In Milton, building work starts with an Application for Development Approval at the City Planning & Development Department, 5438 Alabama Street; once approved, the form authorizes the Santa Rosa County Building Official to issue the building and trade permits through the County’s MyGovernmentOnline portal. City plan review for a new home is $8 per 100 sq ft, and the City approval is valid for 6 months.
What requires approval in Milton?
New construction, additions, renovations, site changes and changes of occupancy can require Milton development approval before the County building permit. The City publishes forms for development approval, change of use, driveways, fences, land disturbance, signs, temporary uses and other local planning actions.
When a new building is built, an existing building is renovated or altered, or the occupancy changes, plans must go to the Milton Fire Department for life-safety review before a building permit can be issued. The plans are submitted with the development approval application to the City Planning Department.
After City authorization, the actual building, plumbing, electrical, mechanical and related construction permits are handled through Santa Rosa County.
City approvals
- Development approval for new buildings, additions, renovations and site changes
- Change of use
- Driveways, with a final inspection
- Fences and signs, including wind signs
- Land disturbing or site development
- Tree removal (protected and heritage trees)
- Temporary uses
- Downtown historic district work
County permits
- Building permits for new construction, remodels and structural changes
- Electrical, plumbing and mechanical permits
- Right-of-way work on county roads
- Septic systems go to the Florida Department of Health
Short on time to read all of this?
Get a free quote →Milton building department: who handles permitting
| Detail | Information |
|---|---|
| City Planning | 5438 Alabama St., Milton, FL 32570 · 850-983-5440 · Monday to Friday, 7:30 a.m. to 4:30 p.m. |
| County Permitting | 6051 Old Bagdad Hwy., Suite 202, Milton, FL 32583 · 850-981-7000 · srcpermits@santarosa.fl.gov |
| County hours | Monday to Friday, 8:00 a.m. to 4:00 p.m. |
Milton and Santa Rosa County permit types
Milton publishes local applications for development approval, change of use, driveways, fences, land disturbance and signs. The City Fire Department reviews, permits and inspects commercial fire alarm, fire suppression and automatic sprinkler systems installed within Milton.
Santa Rosa County handles the building permit and the construction trade permits, filed through MyGovernmentOnline. The County needs a copy of the City of Milton approval before it issues a permit for development that affects the site, such as new buildings, additions, parking lot changes and pools.
The County moved to My Government Online in May 2022. Applicants create an account, and contractors must also “apply for registration” in the portal and upload their licence documents before they can obtain permits; accounts from the old system did not carry over.
Permit and review fees in Milton
Milton charges its own planning, stormwater and fire-prevention review fees under the City Schedule of Fees (Resolution 1551-22, adopted September 13, 2022). The County building permit fee is separate and paid to Santa Rosa County.
| Project | Fee |
|---|---|
| Residential plan review, including manufactured homes | $8 per 100 sq ft of project area |
| Commercial site plan (building) | $9 per 100 sq ft to 5,000 sq ft, then $8 per 100 sq ft; $120 minimum |
| Concurrency determination / comprehensive plan review (commercial and subdivisions) | $180 each |
| Resubmittal | $180 each |
| Stormwater review, single-family by owner | $60 |
| Accessory building, pool or demolition (residential) | $60 each |
| Fence, interior / corner or next to an easement | $18 / $30 |
| Driveway change / new driveway | $30 / $60 |
| Sign | $0.60 per sq ft, $60 minimum |
| Land disturbing or site development permit | $60 |
| Tree removal (protected or heritage) | $30 for 1–2 trees; $12 per tree for 3 or more |
Not sure this scope needs a permit?
Get a free quote →For example, City plan review for a 2,000 sq ft house is $160, on top of the County building permit. Applicants also pay the City engineer’s costs where engineering review is needed, and a zoning or code compliance letter costs $125.
Electrical, plumbing, mechanical and fire systems
Plumbing, electrical and mechanical permits are issued by Santa Rosa County after the City development approval.
Commercial fire alarm, fire suppression and automatic sprinkler systems are permitted by the Milton Fire Department instead. State-licensed system contractors submit 2 sets of system drawings with the Application for Fire Prevention Permit to the City Planning Department. Fire fees:
| Permit | Fee |
|---|---|
| Life safety plan review | $60 for the first 10,000 sq ft, plus $6 per additional 1,000 sq ft |
| Fire sprinkler system | $60 for the first 100 heads, plus $1 per head |
| Fire suppression system | $35 base; hood suppression $4 per nozzle |
| Fire alarm system | $4 per device |
| Commercial kitchen hood, fire department connection or elevator | $36 each |
| Minimum life safety / fire prevention fee | $60 |
Rather talk it over?
Call 1-855-478-4290 →Alliance handles electrical permit expediting for contractors here. More on this: who pulls the electrical permit.
Application documents and review sequence
The City development application requests project address, parcel ID, description of work, zoning and future land use, setbacks, lot coverage, structure height and related site information. The approved form becomes Milton's authorization for Santa Rosa County to proceed with building permit issuance.
Santa Rosa County then reviews the construction plans and supporting documents for its permit, with a copy of the City approval.
For work inside an existing commercial space, the Planning and Fire Departments both review the plans. The Requirements for Review of Commercial Development Approval ask for plans drawn to a stated scale showing the whole occupancy, the walls, ceilings and exits being changed, door widths, swings and hardware, fire-rated walls, exit signs, emergency lighting and fire extinguisher locations (at least one 2A10BC extinguisher), plus licensed shop drawings for any sprinkler, alarm or kitchen hood work. Incomplete drawings are returned.
How to apply: 6-step Milton process
Check the zoning, setbacks and other site rules for the property.
Submit the City application and obtain municipal authorization for the proposed work.
For new commercial work, renovations or occupancy changes, satisfy Milton Fire Department life-safety requirements.
File the building and trade permit package with the County Building Department.
Follow the County inspection sequence for the issued building and trade permits.
Complete required City Planning and fire/life-safety finals before the County occupancy closeout when applicable.
Rather not deal with the building department?
Get a free quote →Inspections for Milton projects
Santa Rosa County performs the construction and trade inspections for the permits it issues.
The City still has to approve its own finals before the County issues a certificate of occupancy: a Life Safety Code inspection and Planning site inspection for commercial property, and a Planning site inspection for residential property.
Local Milton details that matter
Milton development approval is valid for 6 months unless otherwise noted, so file the County permit package before it lapses. If the City approval is later invalidated, the County rescinds the building permit after written notice from the City.
New businesses: the Fire Department inspects every new business before the City issues its occupational licence, starting with an application at City Hall. A business that is a change of occupancy is treated as a new occupancy and is also reviewed by the Santa Rosa County Building Department.
Historic district and boards: work downtown uses the City’s Downtown Historic Application, and projects may go to the Historic Preservation Board, Technical Review Committee, Milton Planning Board or Board of Adjustment.
Burn permits: burning residential yard trash needs a Fire Department burn permit, issued after a site visit and good for one day only.
Florida building code
The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules
Milton permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Want this handled start to finish?
Get a free quote →- Florida Building Code
- Santa Rosa County Permitting
- Milton fire review and permits
- Milton Planning & Development
- Milton development approval form
- Milton forms and permits
- Santa Rosa County electronic plan requirements
- Milton fee schedule
- Milton fire prevention permit fees
- Milton requirements for commercial development review
- Santa Rosa County: obtain a permit (MyGovernmentOnline)
Milton permit FAQs
Who issues the building permit in Milton?
Santa Rosa County, after the City provides the required development authorization.
Does Milton review commercial fire systems?
Yes. The City Fire Department reviews, permits and inspects commercial fire alarm, suppression and sprinkler systems.
Inspections are where schedules slip.
Get a free quote →Is a County final enough for occupancy?
Not always. The City development approval form requires specified Planning and life-safety final inspections before County occupancy approval.
How much does City review cost in Milton?
Residential plan review is $8 per 100 sq ft; commercial site plans start at $9 per 100 sq ft with a $120 minimum. The County building permit fee is extra.
Do I need a City permit for a fence or driveway in Milton?
Yes. The City issues fence permits ($18 interior, $30 on a corner or next to an easement) and driveway permits ($30, or $60 for a new driveway).
How long is a Milton development approval valid?
Six months unless the approval says otherwise.
Simplify Milton permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Milton sooner?
Let Alliance prepare, file, and track your Milton permits while your crew stays on the job.
More Florida permitting guides
Santa Rosa County
Read guide →Pensacola
Read guide →Crestview
Read guide →Minneola Building Permit Guide
Read guide →City of Miramar Building Permit Guide
Read guide →Monroe County (Florida Keys) Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Milton permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.