Skip to main content
Municipal GuideFloridaPensacola · Escambia County

Pensacola, Florida Building Permit Guide

To get a building permit in Pensacola, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

How to get a building permit in Pensacola, FL - MGO filing, local fees, trade sub-permits, inspections and official Building Inspections resources.

Authority: City of Pensacola Building Inspections DivisionCode: Florida Building Code, 8th Edition (2023)Phone: 850-436-5600
Authority
City of Pensacola Building Inspections Division222 W. Main Street, Fifth Floor, Pensacola, FL 32502
Apply Online
MyGovernmentOnline (MGO)
Code
FBC, 8th Ed. (2023)Effective Dec. 31, 2023

The City of Pensacola Building Inspections division, on the fifth floor of City Hall at 222 W. Main Street, reviews plans, issues building permits and inspects work inside the city, and every application with plan review is filed in My Government Online (MGO). A new single-family home is charged $0.15 per square foot plus half that for plan review and a $40 application fee.

What requires a building permit in Pensacola?

Pensacola Building Inspections enforces the Florida Building Code and recommends contacting the division before you start work on your property. Its forms show the range of permits it issues:

Building permits

  • New homes, duplexes and commercial buildings
  • Additions and alterations
  • Pools and accessory structures
  • All storage sheds, site-built or portable
  • Doors, windows and siding
  • Roofing
  • Demolition and house moves
  • Change of occupancy

Sub-permits and other

  • Electrical, including dock power and temporary or early power
  • Mechanical, plumbing and gas
  • Irrigation
  • Fire protection systems
  • Extended construction work

For residential new dwellings, additions, pools, accessory structures, house moves and manufactured homes, a Zoning and Site Approval application must be approved first; the building permit is then filed as an “Add to Existing” application under the zoning project. Since July 1, 2026 the city also takes requests for state permit exemptions on its Permit Exemption Application.

Pensacola building department: who handles permitting

Building Inspections, part of the city’s Development Services Department, handles plan review, permits and on-site inspections. Jonathan Bilby is the Building Inspections Director and signs the division’s policies as Building Official. Walk-in customers are seen from 8:00 a.m. to 12:30 p.m. if they arrive by 12:15 p.m.; you can join the line or book an appointment online. Meetings with the Building Official, deputy or a specialist outside walk-in hours must be booked at least 24 hours ahead, and inspectors are best met by appointment between 2:30 and 3:30 p.m.

Short on time to read all of this?

Get a free quote →
Pensacola permitting contact
DetailInformation
Local office222 W. Main Street, Fifth Floor, Pensacola, FL 32502
Phone850-436-5600
Emailinspections@cityofpensacola.com
Hours7:00 a.m.-4:00 p.m.; walk-ins 8:00 a.m.-12:30 p.m.; appointments 12:30-3:30 p.m.
MGO portal help866-957-3764
Building Inspections DirectorJonathan Bilby

Pensacola permit types and MGO filing

Every application with plan review is filed in MGO as original PDF files; paper plans have not been accepted since April 1, 2020, and every required document, including the Notice of Commencement, must be uploaded. Paper is accepted only for owner-builder forms. Separate application forms exist for building, demolition, dock power, electrical, extended construction work, doors, windows and siding, fire protection systems, gas, irrigation, mechanical, plumbing and roofing permits, though they are not needed when applying online.

Contractor registration: send a complete package through MGO or by email to ContractorRegistration@cityofpensacola.com; renewals are uploaded to your MGO contractor page. A Letter of Authorization to Sign for Permits lets someone else sign for the licence holder, and an Assumption of Project form is used when a new contractor takes over a job.

Owner-builders file the Owner Builder Disclosure (and the separate electrical disclosure for electrical work). Portable sheds that are exempt from contracting can be permitted by the owner, a tenant with the owner’s notarized agreement, or a shed company with a Business Tax Receipt and insurance.

Pensacola building permit cost

Fees are set in Chapter 7-14 of the City Code, and the city publishes simplified fee schedules for each type of project:

Not sure this scope needs a permit?

Get a free quote →
Pensacola simplified permit fees
ProjectFee
New single-family home or duplex$0.15 per sq ft
New commercial building$0.15 per sq ft
Residential alteration$7.50 per $1,000 of cost (labor and materials)
Initial plan reviewHalf the permit fee (plus the application fee on alterations and commercial work)
Administrative application fee$40 per permit
Revision plan review$50
Additional inspections not covered by the base fee$50 each
Roof permit$100, plus $50 per inspection after 2
Zoning review, home or duplex$100, plus $100 per zoning compliance inspection
Zoning review, commercial$450 plus $300 per acre
Residential curb cut (engineering)$75

For example, a new 2,000 sq ft home has a building permit fee of $300, a plan review fee of $150 and a $40 application fee, before zoning review, trade sub-permits and state surcharges of 1% and 1.5% (rounded up to the next dollar). Cards carry a 3% service charge.

Trade permits in Pensacola

All sub-permits for mechanical, electrical, plumbing, gas, roofing and fire-system work on a project must be submitted online in MGO as an “Add-to-Existing” permit type. Each carries the $40 application fee, and residential trade inspections are $50 each:

  • Electrical: a 200 A service is $95, plus $50 per inspection. Generators need the Electrical Generator ATS Affidavit.
  • Plumbing: a $50 base fee covers 10 fixtures, then $2 per extra fixture; a sewer connection is $50.
  • Mechanical and gas: $50 per inspection.
  • Roofing: $100, with the city’s roofing affidavit and roofing photos guide.

Rather talk it over?

Call 1-855-478-4290 →

How to get a building permit in Pensacola

1. Confirm jurisdiction and scope

Confirm the property is inside Pensacola and identify the building and trade permits required for the work.

2. Get Zoning and Site Approval

For new homes, additions, pools, accessory structures, house moves and manufactured homes, get the zoning application approved first.

3. Register and prepare

Register as a contractor in MGO, or prepare the owner-builder disclosure, and assemble original PDF plans and the Notice of Commencement.

4. Submit in MGO

File the building permit as Add to Existing under the zoning project, with each trade sub-permit added the same way.

5. Review and pay

Respond to correction requests in MGO, then pay the permit, plan review and application fees.

6. Inspect and close out

Schedule inspections in MGO or by IVR, through to the building final.

Inspections in Pensacola

Schedule inspections online through MGO, in your permit, or through the city’s IVR system at 866-957-3764, option 5. A Request for Call Ahead Policy covers asking for a specific time or for the inspector to call first. Under the Right of Entry Policy, the contractor must get the owner’s express permission for an inspector to enter an occupied home, go on roofs or go behind closed gates; otherwise the inspection can fail for “No Access”.

Rather not deal with the building department?

Get a free quote →

For a new one- or two-family home the city’s list runs: temporary power pole, erosion control (with the footing), footing, slab, plumbing rough-in, wall and roof sheathing, an optional strapping inspection, windows and doors, brick ties (brick veneer only), plumbing stack-out, mechanical, electrical and gas rough-ins, framing, insulation, roofing final, temporary power, the plumbing, mechanical, electrical and gas finals (power on for the electrical final), and the building final.

Commercial permits, and residential permits issued before July 1, 2026, are valid for 180 days. Residential permits issued on or after July 1, 2026 are valid for one year or until the next building code cycle starts, whichever is longer. Extension and renewal requests are uploaded to the permit in MGO and carry a fee.

Local Pensacola details

Code change: projects submitted on or after December 31, 2026 must meet the 2026 Florida Building Code. Wind design follows ASCE 7-22, which you can check with the ASCE 7 Hazard Tool.

Sheds: every storage shed needs a permit with a scaled site plan. Site-built sheds over 400 sq ft must be designed by a Florida-licensed engineer; portable sheds need pre-engineered plans with tie-down details.

Historic demolition: demolitions that need historic review use the city’s Historic Demolition Review Application alongside the demolition permit.

Florida building code

The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules

Frequently asked questions

Who issues building permits in Pensacola?

The City of Pensacola Building Inspections division, at City Hall, 222 W. Main St., Fifth Floor. Call 850-436-5600.

How much is a building permit for a new house in Pensacola?

$0.15 per square foot, plus plan review at half that and a $40 application fee. A 2,000 sq ft home works out to $300 plus $150 plus $40, before zoning, trade permits and surcharges.

Want this handled start to finish?

Get a free quote →

Do I need a permit for a shed in Pensacola?

Yes. The city requires a permit for all storage sheds, with a scaled site plan; portable sheds also need pre-engineered plans with tie-down details.

How do I apply for a Pensacola building permit?

Create an account and submit the application and PDF plans in My Government Online (MGO). Paper plans have not been accepted since April 1, 2020.

How long is a permit valid?

Residential permits issued since July 1, 2026 last one year or until the next code cycle; commercial permits last 180 days.

How do I schedule an inspection?

In MGO or by IVR at 866-957-3764, option 5.

Pensacola permit search and official resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Inspections are where schedules slip.

Get a free quote →

Simplify Pensacola permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Pensacola sooner?

Let Alliance prepare, file, and track your Pensacola permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Pensacola permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.