Inside Selma city limits, permits come from the City of Selma Building Division of the Community Development Department, whose counter is in City Hall at 1710 Tucker Street (559-891-2208). The division reviews and approves building plans, issues building, electrical, mechanical and plumbing permits, and inspects work under construction. Applications are filed through the city’s OpenGov permit portal, and inspections are requested on a 24-hour phone line by 3:30 p.m. for the next day.
What requires a building permit in Selma?
Selma’s rule is broad: a building permit is needed whenever a building or structure, or any electrical, plumbing or mechanical system, is erected, built, enlarged, altered, repaired, moved, improved, removed, converted or demolished. Cosmetic work such as painting, floor coverings and trim never needs one, and the Building Division posts a handout listing 19 kinds of work that are exempt. For anything not clearly on that list, the division asks owners to call 559-891-2208 before starting.
No permit (city handout)
- Detached accessory structures under 120 square feet
- Window awnings on a dwelling projecting no more than 54 inches
- Window replacements that keep the existing frame, nailing flange and weather protection
- Carpet, tile and other floor coverings, decorative interior tile, and floor sheathing repairs of up to 10 square feet
- Replacing an existing fence with the same materials in the same place (every new fence needs a permit)
- Retaining walls under 4 feet, measured from the bottom of the footing, with no surcharge
- Platforms, walks and driveways no more than 30 inches above grade and not over a basement or lower story
- Movable cases, counters and partitions up to 5 feet 9 inches high
- Above-ground prefabricated pools of 5,000 gallons or less at a single-family home
- Repairing or replacing toilets and faucets; replacing outlets and switches in existing boxes, and breakers or fuses (a main disconnect still needs a permit)
- Portable appliances, cord-and-plug equipment, holiday lighting and replacement appliance parts that keep the original listing
Plans required
- New construction of any kind
- Major remodels
- Patio covers and carports
- Swimming pools
- Solar systems
Driveway aprons and approaches and repairs to public sidewalks are handled by Public Works (559-891-2215). Fire sprinkler, fire alarm and kitchen hood systems need a separate fire permit from the Selma Fire Department whenever a building is built with one, and a fire permit may also be required when a system is enlarged, altered, moved or removed.
What Selma decides and what the state holds
Selma sets its own permit, user and development impact fees, runs plan check and inspections through its Building Division, and controls land use through its zoning ordinance, Planning Commission and City Council. The Building Division also inspects existing buildings for unsafe or dilapidated conditions and can start abatement under the Uniform Code for the Abatement of Dangerous Buildings. Contractor licensing and the technical building standards are set by the state.
Short on time to read all of this?
Get a free quote →Selma building department: who handles permitting
The Building Division of Selma’s Community Development Department issues building and trade permits for property inside the city, and Code Enforcement works within the same division. Fresno County handles unincorporated land around Selma, and the city’s inspection page lists Fresno County Building and Planning (559-600-4078) among its contacts.
| Detail | Information |
|---|---|
| Office | Building Division permit counter, City Hall, 1710 Tucker Street, Selma, CA 93662 |
| Phone / fax | 559-891-2208 / 559-896-1068 (City Hall main line 559-891-2200) |
| Counter hours | Monday to Friday, 8 a.m. to 5 p.m. (one city page lists a noon to 1 p.m. closure) |
| Plan submittals by email | building@cityofselma.com |
| Inspection request line | 559-891-2220, 24 hours |
| Planning and zoning | 559-891-2209; virtual planning counter by appointment |
| Fire plan review | Selma Fire Department Prevention Bureau, Fire Administration Building, 1711 Tucker Street, 559-891-2265 |
| Online filing | City of Selma OpenGov permit portal (the home page also links the ViewPoint Cloud building permit site) |
Selma permit types
Selma takes building permit applications through its online portal, and the city’s plan submittal requirements also accept plans by email at building@cityofselma.com. Anyone applying on a homeowner’s behalf must add a homeowner authorization form. The forms page carries the paper building permit application, the building plan submittal requirements (revised November 2021), a sample plot plan and an owner-builder disclosure form. When a permit is ready, the owner, the owner’s contractor, or an agent carrying a signed letter from the owner pays the fees and signs for the permit in person at the City Hall counter.
Residential permits
- New homes and additions need plans: 3 complete sets under the plan check page, or two sets on 11-by-17 sheets or larger plus a letter-size plot and floor plan under the submittal requirements sheet. The set covers the plot, foundation, floor, elevation, section, detail and Title 24 energy sheets, with structural calculations and a soils report where required.
- Patio covers, carports, pools and major remodels also need plans; the patio detail packet covers common patio covers.
- Re-roofs use the city’s residential re-roof form.
- Solar needs 2 sets of 11-by-17 plans plus an extra plot plan for the Fresno County Assessor, dropped off in person or mailed, with a copy of the signed contract.
- Fences are covered by the city’s residential fence heights sheet, and the forms page also carries a fence variance application.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial plans are filed in 5 complete sets, plus a digital copy for large projects. Commercial solar takes 3 full-size sets with structural calculations. New buildings and tenant improvements with sprinklers, alarms or hood systems also go to the Fire Prevention Bureau with a fire permit application; sprinkler changes of 20 heads or fewer are handled over the counter.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning entitlements. The Planning Division processes general plan amendments, zone changes, conditional use permits, variances, parcel and tract maps, annexations, site plan review, home occupation permits, sign reviews and landscape reviews.
- Preliminary review. The city offers a preliminary project review application, and its zoning update describes a preliminary development review that sets project conditions up front.
- Engineering. Subdivisions, parcel maps, and improvement and drainage plans are reviewed by Engineering against the city standards (revised 2026) and standard specifications.
- Demolition. The city uses a demolition permit release form and lists the San Joaquin Valley air district (559-497-1040).
Selma permit costs and fees
The City Council adopted Selma’s user fees on November 2, 2021 by Resolution No. 2021-66R, after a public hearing on August 16, 2021; development-related fees took effect 60 days after adoption. For building plan check and inspection, the resolution refers to Appendix D of the July 21, 2021 user fee study by Revenue & Cost Specialists, which recommended raising those fees by 45% to recover their full cost. Appendix D prints two valuation tables, “current” and “suggested”, and the posted documents do not say which column the counter charges today. The building page says fees are calculated after department review of the project, so ask the Building Division (559-891-2208) which table applies.
| Total valuation | Current column | Suggested column |
|---|---|---|
| $1 to $500 | $23.50 | $34.00 |
| $501 to $2,000 | $23.50 + $3.05 per extra $100 | $34.00 + $4.00 per extra $100 |
| $2,001 to $25,000 | $69.25 + $14.00 per extra $1,000 | $94.00 + $20.00 per extra $1,000 |
| $25,001 to $50,000 | $391.75 + $10.10 per extra $1,000 | $554.00 + $15.00 per extra $1,000 |
| $50,001 to $100,000 | $643.75 + $7.00 per extra $1,000 | $929.00 + $10.00 per extra $1,000 |
| $100,001 to $500,000 | $993.75 + $5.60 per extra $1,000 | $1,429.00 + $8.00 per extra $1,000 |
| $500,001 to $1,000,000 | $3,233.75 + $4.75 per extra $1,000 | $4,629.00 + $7.00 per extra $1,000 |
| Over $1,000,000 | $5,608.75 + $3.65 per extra $1,000 | $8,129.00 + $5.30 per extra $1,000 |
Rather talk it over?
Call 1-855-478-4290 →The same appendix sets trade fees in the same two columns: each electrical, mechanical or plumbing permit carries an issuance fee of $23.50 (current) or $34.00 (suggested); each plumbing fixture or trap is $9.80 or $14.00; each water heater with its vent is $12.30 or $18.00; and an electrical service of 600 volts or less up to 200 amps is $30.50 or $44.00. Re-inspections, after-hours inspections (2-hour minimum) and extra plan review are hourly: $47 for building work ($49.50 for trade work) in the current column and $89 in the suggested one.
The “Summary of Fees” on the forms page (updated 2021) lists the planning and engineering charges, among them a technology surcharge of 3.3% and a long range planning fee of 11% of the building permit, a $40 fence placement permit, a $260 encroachment permit (with a $500 penalty for working in the right-of-way without one), $3,965 for site plan review and $2,130 for a preliminary project review, credited in full if a formal project follows within a year. Those amounts are the same as the “current” column of the 2021 fee comparison attached to the resolution, so confirm them too.
New development also pays development impact fees. After a public hearing on December 2, 2024, the City Council approved an updated impact fee program based on a new nexus study, and the new fees took effect on January 31, 2025; the 2024 schedule is posted on the Community Development page. Sewer connections are handled by the Selma-Kingsburg-Fowler County Sanitation District (559-897-6500) and water service by California Water Service (559-896-4546), each with its own charges.
Trade permits and who may pull them
The Building Division issues electrical, plumbing and mechanical permits alongside building permits, and each needs its own inspections once issued. Fire sprinkler, alarm and kitchen hood work is permitted separately by the Fire Prevention Bureau.
Rather not deal with the building department?
Get a free quote →- Who can sign: the owner, the owner’s contractor, or an agent with a signed letter from the owner may pay for and sign the permit; an agent applying online adds the homeowner authorization form.
- Owner-builders: the city posts the state disclosure form that owner-builders sign when they apply for construction permits.
- Business license: a City of Selma business license is required before doing any business inside city limits. The contractor application asks for the state contractor license number, classification and workers’ compensation details, and prints a $55 license fee, a $4 state-mandated fee and a $30 administrative fee, $89 in all. No license is issued until building, fire, zoning, police and county health requirements are met.
- Renewals: licenses renew each year from the start-of-business date; a fee not paid within 45 days of billing carries a 50% penalty.
How to apply for a Selma building permit
Make sure the parcel is inside Selma; unincorporated addresses go to Fresno County.
Call Planning at 559-891-2209 or book a virtual counter appointment to see whether a site plan review, use permit or variance is needed.
Assemble the plot, foundation, floor, elevation, section and energy sheets the submittal requirements list, with calculations where the design needs them.
Submit the application and plans through the city’s portal or to building@cityofselma.com, with a homeowner authorization form if you are filing for the owner.
If the project has sprinklers, alarms or a hood system, file a fire permit application with plans at the Fire Administration Building.
Once approved, the owner, contractor or authorized agent pays the fees and signs for the permit at the counter.
Review, corrections and what causes delay
The submittal sheet asks for every plan sheet to be the same size and legible. Solar packages must arrive in person or by mail, and fire system plans go to the Fire Administration Building rather than the building counter; after fire review, payment and plan pickup take place at City Hall.
Inspections in Selma
Every building, electrical, plumbing and mechanical permit carries required inspections, which the division explains when the permit is issued. When the work is ready, call the 24-hour Inspection Request Line at 559-891-2220 and leave the job address, permit number, requested date, type of inspection, your name and the best way to reach you. Requests must be on the answering machine before 3:30 p.m. for an inspection the next day, and inspections generally run from 8:30 a.m. to 3:30 p.m. To speak with an inspector beforehand, call 559-891-2208 between 8 and 9 a.m. or 4 and 5 p.m.
- Keep the permit and job card on site.
- Have the city-approved plans on site.
- Keep any earlier “Outcome of Inspection” notices available.
- Provide a ladder when the inspector must reach the roof or attic.
Want this handled start to finish?
Get a free quote →Fire sprinkler, alarm and hood inspections are booked separately with the Fire Prevention Bureau at 559-891-2265, with the fire-approved plans and job card on site; every fire alarm final needs a record of completion.
California building code in Selma
Selma enforces the state building code through its own Building Division, along with the dangerous-buildings abatement code. FEMA’s Community Status Book lists the City of Selma (community 060056) under communities not in the National Flood Insurance Program, so ask the Building Division how a parcel’s flood map status affects your project.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Selma building permit FAQs
Who issues building permits in Selma?
The City of Selma Building Division, at the permit counter in City Hall, 1710 Tucker Street (559-891-2208), for any property inside city limits.
How much is a building permit in Selma?
It depends on the project valuation. The 2021 fee study prints two tables, for example $993.75 plus $5.60 per $1,000 over $100,000 in the current column, or $1,429 plus $8.00 in the suggested one; ask the Building Division which applies.
How do I schedule an inspection in Selma?
Call the 24-hour line at 559-891-2220 and leave your details before 3:30 p.m. for an inspection the next day.
Do I need a permit for a fence?
Yes for any new fence. Replacing an existing fence with the same materials in the same place is exempt, and the Summary of Fees lists a $40 fence placement permit (the 2021 fee comparison recommended $10).
Do I need a permit for a small shed?
Not for a detached accessory structure under 120 square feet, according to the city’s exemption handout.
Do I need plans for a patio cover or carport?
Yes. The city requires plans for patio covers, carports, pools, major remodels and all new construction, and posts a patio detail packet to help.
Does my contractor need a Selma business license?
Yes. A city business license is required before doing any business inside Selma; the contractor application totals $89.
When did Selma’s impact fees last change?
The City Council approved updated development impact fees after a December 2, 2024 hearing, effective January 31, 2025.
Selma permit search and official resources
Applications are filed in the city’s OpenGov portal. For permit history on a property, contact the Building Division at 559-891-2208 or visit the counter at City Hall.
Inspections are where schedules slip.
Get a free quote →- Selma Building Division
- City of Selma OpenGov permit portal
- Plan check requirements
- Inspection requests and phone list
- Forms and permit applications
- Fire Department permits and plan review
- Taxes and fees: impact fee update and user fee study
- Community Development and impact fee schedule
- Planning Division
- Zoning ordinance update
- Engineering standards
- Business licenses
- City Council meetings and agendas
- FEMA Community Status Book, California
Simplify Selma permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Selma sooner?
Let Alliance prepare, file, and track your Selma permits while your crew stays on the job.
More California permitting guides
Fresno County
Read guide →Clovis
Read guide →Coalinga
Read guide →Shafter Building Permit Guide
Read guide →Shasta County Building Permit Guide
Read guide →Shasta Lake Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Selma permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.