with a layout of the space and details of every change being made. For pools and hot tubs, the separate Electrical Requirements sheet lists what the electrical work must include.

Illinois building code in Gurnee

Gurnee applies the building and zoning rules in its village code; the Building Permits page sets several of them out directly, such as the shingle-layer limits and the window and door U-factor caps. FEMA’s Community Status Book lists the Village of Gurnee (community 170365, Lake County) as a participant in the National Flood Insurance Program, with a current flood map dated October 5, 2023. Gurnee is also in the Community Rating System at class 5, with a 25% discount listed.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Gurnee building permit FAQs

Do I need a permit to replace my roof in Gurnee?

Yes. Reroofs are filed through the One Stop portal with the contractor’s proposal, and the village limits how many shingle layers may stay on the roof.

Can I apply for a Gurnee permit online?

For some jobs. The One Stop portal covers air conditioner and furnace replacements, reroofs, siding, water heaters, fences, parking lot changes, driveways, and window and door replacements; other projects use the paper applications.

Do I need a permit for a shed or a fence?

Yes. A shed needs a plat of survey and a drawing of its foundation and framing; a fence needs a plat of survey and must meet the Zoning Ordinance.

Inspections are where schedules slip.

Get a free quote →

How do I schedule an inspection in Gurnee?

Call the Building Division at 847-599-7550 at least 24 hours ahead and give your permit number.

What U-factor do new windows need?

Commercial fixed glazing 0.34, operable 0.45 and entrance doors 0.63. For homes the page shows 0.28 under Windows and 0.30 under Doors, so ask the village which applies.

Does a water heater replacement need a plumber?

The permit needs a written letter of intent from a licensed plumber along with the proposal.

Where are Gurnee’s permit fees listed?

In the Comprehensive Fee Schedule, Chapter 32, Article II of the village code; the Building Division gives the amount for your project.

Gurnee permit search and official resources

The village’s permit page does not describe an online permit search. To check a permit’s status or find an older permit for an address, call the Building Division at 847-599-7550 with the address and, if you have it, the permit number.

Simplify Gurnee permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Gurnee sooner?

Let Alliance prepare, file, and track your Gurnee permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Gurnee permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.