Inside the Village of Frankfort, the village’s Building Department at 432 W. Nebraska Street (815-469-2177) handles building permits, plan review and inspections. Every new application starts with an account on BS&A Online, every contractor must hold a Frankfort contractor license before a permit is issued, and new houses are charged $0.40 per square foot plus the cost of the independent plan review the village orders. Inspections called in before 12:30 p.m. are set for the next business day.
What requires a building permit in Frankfort?
Frankfort groups its permit triggers into five kinds of work rather than listing every job. A permit is needed to work in the public right-of-way, to build anything new, to remodel or change how a building is used, to reshape the land, and for temporary uses such as signs and storage pods.
Permit needed
- Right-of-way work such as a driveway apron or masonry mailbox
- New homes, decks, sheds, patios and elevators
- Remodeling or changing the use of a building
- Changing grade, major landscaping or removing protected trees
- Temporary signs, PODS and temporary use of land or buildings
Jobs with their own village sheets
- Pools, hot tubs, fences, pergolas, gazebos and fire pits
- Re-roofs, siding, soffits, fascia and gutters
- Basement remodels, foundation repair and draintile
- Generators, rooftop solar, electrical and low-voltage work
- Driveways, brick pavers, concrete, mudjacking and asphalt sealing
The village keeps 49 permit summary sheets, one for each common project, from dog runs and playhouses to construction trailers, dumpsters and fill or land-balance work, and a separate Residential Construction Guidelines document for new houses and remodeling. The sheets are titled as permit submittal lists, so start with the one for your project before opening an application. For any digging, the permit page also points to J.U.L.I.E., the utility-locating service, before work starts.
What Frankfort decides and what the state holds
Frankfort adopts its own construction codes, with village amendments, and keeps the code books for public review at the Administration Building. Its permit page lists the 2021 International Residential, Building, Existing Building, Mechanical, Fuel Gas, Fire, Property Maintenance and Swimming Pool and Spa Codes, the 2020 National Electrical Code, the 2021 Illinois Energy Conservation Code, the 2014 Illinois State Plumbing Code and the 2018 Illinois Accessibility Code. Zoning, contractor licensing, protected trees and fees are village decisions; plumbing follows the state plumbing code and its licensed plumbers.
Frankfort building department: who handles permitting
The Building Department is run by its director, Adam Nielsen, a Certified Floodplain Manager. The department reviews applications and construction documents against both the zoning and building codes, issues permits, conducts structural, electrical, plumbing and mechanical inspections, interprets the codes and also handles business licensing and code compliance.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Building Department | Permits, plan review, inspections, contractor licenses | 432 W. Nebraska Street, Frankfort, IL 60423; 815-469-2177; VOFbuilding@frankfortil.org; Monday to Friday 8 a.m. to 5 p.m. |
| Plan Commission / Zoning Board of Appeals | Rezonings, special uses, PUDs, plats, variances | Meets second and fourth Thursdays as needed |
| Fire protection districts | Fire inspections, coordinated by the village | Frankfort, Mokena and Monee Fire Protection Districts are linked from the village site |
Frankfort has about 21,400 residents, and the Census Bureau places all of them in Will County, although the village’s limits also reach into Cook County. The village’s site links three fire protection districts (Frankfort, Mokena and Monee), and fire inspections are coordinated with outside agencies. Land outside the village limits is unincorporated county land: Will County’s Land Use Department issues permits there.
Frankfort permit types
Applications run through BS&A Online, the village’s permit system. Every new application requires an online account; once it is created the applicant can open the application, exchange messages with the department and upload plans and documents, and review comments or approval arrive at the account’s email address. A paper application can still be downloaded, and roofing has its own application.
Residential permits
- New homes. Every new construction permit, residential or not, is reviewed by an independent third party, and the village passes that review cost to the applicant on top of the $0.40-per-square-foot permit fee. The department’s inspection page says a new home must pass at least 23 inspections before final approval, and the village’s Construction Guidelines for Residential, New Construction and Remodeling, updated August 27, 2020, is the village’s written guide for building or remodeling a house there.
- Remodeling. Fees follow the construction cost. Large residential remodels, like commercial ones, are typically sent to the outside reviewer too.
- Exterior and yard work. Decks, sheds, patios, pools, fences and similar projects each have a summary sheet. Work in the parkway, such as a new driveway apron or a masonry mailbox, is right-of-way work and always needs a permit.
- Landscape and grading. Changing the grade, installing major landscaping or removing a protected tree needs a permit before work starts.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
New commercial and industrial buildings are charged $0.50 per square foot plus third-party review costs, and commercial and industrial remodels are typically reviewed by the outside firm as well. Commercial asphalt resurfacing and sealing, elevators and wheelchair lifts, fire protection systems, dumpsters and outdoor live entertainment each have their own summary sheet, and a business located in the village also needs a village business license, which costs $15 to $35 a year.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Each property sits in a zoning district (estate residential, single-family, attached residential, historic residential, business, office-research and industrial districts) shown on the village’s interactive GIS zoning map.
- Plan Commission and Zoning Board of Appeals. One seven-member body holds both roles: it recommends to the Village Board on rezonings, special uses, planned unit developments, annexations and subdivision plats, and it hears and decides variances and administrative appeals. When the law calls for a public hearing, residents, owners and other interested people can testify and ask questions before the commission votes.
- Long-range plans. The 2040 Comprehensive Plan, its future land use maps and the Downtown Residential Design Guidelines, all adopted December 16, 2019, are what the commission measures development proposals against.
- Signs. The sign ordinance is a stand-alone part of the zoning ordinance that limits the number, location, size, lighting and duration of signs.
- Engineering and flooding. The village’s engineering design standards act as its subdivision regulations and cover drainage, environmental concerns and flooding; the landscape ordinance governs parkway trees and stormwater facilities.
- Historic district. Frankfort has a Historic Preservation Commission and a Historic Residential zoning district.
Frankfort permit costs and fees
The Building Department publishes its fees on the village site. It cites Ordinance 2595, passed June 15, 2009, for the rule that applicants pay the village’s third-party plan-review costs on new construction and larger remodels. Payments can be made online through the village’s payment link or at the office.
| Item | Fee |
|---|---|
| New residential construction | $0.40 per square foot, plus third-party review costs |
| New commercial construction | $0.50 per square foot, plus third-party review costs |
| New industrial construction | $0.50 per square foot, plus third-party review costs |
| Reinspection (each visit after the first) | $75 |
Rather talk it over?
Call 1-855-478-4290 →| Project cost | Permit fee |
|---|---|
| $0 to $100 | $25 |
| $100.01 to $1,000 | $100 |
| $1,000.01 to $2,000 | $150 |
| $2,000.01 to $2,500 | $175 |
| $2,500.01 to $5,000 | $200 |
| $5,000.01 to $10,000 | $200 + $15 per $1,000 over $5,000 |
| $10,000.01 to $25,000 | $225 + $15 per $1,000 over $5,000 |
| $25,000.01 to $100,000 | $250 + $15 per $1,000 over $5,000 |
| Over $100,000 | $165 + $16.50 per $1,000 over $5,000 |
Worked example. A $20,000 basement remodel falls in the $10,000.01-to-$25,000 band: $225 plus $15 for each of the 15 thousands above $5,000 ($225) comes to $450. Note that the bands do not join smoothly. Each one restarts its base charge and measures from $5,000, so the fee jumps at every band line (a $25,000.01 job costs $25 more than a $25,000 one); keep an estimate inside a single band and confirm the figure with the department.
Contractors pay a separate annual license fee of $75 to $150, depending on the license. The fee page gives no figure for the outside review on new buildings, so ask the department for an estimate before budgeting.
Trade permits and who may pull them
Electrical, plumbing and mechanical work is permitted by the Building Department, and the village says plumbing, electrical and fire inspections are coordinated with outside professionals or agencies rather than done only by its own code officials. Electrical and low-voltage work, plumbing and fire protection systems each have their own permit summary sheet.
- Contractor licensing. Every contractor working in the village must be licensed by Frankfort, and permits are not issued until the contractor’s license is in place. The annual fee is $75 to $150 for general contractors and subcontractors.
- Getting licensed. Contractors cannot register online. The license documents, including a current certificate of insurance, are emailed to the department; once approved, the contractor creates a BS&A Online account and links it with a PIN the village supplies.
- Plumbing. Work follows the 2014 Illinois State Plumbing Code, and plumbers carry state licenses.
- Homeowners. Residents can apply through BS&A Online for their own projects, and the village holds residents responsible for scheduling required inspections even where a contractor makes the calls.
Rather not deal with the building department?
Get a free quote →The village advises residents that a contractor’s license protects them from some injury claims and substandard work but does not guarantee workmanship, and it encourages checking references before hiring.
How to apply for a Frankfort building permit
Use the interactive GIS zoning map; unincorporated parcels go to the county.
Find the sheet for your project in the Building Department’s document center.
Make sure every contractor on the job holds a current Frankfort license.
Homeowners register directly; contractors link their account with the village PIN.
Choose the permit type, attach plans and documents, and send.
Review comments and approval come by email; reply and upload revisions in the portal.
Pay the fees online or at the office, then call in the first inspection.
Review, corrections and what causes delay
New construction, commercial and industrial jobs, and large residential remodels go to the village’s independent plan reviewer, so their timing depends on that review and on how quickly comments are answered. One stop the village names outright is an unlicensed contractor: no permit is issued until every contractor holds a Frankfort license with a current certificate of insurance. Questions can be emailed to VOFbuilding@frankfortil.org.
Inspections in Frankfort
To book an inspection, call 815-469-2177 and leave the details on the inspection voicemail. Requests received before 12:30 p.m. are scheduled for the next business day and later requests for the following business day; inspections can also be booked in advance. A village code official handles many inspections, while plumbing, electrical and fire inspections are coordinated with outside professionals or agencies, so a project may see several inspectors.
Residents are responsible for making sure every required inspection is scheduled. A new house must pass at least 23 inspections before final approval. The village charges $75 for each visit after the first when work is incomplete or incorrect.
Want this handled start to finish?
Get a free quote →Illinois building code in Frankfort
Frankfort enforces the 2021 International Codes and the 2020 National Electrical Code with village amendments, plus the state plumbing, energy and accessibility codes. FEMA’s Community Status Book lists the Village of Frankfort (community 170701, covering its Cook and Will county areas) as participating in the National Flood Insurance Program, with flood maps effective February 15, 2019; the village’s building director is a certified floodplain manager.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Frankfort permit search and official resources
Permit records are village records under the Illinois Freedom of Information Act. Requests must be in writing; the village’s FOIA officer for legislative and administrative records is Adam Nielsen, and the FOIA page has an online form for village records (police records have their own officer and form). The online Code of Ordinances is updated once a year and may miss recent changes; copies of every ordinance, back to the 1800s, are available at the Administration Building.
- Frankfort Building Department
- Permits and adopted codes
- BS&A Online, Village of Frankfort
- Building fees
- Contractor information
- Inspections
- Licenses and registration
- Planning and zoning
- Plan Commission / Zoning Board of Appeals
- Codes and ordinances
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Frankfort building permit FAQs
How much is a building permit for a new house in Frankfort?
$0.40 per square foot, plus the cost of the independent plan review the village orders for all new construction.
Can I apply online?
Yes. New applications start with a BS&A Online account, where you upload documents and receive comments.
Do contractors need a Frankfort license?
Yes. Permits are not issued until every contractor is licensed by the village; the annual fee is $75 to $150.
How do I schedule an inspection?
Call 815-469-2177 and leave the details on the inspection voicemail; calls before 12:30 p.m. get the next business day.
Do I need a permit to remove a tree or regrade my yard?
Yes, to remove a protected tree, change the grade or install major landscaping.
How much does a remodeling permit cost?
It depends on the construction cost: $200 for a job between $2,500.01 and $5,000, and $450 for a $20,000 remodel.
Is Frankfort in Will County or Cook County?
Both: the village says it lies in Will and Cook counties, though the Census Bureau counts essentially all of its residents in Will. The village issues permits in both parts.
Who hears variance requests?
The Plan Commission, sitting as the Zoning Board of Appeals, which meets on the second and fourth Thursdays as needed.
Simplify Frankfort permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Frankfort sooner?
Let Alliance prepare, file, and track your Frankfort permits while your crew stays on the job.
More Illinois permitting guides
Will County
Read guide →Homer Glen
Read guide →Lockport
Read guide →Franklin County Building Permit Guide
Read guide →Franklin Park Building Permit Guide
Read guide →Freeport Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Frankfort permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.