Homer Glen’s own Building Department at Village Hall, 14240 W. 151st Street (708-301-1301), issues and inspects building permits inside the village. Small applications can be emailed to buildingdepartment@homerglenil.org, new construction and larger projects are filed in person, and every contractor must be registered with the village first. A new house can take up to a month in review, while a deck or sign permit is often reviewed in under 10 business days.
What requires a building permit in Homer Glen?
The village’s permit process page lists the typical jobs that need a permit and says the list is not complete, so call the Building Department if you are unsure. Every permit it issues also comes with at least one inspection.
Permit needed
- New homes and commercial buildings
- Interior and exterior remodels
- Additions and attached or detached garages
- Decks, sheds, gazebos, covered patios and exterior flatwork
- Above-ground and in-ground pools
- Roofing, siding, windows, doors and fences
- Permanent and temporary signs, demolition, lawn irrigation, masonry mailboxes and outdoor lighting
No longer needed
- HVAC system replacements, since May 1, 2025
Homer Glen also permits outdoor lighting: the village has separate residential and commercial outdoor lighting permit applications as part of its dark-sky lighting requirements. Electrical and solar work, address assignments, temporary uses and commercial occupancy each have their own form too.
What Homer Glen decides and what the state holds
Homer Glen is a home-rule village and adopts its own building codes in Chapter 75 of the Village Code. Since May 1, 2025 it has enforced the 2024 International Building, Residential, Fire, Property Maintenance, Mechanical, Fuel Gas and Pool and Spa Codes, the 2024 energy code with Illinois amendments and the 2023 National Electrical Code; plumbing follows the current State of Illinois plumbing code. Zoning, fees, contractor registration, construction hours, tree preservation and the exterior construction standards for large accessory buildings are all village rules, and every building permit is issued under the village’s building, zoning and stormwater ordinances.
Homer Glen building department: who handles permitting
The Building Department answers questions on codes, permits and the permit process for residents, business owners and contractors, registers contractors and schedules every inspection. Its Building Official is Scott Chance (708-301-1301, ext. 120). Depending on the permit, an application may also be reviewed by other departments for zoning and engineering.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Building Department | Permits, inspections, contractor registration | 14240 W. 151st Street, Homer Glen, IL 60491; 708-301-1301; buildingdepartment@homerglenil.org |
| Village Hall | General questions, Village Code, FOIA requests | Same address; 708-301-0632; Monday to Friday 8 a.m. to 4:30 p.m.; FOIA fax 708-301-8407 |
| Plan Commission (also the Zoning Board of Appeals) | Rezonings, variances, special uses, plats | Village Board Room, 7 p.m., first and third Thursdays |
| Health department | Approval for properties with a well and septic field | Attached to the village application for pools and accessory buildings |
About 24,900 people live in Homer Glen, all of them in Will County by the Census Bureau’s count, although FEMA lists the village under both Cook and Will counties. The village’s pool and accessory-structure applications ask for health department approval wherever a property has a well and septic field. Parcels outside the village limits are unincorporated land permitted by the county.
Homer Glen permit types
The village posts a fillable application for each kind of work: accessory structures, additions and remodels, asphalt, concrete and pavers, commercial build-outs and new commercial buildings, demolition, electrical and solar, fences, lawn irrigation, masonry mailboxes, roofing, siding, windows and doors, pools and signs. Completed applications and supporting documents are emailed or dropped off.
Residential permits
- Additions, remodels, attached garages and three-season rooms. One application (August 2026 edition) covers all four; new houses and larger projects must be submitted in person.
- Sheds and other accessory buildings. One storage shed per residence, within the zoning district’s lot coverage limit, with a concrete floor except for pole buildings for hoofed animals. Any accessory building over 500 square feet must meet the village’s Exterior Construction Standards (section 75-67B). Decks use the village’s 2026 Deck Building Guide and its worksheet.
- Fences. Up to 6 feet in side and rear yards on residential lots and 8 feet in commercial and industrial districts; in a front or corner side yard, 4 feet and at least 50% open. A pool safety barrier must be at least 48 inches.
- Pools. A plat of survey with setbacks and lot coverage, a pool affidavit and a letter of intent from the electrician. An in-ground pool must be 25 feet from a septic absorption field and an above-ground pool 10 feet, and in-ground pool permits now include the surrounding patio work.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
New commercial buildings and commercial build-outs or remodels have their own applications, as does the commercial occupancy permit. Commercial outdoor lighting is permitted separately, and signs need a 2026 sign permit application. Commercial plan review fees, sprinkler and fire-alarm review fees appear in the village’s fee ordinance.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The seven-member Plan Commission is the village’s planning agency and zoning authority and sits as the Zoning Board of Appeals; it recommends to the Village Board.
- Trees. The Tree Preservation Ordinance, approved March 28, 2006, applies to development applications and requires a tree survey and a preservation plan by a licensed tree professional; developers who do not save the required share of significant trees replace them at a higher ratio or pay restitution.
- Wells and septic. Where a property has a well and septic field, the health department’s approval goes with the permit application.
- Impact fees. New residential development pays school, park, fire district and library impact fees under section 138.4 of the Village Code.
Homer Glen permit costs and fees
The village’s fee page points to the Village Code for the current schedule of building permit fees. The fee document the village links as its “Building Permit Fee Schedule” is Ordinance 13-044, published July 23, 2013, which amended the annual fee ordinance; pool fees have changed since then (the current amounts are printed on the 2025 pool application), so confirm any other figure with the department before budgeting.
| Item | Fee |
|---|---|
| Residential building permit | $9 per $1,000 of construction cost (minimum $50) |
| Commercial and industrial building permit | $8.50 per $1,000 of construction cost (minimum $50) |
| Above-ground pool (2025 pool application) | $200 |
| In-ground pool, including its patio (2025 pool application) | $9 per $1,000 of total cost |
| Plumbing | $15 per fixture |
| Single-family electric service upgrade, 100–300 / 301–400 / 401–600 amps | $100 / $200 / $300 |
| Lawn sprinkler system | $60 |
| Demolition, under / over 650 sq ft | $100 / $200 |
| Right-of-way construction | $1,200 |
| Reinspections: first / second / third / fourth | $75 / $150 / $225 / $300 |
| Plan revision (interior) | 10% of the original fee |
| Working without a permit | Three times the original permit fee |
| Residential variance | $475, plus $100 per additional variance |
| Special use / rezoning | $675 / $800 |
Rather talk it over?
Call 1-855-478-4290 →Worked example. Under the residential rate, a $30,000 kitchen remodel comes to $270 ($9 times 30). The 2013 schedule also lists square-foot figures beside the residential rate ($100 for areas within the outside walls, $50 for crawl spaces, basements and garages, $10 for decks and $25 for accessory buildings), without explaining how they combine with the rate, so ask the department to run the numbers for a new house. Plan examination is charged by size, from $200 for 401 to 1,000 square feet up to $350 for 3,001 to 4,000 square feet, and the same ordinance sets $300 for a site development permit, $250 for an internal landscaping review and $200 for a review of land within 1.5 miles outside the village.
Contractor registration, under the same ordinance, is $150 for a general contractor, $250 for a general contractor with trades, $75 for a subcontractor and $150 for a construction manager; the village now takes registration payments online. New homes also carry impact fees: school and park contributions from the village’s tables, a fire district payment of at least $500 per residential unit, and a library fee of $212 per unit in the Homer Township Public Library district or $242 in the New Lenox Public Library district. Building fees are paid by Visa, Mastercard, Discover or check, and most can be paid by phone.
Trade permits and who may pull them
Homer Glen handles electrical and plumbing as part of its own permits: electrical and solar work has its own application, plumbing is charged per fixture, and the pool and accessory-structure applications ask for a letter of intent on company letterhead from the electrician or plumber doing that work. HVAC system replacements no longer need a permit.
- Registration. Contractors register each year on the village’s 2026 Contractor Registration Application, delivered in person, by mail or by email with current, signed documents. No permit is issued for a contractor who is not registered.
- Plumbing. Plumbing follows the current State of Illinois plumbing code and is done by state-licensed plumbers.
- Homeowners. The pool application accepts a homeowner’s affidavit in place of the trade letter of intent where it applies.
- Hiring. The village publishes a “Before You Hire a Contractor” page and a Protocol for Construction Projects page.
Rather not deal with the building department?
Get a free quote →Construction work of every kind, including deliveries, land clearing and demolition, is limited to 7 a.m. to 7 p.m. Monday through Saturday and 8:30 a.m. to 5 p.m. on Sundays and legal holidays.
How to apply for a Homer Glen building permit
Check the village zoning map or GIS; county land is permitted by the county.
Every contractor files the 2026 registration form before the permit can issue.
Download the fillable form for your project from the Permit Applications page.
Mark the proposed work, setbacks and lot coverage on the plat of survey and add plans, letters of intent and any health department approval.
Email small projects to buildingdepartment@homerglenil.org; bring new construction and larger projects to Village Hall.
Pay by card or check, in person or by phone for most permits.
Give two working days’ notice and have the permit number ready.
Review, corrections and what causes delay
Applications are reviewed in the order received, and depending on the type may pass through building, zoning and engineering review. The village says a single-family home can take up to a month and a deck or sign permit may take under 10 business days, with timing depending on the season and on the quality of what is submitted. Once issued, a permit is void if construction has not begun within 180 days or is not finished within a year, and the village assesses a penalty when final inspections are not scheduled.
Inspections in Homer Glen
All permits require inspections, scheduled directly with the Building Department. The application forms ask for two working days’ notice, with requests made by 2 p.m. for a next-day inspection when one is available (the permit process page asks for 24 to 48 hours’ notice); have the permit number at hand when you call. New construction needs several inspections, while most miscellaneous permits need only a final.
The first inspection must take place within six months of issue or the permit is void, and the final inspection must be completed within a year. Failed or repeat visits cost more each time under the fee ordinance: $75 for the first reinspection, then $150, $225 and $300.
Want this handled start to finish?
Get a free quote →Illinois building code in Homer Glen
Homer Glen enforces the 2024 International Codes and the 2023 National Electrical Code under Chapter 75 of its Village Code, plus the state plumbing code. FEMA’s Community Status Book lists the Village of Homer Glen (community 171080, covering its Cook and Will county areas) as participating in the National Flood Insurance Program, with flood maps effective February 15, 2019.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Homer Glen permit search and official resources
Permit and inspection records are requested under the Freedom of Information Act on the village’s FOIA form, sent to the FOIA officer by email, fax (708-301-8407) or mail. The village answers within five business days (21 for commercial requests); the first 50 black-and-white pages are free, then 15 cents a page, 20 cents for color and $1 for a certified copy. The Village Code is online and updated quarterly, with later ordinances posted separately.
- Homer Glen Building Department
- Permit process
- Permit applications and forms
- Adopted building codes
- Building permit fee schedule (Ordinance 13-044)
- Pool application and 2025 fees
- Contractor registration
- Construction hours
- Residential development impact fees
- Plan Commission
- Tree preservation
- Village Code
- Public information (FOIA)
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Homer Glen building permit FAQs
Do I need a permit to replace my furnace or air conditioner?
No. Since May 1, 2025, HVAC system replacements in Homer Glen no longer need a permit.
How long does a permit take?
A new house can take up to a month; small jobs such as a deck or a sign are often reviewed in under 10 business days.
Can I email my application?
Yes, for most projects. New construction and larger projects must be submitted in person at Village Hall.
How much is a pool permit?
$200 for an above-ground pool; an in-ground pool is $9 per $1,000 of the total cost, including the patio.
How tall can my fence be?
Six feet in side and rear yards; 4 feet and at least 50% open in a front or corner side yard.
Do contractors have to register?
Yes. No permit is issued for an unregistered contractor; the 2026 registration form can be mailed, emailed or dropped off.
When can construction crews work?
7 a.m. to 7 p.m. Monday through Saturday, and 8:30 a.m. to 5 p.m. on Sundays and legal holidays.
Simplify Homer Glen permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Homer Glen sooner?
Let Alliance prepare, file, and track your Homer Glen permits while your crew stays on the job.
More Illinois permitting guides
Will County
Read guide →Lockport
Read guide →Mokena
Read guide →Homewood Building Permit Guide
Read guide →Huntley Building Permit Guide
Read guide →Iroquois County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Homer Glen permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.