The City of Parkland Building Department, at City Hall, 6600 University Drive, issues building permits and performs structural, electrical, plumbing and mechanical inspections, and all permits are filed and scheduled in My Government Online (MGO). Since July 1, 2026 the permit and plan review fee is $100 plus 2.5% of construction cost for homes, and each inspection is billed separately at $77.32.
What requires a building permit in Parkland?
The Building Department publishes a permit checklist for each common project type, which is the best guide to what it permits:
Residential
- New homes, duplexes and townhouses; additions
- Renovations and alterations
- Roofing, windows, doors and shutters
- Pools, screen enclosures, pergolas and outdoor kitchens
- Fences, driveways, pavers and slabs
- A/C replacement and water heater replacement
- Generators, solar panels and electric service changes
- Plumbing fixture replacement and irrigation
Commercial and other
- New commercial and multifamily buildings
- Commercial additions and interior alterations
- Docks, seawalls, boat ramps and bulkheads
- Signs, antennas, awnings, canopies and tents
- Fire alarms, hoods and fire suppression
- Low voltage and LP gas installations
- Demolition
From July 1, 2026, work under $7,500 on an owner’s single-family home can be exempt on a written request with documentation, but not electrical, plumbing, structural, mechanical or gas work, work in a flood hazard area, or a project split up to qualify. A retaining wall spanning several single-family, two-family or townhouse lots needs only one permit.
Short on time to read all of this?
Get a free quote →Parkland building department: who handles permitting
The Building Department, part of Development Services, issues permits from approved plans for residential and commercial projects. Its certified inspectors carry out structural, electrical, plumbing and mechanical inspections, schedule and track zoning, landscaping, engineering and fire inspections, and issue certificates of occupancy. William Tracy is the Building Official. The department also registers waste haulers.
| Detail | Information |
|---|---|
| Local office | City Hall, 6600 University Drive, Parkland, FL 33067 |
| Phone | 954-753-5447 |
| Hours | Monday-Thursday, 7:00 a.m.-6:00 p.m. |
| Building Official | William Tracy |
| Landscaping plan review and inspections | Tuesday-Thursday, 7:30 a.m.-3:30 p.m. |
| MGO help desk | 866-957-3764, option 1 |
Parkland permit types and MGO filing
Parkland moved from Central Square (TRAKiT) to My Government Online. Contractors must register again in MGO, uploading new certificates of liability and workers’ compensation and their contractor’s licence, before they can submit permits, schedule inspections or have permits issued. Files must follow the city’s published naming conventions.
Owner-builders must appear in person to sign the building permit application. Applicants who believe they are entitled to expedited processing by law must say so, with the statutory basis, when they submit. An early-start (pre-permit) permit is available for $300.
Parkland building permit cost
Parkland’s fee schedule effective July 1, 2026 splits each permit into a plan review and application fee, still based on construction cost, and a separate charge for each inspection. The construction cost is the greatest of the applicant’s figure, a detailed estimate or the RS Means value (currently $180 per sq ft under air).
Not sure this scope needs a permit?
Get a free quote →| Project | Fee |
|---|---|
| Work up to $1,000 | $100 minimum |
| Residential work over $1,000 | $100 plus 2.5% of the total construction cost |
| Commercial work over $1,000 | $100 plus 4.0% of the total construction cost |
| Each inspection, per trade | $77.32 |
| Roofing, siding, windows, doors and garage doors | 2.5% residential / 4.0% commercial, $90 minimum |
| Pools, screen enclosures, fences, walls and paving | 2.5% / 4.0%, $270 minimum, plus engineering $90, zoning $100 and landscaping $100 |
| Water heater or A/C change-out | $90 plan review plus $77.32 per inspection |
| Generator | $360 minimum plan review plus inspections |
| Certificate of occupancy | $100 |
| Certificate of completion | $75 |
Broward County and state surcharges are added: $0.52 per $1,000 for the Board of Rules and Appeals, $0.68 per $1,000 for document imaging, $0.60 per $1,000 for construction education and technology, and 1.5% and 1.0% of the permit fee. Card payments carry a 4.5% fee. A change of contractor costs $80 per discipline, and a third or later plan review $95 per discipline. Work without a permit costs the permit fee plus $300 for a contractor or plus $150 for a homeowner, or double the fee if that is more. Residential private provider jobs get $90 off per plan review discipline and $77.32 off per inspection replaced.
Rather talk it over?
Call 1-855-478-4290 →Trade permits in Parkland
Electrical, plumbing and mechanical work each have residential and commercial checklists, and the city’s certified inspectors handle each trade. Electrical, plumbing and mechanical permits carry a $90 non-refundable plan review fee (fire fees extra), then $77.32 for each inspection.
- Electrical: service repairs, temporary service, transfer switches, site and landscape lighting are each $77.32 per inspection; EV chargers and solar systems pay $90 plan review per discipline plus inspections (solar has a 2-inspection minimum).
- Plumbing: residential irrigation is $85 for the first 12 heads plus $4 per head and $50 per pump; fire sprinklers are $110 for the first 12 heads plus $4 each.
- Mechanical: each A/C change-out system is $90 plan review plus inspections; hoods and fire suppression systems are $77.32 per inspection.
- Fire: fire permits start at $80, fire plan review at $231.98 and fire inspections at $222.26 in the Building Department schedule (the Fire Department’s FY 2026 fee exhibit lists $246.04 for plan review of 2,500 sq ft and under), under the city’s fire contract.
How to get a building permit in Parkland
Confirm the parcel is inside Parkland and open the city checklist for your project type.
Create an MGO account; contractors register with current liability, workers’ compensation and licence documents, and owner-builders plan to sign in person.
Assemble the application, plans and checklist items, naming every file to the city’s conventions.
Submit in MGO and respond to comments; a third review cycle costs $95 per discipline.
Pay the plan review, permit and surcharge fees, and record the Notice of Commencement for jobs over $5,000 ($15,000 for A/C change-outs).
Request inspections in MGO and finish with the certificate of occupancy or completion.
Rather not deal with the building department?
Get a free quote →Inspections in Parkland
Request inspections through My Government Online, which needs an account. The permit card posted on the job site is the record of approvals; a failed inspection gets a red tag on the permit board listing the code sections and violations, and results can also be searched in MGO. Inspectors can be reached at 954-753-5447 between 7:30 and 8:00 a.m. to discuss a scheduled inspection or set a specific appointment.
Each inspection, including re-inspections after a failure and partial inspections, is billed at $77.32 per trade. Engineering inspections cost $85, zoning $90 and landscaping $70. After-hours inspections are $125 an hour per trade with a 3-hour minimum. A temporary certificate of occupancy costs $750 for 90 days or $900 for 180 days.
Florida building code
The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules
Parkland permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Want this handled start to finish?
Get a free quote →- Florida Building Commission - current code
- Parkland fee schedule
- Inspection FAQs
- Permit application / online portal
- Building / permitting department
- Parkland Building Department fee schedule effective July 1, 2026 (PDF)
- Parkland permit checklists
Parkland permit FAQ
Who issues building permits in Parkland?
The City of Parkland Building Department issues local building permits inside city limits. Call 954-753-5447.
How much is a building permit in Parkland?
For homes, $100 plus 2.5% of the total construction cost for plan review and application, plus $77.32 for each inspection and county and state surcharges.
What permit system does Parkland use?
Parkland now uses My Government Online (MGO); the city states that the former Central Square/TRAKiT system is no longer available, and contractors must re-register.
Do I need a permit for a water heater or A/C replacement?
Yes. Each has a city checklist and costs $90 for plan review plus $77.32 per inspection.
Inspections are where schedules slip.
Get a free quote →Can a homeowner pull a permit in Parkland?
Yes, as an owner-builder, but you must appear in person to sign the building permit application.
What are Parkland Building Department hours?
Monday through Thursday, 7:00 a.m. to 6:00 p.m.
Simplify Parkland permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Parkland sooner?
Let Alliance prepare, file, and track your Parkland permits while your crew stays on the job.
More Florida permitting guides
Broward County
Read guide →City of Coconut Creek
Read guide →Cooper City
Read guide →Pasco County Building Permit Guide
Read guide →Pembroke Pines Building Permit Guide
Read guide →Pensacola Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Parkland permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.