In the Village of Addison, building permits come from the Building Division of the Community Development Department at Village Hall, 1 Friendship Plaza (630-693-7530, building@addison-il.org; Monday to Friday, 8 a.m. to 5 p.m.). All permit applications are filed online through the village’s permit portal. Single-family roof permits and emergency sewer repairs are typically approved within 24 hours; other applications take up to 10 business days for a first review. Common home projects carry flat fees in Chapter 6 of the Village Code, such as $55 for a re-roof or shed and $210 for an in-ground pool.
What requires a building permit in Addison?
Section 6-206 of the Village Code requires a building permit for all work except a short list of exempt items, and the village’s permits page names the home projects that come up most, whether new or a replacement.
New or replacement
- Decks and sheds
- Garages and driveways
- Fences
- Swimming pools
- Room additions and remodels
Replacements on the house
- Windows
- Doors
- Siding
- Roofs
The portal’s permit list adds gazebos, pergolas, hot tubs, patios, furnaces, water heaters, solar panels, standby generators, signs and demolition.
No permit (Sec. 6-206)
- Painting, papering, tiling, carpeting, cabinets and similar finish work
- Replacing countertops without increasing or reconfiguring their length or design
- Tuckpointing (brick repair or replacement is not exempt)
- Retaining walls 18 inches high or less
- Prefabricated pools at one- and two-family homes that are under 24 inches deep and entirely above ground
Also exempt
- Seal coating a single-family driveway
- One private sidewalk, patio or driveway per site of 40 sq ft or less that is not part of a means of egress or an accessible route
- Play structures whose fort area is 50 sq ft or less
- Window awnings without signs that project 30 inches or less from the wall
- Removing and reinstalling a single-family plumbing fixture without rerouting or adding piping
Stopping a leak needs no permit, but once a concealed trap, drain, water, soil, waste or vent pipe has to be removed and replaced, the code treats it as new work that needs a permit and an inspection.
What Addison decides and what the state holds
Addison adopts its own codes by ordinance and sets its permit list, fees, reviews and inspections. Three codes on its list are state ones in their current editions: the Illinois Energy Conservation, Accessibility and Plumbing Codes. Roofing contractors hold a State of Illinois roofing license, and plumbing is done by a plumber licensed by the Illinois Department of Public Health.
Addison building department: who handles permitting
The Building Division of the Community Development Department oversees building permits and code enforcement. Its inspectors cover new construction and redevelopment, inspections for new business licenses, rental housing, annual commercial and industrial inspections, pre-sale inspections of commercial and industrial property, and property maintenance complaints. The Director of Community Development is also the village’s stormwater administrator under the DuPage County ordinance.
Short on time to read all of this?
Get a free quote →Addison lies entirely in DuPage County, with 35,758 residents in the 2025 Census estimates. Unincorporated land around the village is permitted by DuPage County Building and Zoning (421 N. County Farm Road, Wheaton, 630-407-6700), which issues permits only for unincorporated areas.
| Detail | Information |
|---|---|
| Office | Community Development Department, Village Hall, 1 Friendship Plaza, Addison, IL 60101 |
| Phone | 630-693-7530 |
| building@addison-il.org | |
| Hours | Monday to Friday, 8 a.m. to 5 p.m. |
| Applications | Village permit portal (CityView), linked from the Building Permits page |
| Paid in person | Payments over $25,000, cash bonds, letters of credit and performance bonds, at Village Hall |
Addison permit types
Every permit application, building or engineering, is made online. Create an account in the village portal, start the application and upload the plans and documents; the village posts help pages for creating an account, uploading electronic documents and accepting permit conditions. When the owner is not the applicant, the village’s Property Owner’s Authorization Form records the owner’s consent.
Residential permits
Homeowners can use the Instant Permit Program, which the village started in 2000, to receive a permit in one short appointment for smaller home improvement projects. Single-family roof replacements and emergency sewer repairs are typically approved within 24 hours. The village’s homeowner pages give the zoning limits that reviewers check:
- Decks: rear yards only, 5 feet from every lot line and off easements; all accessory structures together may cover no more than 30% of the rear yard, and any part more than 30 inches above grade needs a guard at least 36 inches high. Enclosed or covered decks count as part of the house.
- Sheds and detached garages: rear yards only, 10 feet from the house, 5 feet from lot lines and off utility or drainage easements. A detached garage may be one story, no taller than 17 feet or the house.
- Driveways: asphalt, concrete or paving bricks; curb changes need Community Development approval.
- Fences: up to 6 feet, finished side out, and none in front of the house except a decorative fence up to 10 feet long and 4 feet high.
- Pools: 10 feet from the house, 5 feet from lot lines and 10 feet from overhead wires, inside a fence at least 4 feet high with a self-closing, self-latching gate.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Non-residential projects follow the same portal process and may need review by several disciplines, which can lengthen the review. Engineering permits cover grading and drainage, retaining walls, sewers, water mains and right-of-way work, and driveways and parking lots on commercial, industrial and multifamily sites.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Permits that do not meet the zoning regulations are not approved, so the setbacks above have to work before you file.
- Floodplain. Applications are also checked against the village’s floodplain regulations.
- Stormwater. DuPage County lists Addison as a complete waiver community under the Countywide Stormwater and Floodplain Ordinance, so the village’s own stormwater administrator reviews stormwater applications and issues the Stormwater Certification. The county does not review them unless asked, apart from floodway reviews delegated by the Illinois Department of Natural Resources.
Addison permit costs and fees
Building fees are set in Article 4 of Chapter 6 (Building Code) of the Addison Village Code (the chapter file on the village’s code page runs through June 1, 2026). Section 6-402 covers detached single-family homes; multi-family, commercial and fire district fees sit in other sections. Fees are paid before the permit is issued, and alterations are measured by the area actually altered.
| Project | Fee |
|---|---|
| Fence | $80 |
| Deck | $105 |
| Shed | $55 |
| Detached garage / with driveway | $165 / $210 |
| Driveway or patio (new or replacement); private sidewalks and stoops | $105 each |
| Re-roofing; re-siding; door and window replacement | $55 each |
| Central air or furnace (existing ductwork); electrical service upgrade or repair; standby generator | $105 each |
| Water heater; water softener; lawn irrigation; sewer or water repair | $55 each |
| Above-ground pool without / with heat | $105 / $160 |
| In-ground pool | $210 |
| Demolition of the house / of an accessory structure | $315 / $55 |
| Re-inspections on a flat-fee permit | $30 each |
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Building plan review: new house / addition / alteration | $210 / $105 / $55 per 3,000 sq ft or fraction |
| Building plan review: accessory structure | $30 per structure |
| Engineering review: single unit, single site / additions, alterations and other work | $210 / $100 |
| Permit fee: new house | $630 per 1,000 sq ft or fraction |
| Permit fee: addition | $210 per 500 sq ft or fraction |
| Inspections: new house and additions / alterations and accessory work | $55 / $30 each |
| Certificate of occupancy: new house final / temporary | $210 / $105 |
| Certificate of occupancy: addition or change of use, final | $105 |
| Construction water (new construction only) | $50 |
Worked example. A new 2,400 sq ft detached house pays $210 for building plan review (one 3,000 sq ft block), $210 for the single-site engineering review, $1,890 in permit fees (three 1,000 sq ft blocks at $630), $210 for the final certificate of occupancy and $50 for construction water: $2,570, plus $55 for each inspection and the water meter, which the code prices partly at the market cost of the meter.
Other rules in the same article: additional or preliminary plan reviews cost half the normal review fee; a reinspection on a permit priced by area costs the same as the original inspection and is paid before the next inspection is scheduled; work found finished without a permit pays twice the plan review and permit fee plus every inspection fee; and an inspection between 5 p.m. and 8 a.m. on weekdays, at weekends or on a holiday costs twice the fee plus a $210 administrative fee (Ordinance 21-13).
Trade permits and who may pull them
Addison does not require contractors to register with the village. Instead, every time a contractor applies for a permit online, the application must include the roofing license, the 055 and 058 credentials and a Letter of Intent (LOI), as the permits page puts it. The State of Illinois issues the roofing license, and plumbing work must be done by a plumber licensed by the Illinois Department of Public Health.
Electrical, plumbing and mechanical work is reviewed and inspected under the village permit. Electrical work follows the 2023 National Electrical Code, including NFPA 855 for stationary storage systems; plumbing follows the Illinois Plumbing Code, with only Section 717 and Chapter 11 of the 2024 International Plumbing Code adopted beside it. The village’s Selecting a Contractor page tells owners to make sure every needed permit has been obtained, by the contractor or by the owner, before work starts. The permits page sets out no separate homeowner rule for electrical or plumbing work, so ask the department before doing trade work yourself.
Rather not deal with the building department?
Get a free quote →How to apply for an Addison building permit
Unincorporated parcels nearby go to DuPage County Building and Zoning.
Make sure the design meets the setbacks and floodplain rules; non-compliant designs are not approved.
Sign in or register in the village portal and pick the building use and application type for the work.
Add all plans, the Property Owner’s Authorization Form if needed, and the contractor’s licenses and Letter of Intent.
The portal shows how many reviews the permit needs and who the reviewers are.
Pay through the portal cart and accept the permit conditions; the Permit Conditions document with the inspection list is emailed to the applicant.
Review, corrections and what causes delay
Addison gives up to 10 business days for the initial review. Incomplete applications are not accepted, because the reviewers in each discipline cannot finish without the missing information. If a permit is not approved, a corrections notice is emailed to the applicant only, and the 10-day review starts again from day one when the revised plans are uploaded. Under Section 6-209 the applicant has 30 days to answer written review comments, an application not pursued in good faith is treated as abandoned 90 days after filing (the Building Official may grant written extensions of up to 90 days each, for a fee), and an approval lapses if the permit is not issued within 30 days of the approval notice. Written appeals are due within 10 days of the decision being served.
Inspections in Addison
The type of construction decides how many inspections are needed; every permit needs at least a final inspection. The inspection list is shown in the portal and printed on the Permit Conditions document emailed to the applicant when the permit is issued. Section 6-301 asks for at least 24 hours (one business day) of notice for a Building Division inspection and 48 hours (two business days) for inspections by the Addison Fire Protection District. No inspection is made unless the permit card is displayed and the approved job copy of the plans is on site, and inspections may be withheld until permit fees are paid.
The code’s list includes drain tile and backfill, erosion control, a third-party blower door test, duct sealing and the final electrical, plumbing and building inspections. Allow five working days after the final building inspection for approval of a certificate of occupancy. Work that fails or only partly passes is charged a reinspection fee, paid before the reinspection is booked.
Want this handled start to finish?
Get a free quote →Illinois building code in Addison
Section 6-102 of the Village Code adopts the 2024 International Building, Residential, Existing Building, Fuel Gas, Mechanical, Fire, Property Maintenance and Swimming Pool and Spa Codes (with listed appendices and exclusions) and the 2023 National Electrical Code, plus the state energy, accessibility and plumbing codes and elevator standards. FEMA’s Community Status Book lists the Village of Addison (community 170198, DuPage County) as participating in the National Flood Insurance Program, with flood maps effective August 1, 2019, and in the Community Rating System at class 5, with a 25% flood insurance premium discount.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Addison building permit FAQs
How much is a building permit in Addison?
Many home projects have flat fees: $80 for a fence, $105 for a deck or driveway, $55 for a shed, re-roof or water heater and $210 for an in-ground pool. New houses are priced by floor area.
Can I apply for an Addison permit on paper?
The village asks for all permit applications to be filed online through its permit portal; payments over $25,000 and bonds are made in person at Village Hall.
How long does an Addison permit take?
Single-family roofs and emergency sewer repairs are typically approved within 24 hours; other permits take up to 10 business days for the first review.
Do contractors register with Addison?
No. Instead, each application must include the roofing license, the 055 and 058 credentials and a Letter of Intent.
Do I need a permit for a small above-ground pool?
Not for a prefabricated pool at a one- or two-family home that is under 24 inches deep and entirely above ground. Other pools need a permit, and the pools page asks for a fence at least 4 feet high around the pool or yard.
How tall can a fence be in Addison?
Up to 6 feet, and not in front of the house except a decorative fence up to 10 feet long and 4 feet high. A fence permit costs $80.
Addison permit search and official resources
The village portal shows the status of each application and its inspections, the number of reviews and the reviewers, and lets you download the approved permit. Someone who is not the applicant needs a portal account and must ask Community Development to be added as a contact on the application; for older permit records, call 630-693-7530 or email building@addison-il.org.
Inspections are where schedules slip.
Get a free quote →- Addison building permits
- Addison Building and Zoning
- Village Code Chapter 6, Building Code (fees and adopted codes)
- Addison portal FAQ
- Decks and sheds
- Garages and driveways
- Fences
- Swimming pools
- Selecting a contractor
- DuPage County stormwater administrators and waiver status
- DuPage County Building and Zoning (unincorporated areas)
- IDNR floodway permits
- FEMA Community Status Book, Illinois
Simplify Addison permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Addison sooner?
Let Alliance prepare, file, and track your Addison permits while your crew stays on the job.
More Illinois permitting guides
DuPage County
Read guide →Bartlett
Read guide →Bensenville
Read guide →Algonquin Building Permit Guide
Read guide →Alsip Building Permit Guide
Read guide →Alton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Addison permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.