East Moline, Illinois Building Permit Guide

To get a building permit in East Moline, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

East Moline’s Inspections Department in the City Hall Annex issues building and trade permits inside the city, through an online portal or paper forms, and posts the Village of Carbon Cliff’s permit forms too.

Authority: Inspections DepartmentOffice: 912 16th Avenue, East MolinePhone: 309-752-1509
Counter hours
8 to 9:30 a.m.And 3:30 to 4:30 p.m. weekdays
Contractor registration
$60 a yearPlus $10,000 bond, except plumbers
Shed permit
Over 120 sq ftUtility buildings
Driveway approach
Permit for city right-of-wayEngineering inspects before the pour

In East Moline, building, electrical, mechanical, plumbing, roofing, sign and demolition permits come from the city’s Inspections Department at the City Hall Annex, 912 16th Avenue (building and electrical 309-752-1509; plumbing and mechanical 309-752-1512). The counter is open weekdays from 8 to 9:30 a.m. and 3:30 to 4:30 p.m., while inspectors are in the field in between. Contractors register each year for $60 and apply through the city’s permit portal; property owners can file paper applications. The department also posts the permit forms, fee schedule and contractor registration for the Village of Carbon Cliff.

What requires a building permit in East Moline?

The city’s residential permit page lists the jobs that need a permit; signs have their own application, filed after a talk with the Zoning Official:

Permit needed

  • New construction, room additions and garages
  • Utility buildings (sheds) over 120 square feet
  • Replacement windows, roofing and siding
  • Pools
  • Electrical, mechanical and plumbing work
  • Lawn irrigation systems
  • Driveways or approaches, sidewalks and excavations
  • Demolitions, and signs (see the Zoning Official first)

No permit

  • The part of a driveway on private property, outside the city right-of-way; it must not encroach on a neighbor’s land
  • Utility buildings of 120 square feet or less, which are not on the city’s permit list

Contractors working on homes built before 1978 must hold EPA lead-safe certification under the federal renovation, repair and painting rule, as the city reminds applicants.

What the city decides and what the state holds

East Moline adopts its own codes: the 2018 International Building, Existing Building, Residential, Mechanical, Fuel Gas, Property Maintenance and Energy codes and the 2017 National Electrical Code. Plumbing follows the city’s Uniform Minimum Plumbing Standards Code, subject to the Illinois Plumbing Code. The city has also adopted the federal EPA model standards for radon control in new homes and other new residential buildings of three stories or less, noting that East Moline lies in a zone of high radon potential. Plumbers and roofers hold state licenses.

East Moline building department: who handles permitting

The Inspections Department reviews plans, issues permits, registers contractors and performs inspections. Zoning questions, sign approvals and zoning cases go to the Zoning Official, Tim Wymes, Director of Community Development, and to the Planning and Zoning Commission or the seven-member Board of Appeals.

East Moline permit contacts
OfficeContact
Inspections Department, building and electricalCity Hall Annex, 912 16th Avenue, East Moline, IL 61244; 309-752-1509; fax 309-752-1572
Plumbing and mechanical309-752-1512
Counter hoursWeekdays 8 to 9:30 a.m. and 3:30 to 4:30 p.m.; field inspections 9:45 a.m. to 3:15 p.m.
City Hall main line915 16th Avenue; 309-752-1599
Engineering (approach inspections)309-752-1540

Short on time to read all of this?

Get a free quote →

Inspectors’ office phones forward to their cell phones in the field, so leave a message if no one answers; if you cannot leave one, call City Hall at 309-752-1599. A monitored mailbox at the front door of the annex takes permit applications and payments.

The department also posts Carbon Cliff’s fee schedule, applications and contractor registration, and East Moline’s registration covers work in Carbon Cliff. Unincorporated land around the city is permitted by Rock Island County’s Zoning and Building Safety office, which does not work inside East Moline.

East Moline permit types

The permit portal covers building, demolition, electrical, mechanical, plumbing, roofing and sign permits. Paper forms are posted for residential building, demolition, sign, electrical, mechanical and plumbing permits, each with a Carbon Cliff version.

Residential permits

  • Who may apply: a contractor registered with East Moline, the property owner of legal record, or an authorized agent with written authorization from the owner. The permit holder takes responsibility for the work and for calling for inspections.
  • What the form asks: the valuation for general construction, electrical, mechanical and plumbing work; the subcontractors for electrical, plumbing, mechanical, concrete, sprinklers and roofing; and details such as total square feet, finished basement and egress windows, bedrooms, bathrooms, replacement window and door counts with their U-factor, roofing tear-off and squares, and siding material.
  • New homes: the radon-resistant construction standards the city adopted apply.
  • Pools: the city posts MidAmerican Energy’s swimming pool clearance form with its building documents.

Commercial permits

Commercial and industrial work, and residential buildings of more than two units, use the application for plan review and construction. It asks for the zoning and flood plain classification, the type of construction and occupancy class, area, height and stories, and the cost of building, electrical, plumbing and mechanical work, and it states that an engineered site plan is required for all new construction. Engineering and development staff review it along with inspections.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning: sign permits start with the Zoning Official; rezonings go to the Planning and Zoning Commission with a $100 petition fee, refunded if withdrawn before the legal notice is published.
  • Driveway approach: the approach in the right-of-way needs a permit from the Inspections Department for a nominal fee and must follow the city’s Standard Construction Details 03-03 to 03-05.
  • Right-of-way digging: plumbing excavation in the city right-of-way may need a separate excavation permit.
  • Grading and drainage: under the city’s storm water control ordinance (as the city summarized it in September 2007), adding 1,000 square feet or more of roof, patio, parking or other hard surface, or disturbing 10,000 square feet or more of ground, needs a Class 1 grading and drainage permit with a basic site plan; projects over one acre need a Class 2 permit with an engineered site plan, a performance bond or letter of credit, and a storm water pollution prevention plan and other NPDES paperwork.

Drainage rules that affect house projects

The storm water ordinance bars forcing surface water onto a neighbor’s property, or blocking water that would naturally enter yours, without a drainage permit, and it bars buildings, permanent structures and hard surfaces inside a drainage easement without the Director of Engineering’s written approval; driveways and sidewalks may cross an easement by the shortest route. Sump pump and footing drain water may not be discharged so that it builds up water or ice in a street or alley. The city notes that many areas have a high water table, and it recommends directing sump discharge toward the rear of the house.

East Moline permit fees

The building fee schedule the city posts is the fiscal 2011–2012 sheet, and it is based on the project’s valuation. Trade fees are printed on each trade application (electrical revised April 2014, plumbing and mechanical revised June 2016), and demolition fees on a sheet revised April 23, 2003. These are the newest fee documents the city posts, so confirm amounts with the department before paying.

East Moline permit fees (building sheet FY 2011–2012; trade applications 2014–2016)
ItemFee
Building, valuation $100 to $500$25
Valuation $9,001 to $10,000$180
Valuation $14,001 to $15,000$250
Valuation $24,001 to $25,000$390
$25,001 to $50,000$391 + $10 per $1,000
$50,001 to $100,000$644 + $7 per $1,000
$100,001 to $500,000$994 + $6 per $1,000
$500,001 to $1,000,000$3,234 + $5 per $1,000
Over $1,000,000$5,610 + $7 per $1,000
Electrical, new single-family home$25 plus $0.05 per sq ft
Electrical: service, temporary or generator / utility turn-on$25 / $25
Electrical: additions, basements, garages, rewires$30 first unit, $10 each added unit
Commercial electrical$55 plus 1% of labor and materials
Plumbing fixtures$25 for the first two, $10 each added
Water heater / gas piping / lawn sprinkler$25 / $20 / $50
Mechanical: new single-family / two-family HVAC$100 / $150
Furnace up to 100,000 BTU / A/C up to 3 tons$30 / $30
Gas meter turn-on / fireplace$25 / $20
Grading and drainage permit: Class 1 / Class 2$150 / $250
Demolition: garage or accessory / one-story house$25 / $50
Contractor registration$60 a year

Rather talk it over?

Call 1-855-478-4290 →

Worked example: a $12,000 re-roof falls in the $11,001 to $12,000 band, so the building permit is $210. A new 1,800-square-foot house’s electrical permit is $25 + 1,800 × $0.05 = $115. Above $25,000 the sheet gives a base amount plus a rate per $1,000 without saying where the count starts, and its bands do not chain exactly, so ask the department to price larger jobs. Demolition fees rise to $75 for a house over one story, $100 to $150 for commercial buildings and $200 to $250 for industrial buildings.

Trade permits and who may pull them

Every contractor doing business in East Moline registers each year with the Inspections Department, online through the contractor portal. A complete packet includes:

  • the signed registration form;
  • an East Moline continuous code compliance bond of $10,000 on the city’s form, for every contractor except plumbers, with the original signed bond and power of attorney; bonds on file may be no more than five years old;
  • a certificate of liability insurance for at least $100,000 per occurrence of property damage and $300,000 per occurrence of personal injury;
  • proof of workers’ compensation, or a notarized sworn statement of no employees for a sole proprietor or partnership;
  • the $60 fee, which runs to December 31 and is not prorated;
  • copies of licenses: roofing for general contractors who roof, and the licenses of plumbing, mechanical, electrical and fire-related contractors.

Rather not deal with the building department?

Get a free quote →

If any item lapses during the year, the contractor must re-register and pay another $60. Mechanical, electrical and plumbing contractors may still mail in permit applications, which the city must receive before work begins. Main electrical service work, and electrical permits for rental, commercial or other non-owner-occupied property, must be filed by a licensed electrician registered with the city; mechanical permits for those properties need a licensed, registered mechanical contractor; plumbing permits for those properties must come from a state-licensed plumbing contractor registered with the city.

How to apply for an East Moline building permit

1. Confirm the address is in East Moline

Carbon Cliff has its own forms on the department’s page; unincorporated land goes to Rock Island County.

2. Check zoning and signs

Talk to the Zoning Official before a sign or a project that may need zoning relief.

3. Register, or apply as the owner

Contractors register for $60; owners of record or their written agents may apply.

4. File the application

Use the permit portal, or bring or mail the paper form to 912 16th Avenue or leave it in the front-door mailbox.

5. Pay and receive the permit

Fees follow the valuation schedule and the trade application fees.

6. Call for inspections

Phone the building or plumbing and mechanical inspector as each stage is ready.

Review, corrections and what causes delay

Incomplete registration packets are refused, and the city will not accept a registration until every item is in hand. Commercial projects also need the engineered site plan the application requires, and trade permits for rentals must come from registered, licensed tradespeople. Because the counter is open only in two short windows a day, plan visits for 8 to 9:30 a.m. or 3:30 to 4:30 p.m., or use the portal or mailbox.

Inspections in East Moline

The permit holder is responsible for contacting the Inspections Department when work is ready. Field inspections run between 9:45 a.m. and 3:15 p.m.; call 309-752-1509 for building and electrical inspections and 309-752-1512 for plumbing and mechanical, and leave a message if the inspector is in the field.

Grading and drainage permits bring their own inspections: before any land is disturbed, once erosion controls are installed, as needed during construction, and after final stabilization and landscaping, before temporary sediment controls come out. Class 2 permit holders file weekly erosion control inspection reports and a report after any half-inch rainfall.

Driveway approaches have their own inspection: once the approach is excavated, formed and the wire mesh is in place, call Engineering at 309-752-1540 at least 24 hours ahead to have it inspected before the concrete is poured. Approaches must meet the depth, width and sometimes grade shown in the city’s standard details.

Want this handled start to finish?

Get a free quote →

Illinois building code in East Moline

FEMA’s Community Status Book lists East Moline (community 170587) as participating in the National Flood Insurance Program, with its first flood insurance rate map dated October 15, 1982 and the current map April 5, 2010; the city is not in the Community Rating System. The commercial application asks for each site’s flood plain classification.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Permit search and official resources

For past permits or inspection records, file a Freedom of Information Act request with the city. Print the city’s FOIA request form and drop it off or email it, or submit the request online through the city’s public records portal, which is linked from the city website.

Inspections are where schedules slip.

Get a free quote →

East Moline permit FAQs

Do I need a permit for a shed in East Moline?

Yes, for a utility building over 120 square feet.

Do I need a permit to replace windows or a roof?

Yes. Replacement windows, roofing and siding are all on the city’s residential permit list.

Can a homeowner pull a permit?

Yes, the owner of legal record may apply, though electrical and plumbing work on rentals and other non-owner-occupied property must be filed by registered, licensed trades.

How much is contractor registration?

$60 a year, expiring December 31, with a $10,000 bond for all contractors except plumbers.

Do I need a permit for a new driveway?

Only for the approach in the city right-of-way; the driveway on your own land needs none.

When is the Inspections Department open?

Weekdays from 8 to 9:30 a.m. and 3:30 to 4:30 p.m.; inspectors are in the field from 9:45 a.m. to 3:15 p.m.

Does the city issue permits for Carbon Cliff?

The same office posts Carbon Cliff’s applications and fee schedule, and its contractor registration covers both places.

Simplify East Moline permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in East Moline sooner?

Let Alliance prepare, file, and track your East Moline permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about East Moline permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.