The City of West Melbourne Building Department, at City Hall, 2240 Minton Road, issues building, electrical, mechanical, plumbing and gas permits inside the city, and every application goes through the City’s online permit portal. Nothing is paid at submission: after plan review, fees are set from a valuation table starting at $70, plus a plan review fee of half the permit fee, and flat fees such as $110 for a residential re-roof or fence.
What requires a building permit in West Melbourne?
West Melbourne requires a permit for electrical, plumbing, mechanical and gas work and for structural work, including exterior doors and windows, roofing and sheds, whatever the job is worth. The Building Department publishes submittal requirements for:
Building and site
- New homes and commercial buildings
- Additions and alterations
- Detached garages, sheds and utility buildings
- Doors, windows and hurricane shutters
- Re-roofs (replacing over 10% of the roof)
- Driveways, pavers and patio slabs
- Fences and block walls
- Screen rooms, pool enclosures and pools
- Demolition and mobile home set-ups
Systems
- Electrical work and solar PV
- A/C change-outs and duct work
- Plumbing, water heaters and solar pool heaters
- Gas lines
- Fire permits (sent on to Brevard County Fire Rescue)
Since July 1, 2026, some small projects under $7,500 at single-family homes, duplexes and townhomes can be exempt under HB 803. Properties in a flood zone do not qualify, and projects cannot be split to avoid a permit. Request the exemption through the city portal before work starts, with the contract or other proof of cost and detailed installation plans. Work started without an approved exemption or a required permit is referred to code enforcement.
West Melbourne building department: who handles permitting
The Building Department reviews plans, issues permits and inspects all permitted residential and commercial construction for compliance with City ordinances and the Florida Building Code. It works under Building Official Dan Ferry. Fire plan review and fire inspections are done by a third party chosen by the City, such as Brevard County Fire Rescue, but fire permits are still submitted through the City.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Local office | 2240 Minton Road, West Melbourne, FL 32904 |
| Phone | 321-837-7776 |
| Hours | Monday–Friday, 8:30 a.m.–3:30 p.m. |
| buildingpermits@westmelbourne.gov (questions and portal web PINs) | |
| Building Official | Dan Ferry |
| Fire permit status | Brevard County Fire Rescue, 321-952-4504 |
West Melbourne permit applications and registration
All permit applications have been filed through the City’s online portal since March 5, 2024; email buildingpermits@westmelbourne.gov for your web PIN. Re-roof permits are no longer accepted by email.
Contractor registration: contractors and sub-contractors not yet registered with the City complete the online Contractor/Private Provider Registration or Sub-Contractor Registration form, and send a copy of their state licence or county competency card, business tax receipt, and workers’ comp (or exemption) and general liability certificates naming the City of West Melbourne as certificate holder. A Sub-Contractor Authorization Form adds trades to a job. Contractors filing fire permits must also be registered with Brevard County.
Owner-builders file the owner-builder disclosure form, the permit application and proof of ownership (deed, tax statement or Property Appraiser printout). On an owner-builder re-roof, a City inspector must do both the dry-in and the nailing inspection; the nail affidavit option is not allowed.
Common supporting forms are the Hold Harmless form (additions, sheds, driveways, fences), the Product Approval Affidavit, the Window and Door Buck Affidavit, the Roof Nail Affidavit and the Residential Swimming Pool, Spa and Hot Tub Safety Act form.
West Melbourne building permit cost
Fees are set by Resolution No. 2026-04, approved by City Council on February 17, 2026, and are paid when the permit is issued. Job value for new structures comes from the latest ICC valuation data or a detailed estimate approved by the Building Official.
Not sure this scope needs a permit?
Get a free quote →| Valuation | Fee |
|---|---|
| Up to $2,000 | $70 minimum |
| $2,001 to $100,000 | $70 plus $5 per additional $1,000 |
| $100,001 to $500,000 | $550 plus $4 per additional $1,000 |
| $500,001 and up | $2,150 plus $3 per additional $1,000 |
A plan review fee of half the building permit fee is added whenever plans are reviewed. For example, a new home valued at $300,000 pays $550 plus 200 × $4, or $1,350, and a $675 plan review fee, before the trade fees below.
| Permit | Fee |
|---|---|
| Re-roof or fence, residential | $110 each (commercial by valuation) |
| Demolition | $125 |
| Moving a building | $200 |
| Fire administrative fee | $100 |
| Permit revision | $50 per half hour |
| Re-inspection | $50 residential, $100 commercial |
| Special inspection (after hours, weekend, holiday) | $250 per inspection |
| Temporary Certificate of Occupancy | $100 |
| Work started before the permit | double the permit fee |
A permit that expires without a final inspection draws a $100 fine, and no further permits are issued to that contractor or applicant until it is paid. Fees can be paid by cash, check or card at the Building Department or online.
Rather talk it over?
Call 1-855-478-4290 →Trade permits in West Melbourne
The Building Department issues electrical, mechanical, plumbing and gas permits. Residential trade work on new buildings is charged per unit or bathroom; commercial trade work follows the valuation table.
| Permit | Fee |
|---|---|
| Electrical, new single-family home | $110 |
| Electrical, solar | $110 |
| Mechanical, new residential | $85 per unit |
| Mechanical change-out, residential | $70 |
| Plumbing, new residential | $70 per bathroom |
| Gas, new residential | $70 per unit |
| Sewer tap inspection | $70 |
| Well, deep or shallow | $110 |
Electrical permits need a riser diagram, wiring drawing or load calculation; solar adds engineered attachment drawings with wind loads and equipment spec sheets. A/C change-outs need the AHRI certificate, and water heaters need the product details and a drawing of new water lines. Fire permit documents for Brevard County Fire Rescue must be flattened and merged into one file or they are rejected.
Rather not deal with the building department?
Get a free quote →How to get a building permit in West Melbourne
Check the address is inside West Melbourne and whether the work needs a permit or may qualify for the HB 803 exemption.
Contractors and sub-contractors register with the City; owner-builders prepare the disclosure form and proof of ownership.
Follow the City’s requirements for your project type. Surveys must be full-size and to scale, and sealed building plans must state compliance with a 150 mph design wind speed.
Upload the application and digital plans; no fee is due at submission.
The plans examiner reviews against City ordinances and the Florida Building Code, then sets the fees.
Pay at the Building Department or online. Record the Notice of Commencement if the job is over $5,000 before the first inspection.
Schedule through the portal by 3:00 p.m. for the next business day.
Inspections in West Melbourne
City inspectors inspect all permitted residential and commercial construction between 7:00 a.m. and 2:30 p.m., and take questions from 2:30 to 3:30 p.m. at 321-837-7776. Inspections booked through the portal by 3:00 p.m., Monday to Friday, go on the next business day’s schedule.
- Re-roofs: no shingles may go on before the City’s dry-in inspection, and the Roof Nail Affidavit must be on site. If the dry-in was not inspected by the City, an engineer’s letter is required.
- Windows and doors: the Window and Door Buck Affidavit must be on site at the final inspection.
- Sewer tie-ins: inspections by Jacobs are done Monday to Thursday only.
- Fees: re-inspections cost $50 for residential and $100 for commercial permits, and after-hours or weekend inspections must be arranged 2 days ahead.
Local West Melbourne details that matter
Canals: if a fence or pool site is next to a Melbourne-Tillman Water Control District canal, a District permit is needed for temporary use of its right-of-way.
Driveways: a City use permit may be needed when a driveway crosses the City right-of-way.
Screen rooms and pool enclosures: must be built by a licensed contractor, with drawings signed and sealed by an engineer or architect.
Want this handled start to finish?
Get a free quote →Mobile homes: set-ups need a plot plan, the park’s written authorization and a penetrometer test affidavit, and a Brevard County impact fee may apply.
Florida building code
The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules
West Melbourne permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
West Melbourne permit FAQ
Who handles building permits in West Melbourne?
The City of West Melbourne Building Department issues building permits for work inside the city.
How much is a building permit in West Melbourne?
Fees follow job value: $70 up to $2,000, then $70 plus $5 per $1,000 up to $100,000 and $550 plus $4 per $1,000 up to $500,000, with a plan review fee of half that amount when plans are reviewed.
How much is a re-roof permit?
$110 for a residential re-roof. A permit is needed when more than 10% of the roof is replaced, and a City dry-in inspection comes before shingles go on.
Inspections are where schedules slip.
Get a free quote →Do I need a permit for a shed or fence?
Yes. Sheds count as structural work, which needs a permit at any value, and a residential fence permit is $110.
Do I pay when I apply?
No. Fees are worked out after plan review and paid before the permit is issued.
Can a homeowner pull a permit?
Yes, as an owner-builder, with the disclosure form and proof of ownership. Owner-builder re-roofs need both dry-in and nailing inspections by a City inspector.
When can I schedule an inspection?
Book through the portal by 3:00 p.m. on a weekday for the next business day.
Simplify West Melbourne permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in West Melbourne sooner?
Let Alliance prepare, file, and track your West Melbourne permits while your crew stays on the job.
More Florida permitting guides
Brevard County
Read guide →Cape Canaveral
Read guide →Cocoa Beach
Read guide →City of West Palm Beach Building Permit Guide
Read guide →West Park Building Permit Guide
Read guide →City of Weston Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about West Melbourne permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.