In San Jacinto, building permits are issued by the city’s Building and Safety Division in the Community Development Department at City Hall, 595 South San Jacinto Avenue (951-487-7330, building@sanjacintoca.gov), open Monday to Thursday, 8 a.m. to 5 p.m. Applications, payments, uploads and inspection requests all go through San Jacinto Connect. Under the fee schedule effective July 1, 2026, a $60,000 job carries about $1,652 in permit, plan check, energy, fire and life safety, imaging, issuance and state building standards fees before city surcharges and impact fees.
What requires a building permit in San Jacinto?
The division reviews and processes permit and plan check applications and inspects all construction projects in the city, residential and commercial. Its fee schedule shows the work it permits, from whole buildings to single fixtures, and the city publishes standard plans for walls and patio covers.
Permit needed
- New buildings and additions (one combination permit covers the trades)
- Re-roofs and demolition
- Decks and patio covers, on the city standard or on other plans
- Walls and fences, priced by linear foot
- Pools and spas, with equipment and gas connections
- Solar panels and battery storage
- Electrical rewires, service upgrades, temporary power poles and new circuits
- Water heaters, repiping, sewer connections, septic systems, backflow devices and gas piping
- Air conditioners, furnaces, evaporative coolers and ductwork
- Mobile home installation, foundations, awnings and porches
- Signs and grading
Shortcuts the city offers
- City standard patio cover and wall designs (a deck or patio on the city standard is $122, against $245 for other plans)
- SolarAPP+ instant permits for eligible rooftop solar, with or without batteries
- One combination permit that includes the electrical, plumbing and mechanical work for new buildings and additions
Starting a new business in an existing building also triggers an inspection: the Statement of Intended Use goes to Building and Safety and the Fire Marshal first, and a change of use needs the Planning Director’s approval.
What San Jacinto decides and what the state holds
The city sets its own Development Services Fee Schedule (the current one took effect July 1, 2026), updates building valuations every year from the previous February’s ICC tables, and sets its development impact fees, its online-only submittal rule and its zoning in the Development Code. Contractor licensing and the owner-builder rules are set by the state.
San Jacinto building department: who handles permitting
The City of San Jacinto issues its own permits inside the city limits through the Building and Safety Division; Riverside County permits only unincorporated land outside the city. Engineering services, including grading and encroachment work, are provided by Tri-Lakes Consultants for the city, the Riverside County Fire Marshal sets its own fees for fire review, and the Fire Marshal performs new business inspections. Riverside County Fire also staffs the city’s two fire stations.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety Division, Community Development, City Hall, 595 S. San Jacinto Ave, San Jacinto, CA 92583 |
| Phone / email | 951-487-7330; building@sanjacintoca.gov |
| Hours | Monday to Thursday, 8:00 a.m. to 5:00 p.m.; City Hall is closed Fridays and holidays |
| Portal | San Jacinto Connect: apply, pay, print permits, upload documents and schedule inspections |
| Planning | 951-487-7330, planning@sanjacintoca.gov; applications through San Jacinto Connect |
| Engineering | Tri-Lakes Consultants, 951-654-3592 |
| Fire Marshal | Riverside County Fire Marshal, 951-955-4777 |
| Septic / health | County of Riverside Environmental Health, 951-358-5172 |
San Jacinto permit types
Building and Planning applications are filed in San Jacinto Connect, where the applicant also pays fees, uploads plans and documents, prints the issued permit and follows its status. The handouts page supplies a plot plan sample and checklist: property boundaries and dimensions, bordering streets, existing and proposed buildings and their uses, distances to property lines and between buildings, fence and wall heights, easements, curbs, sidewalks and driveways, a north arrow and scale.
Residential permits
New homes and additions are combination permits priced from valuation, with plan check at 65% of the permit fee. Smaller jobs use flat or per-item fees: a re-roof is $79, a deck or patio on the city standard $122 (custom plans $245), and walls and fences $32 per 300 linear feet plus $60 per 100 linear feet of plan check. Rooftop solar can go through SolarAPP+, which only contractors registered with SolarAPP+ may use; it covers roof-mounted panels with or without battery storage and can include a main service upgrade, and code-compliant systems are permitted instantly. Mobile homes have their own plot plan sample and fee lines.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial buildings and tenant improvements use the same valuation table and combination permit. A new business files the Statement of Intended Use, which asks about floor area, flammable finishes, spray booths, combustible storage and similar hazards; the answers may change the occupancy classification and can require structural or fire protection upgrades. The city’s sample plot plan for a business certificate of occupancy shows what to draw.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning. Site plan and design review costs $324 for a single-family home, and $324 plus a $500 deposit for accessory structures, signs and minor facade changes. A conditional use permit is $6,528 plus a $10,000 deposit, a minor use permit $4,303 plus $5,000, a minor variance $535 plus $1,000, and pre-application review $543 plus $2,500.
- Grading and encroachment. Grading over 100 cubic yards and up to 1,000 is $79 plus $79 plan check; an encroachment permit is $51 with an $84 inspection fee and plan check at 2.5% of the engineer’s estimate.
- Water and sewer. Service comes from the City of San Jacinto Water Department (951-487-7330 ext. 747), Eastern Municipal Water District or Lake Hemet Municipal Water District, depending on the address.
- Water quality. A preliminary Water Quality Management Plan costs $3,157 where one is required.
San Jacinto permit fees
Fees come from the Development Services Fee Schedule effective July 1, 2026, which covers building, engineering and planning. Building valuation is the floor area times the per-square-foot value in the most recent February ICC table, updated each July 1. The schedule warns that it estimates city fees only: school districts, Environmental Health and other agencies charge separately.
| Item | Fee |
|---|---|
| Valuation $2,001 to $25,000 | $82.27 for the first $2,000 plus $16.63 per extra $1,000 |
| Valuation $25,001 to $50,000 | $464.71 for the first $25,000 plus $11.99 per extra $1,000 |
| Valuation $50,001 to $100,000 | $764.52 for the first $50,000 plus $8.31 per extra $1,000 |
| Valuation $100,001 to $500,000 | $1,180.21 for the first $100,000 plus $6.65 per extra $1,000 |
| Plan check (combination permits) | 65% of the building permit fee |
| Energy conservation review | 15% of the building permit fee |
| Fire and life safety service fee | 0.10% of valuation |
| Imaging and storage | 0.02% of valuation plus $5 per plan sheet |
| Permit issuance (all permits) | $51 |
| Certificate or temporary certificate of occupancy | $61 |
| Re-roof / demolition | $79 / $125 |
| Solar | $125 per hour of review (1-hour minimum) plus $288 for up to two inspections |
| General Plan maintenance / technology surcharges | 1.9% / 5% of all permit or entitlement fees |
| Plan check revisions / expedited plan check | $125 per hour / 100% of plan check fee, when available |
Rather talk it over?
Call 1-855-478-4290 →Worked example: a $60,000 job falls in the $50,001 to $100,000 band. The permit fee is $764.52 plus 10 × $8.31, or $847.62; plan check adds $550.95, energy review $127.14, the fire and life safety fee $60.00, imaging $12.00, issuance $51 and the state building standards fee $3, for $1,651.71. The $5-per-sheet imaging charge, the General Plan and technology surcharges and the state strong motion fee are added to that.
New homes also pay development impact fees, most of them before final inspection. The schedule revised July 1, 2026 lists, per single-family home, $1,468 for road construction, $1,131 for park land acquisition, $1,290 for park land improvements, $630 for community amenities, $408 for government services, $256 for traffic signals, $212 for fire facilities and $198 for police facilities. Paid at permit issuance are the Multiple Species Habitat Conservation Plan fee of $4,632 per home (under 8 units per acre), the flood control fee of $9,990 per acre and a 1% building permit surcharge (minimum $1, maximum $50). The regional Transportation Uniform Mitigation Fee depends on home size, for example $14,292 for a 1,801 to 2,300 sq ft house. School fees are paid to San Jacinto Unified (951-929-7700 ext. 4680) or Hemet Unified (951-765-5100 ext. 5480).
Trade permits and who may pull them in San Jacinto
For new buildings and additions the electrical, plumbing and mechanical work is included in the combination building permit; separate trade fees apply only when the builder chooses to pull separate trade permits or for minor work. Each separate trade permit adds plan check at 65% of its fee and the $51 issuance fee.
- Electrical: outlets, switches and fixtures $2 each; temporary power pole $51; partial or full dwelling rewire $160 or $322; service upgrade up to 200 amps $65, 201 to 1,000 amps $134.
- Plumbing: fixtures and traps $20 each; water heater $26; full dwelling repipe $36; gas piping $12; backflow preventer $39; sewer connection $53; private sewer or septic system $142 per connection.
- Mechanical: air conditioner or compressor up to 3 tons or 100,000 BTU $31; furnace $31; evaporative cooler $22; ductwork $11 per 100 linear feet.
Rooftop solar through SolarAPP+ is open only to registered contractors. Businesses working in the city apply for or renew a San Jacinto business license through San Jacinto Connect; the license desk takes help calls at 951-537-6386 and is open Monday to Thursday. A permit transfer costs $30.
Rather not deal with the building department?
Get a free quote →How to apply for a San Jacinto building permit
Ask Planning about setbacks, height and allowed uses, and file any site plan and design review in San Jacinto Connect.
Draw the plot plan from the city’s sample and checklist, and use the city standard wall or patio cover plans where they fit.
Create an account, start the permit application, upload plans and documents and pay plan check online.
Resubmit revised plans through the portal; revisions are reviewed at $125 an hour.
Pay school fees, arrange water and sewer with the right district, and get Environmental Health approval for septic.
Pay permit and impact fees in the portal and print the issued permit.
Review, corrections and what causes delay
Planning application fees are typically non-refundable; Planning deposits include a 15% administrative fee, more deposit can be requested, and any surplus is returned when the project ends. Expedited plan check is offered only when available and costs a second full plan check fee. A permit extension must be requested in writing before the permit expires, or an additional fee applies. Investigation inspections are charged at 100% of the plan check fee.
Inspections in San Jacinto
Inspections are scheduled in San Jacinto Connect. The division’s Guidelines for Inspections handout requires 24 hours’ notice: requests made before 4:00 p.m. (by phone, or by fax for tracts, in the handout’s words) get a next-day inspection, and need the permit number, project address and inspection type. Inspectors work between 8:00 and 11:30 a.m. and do not make appointments except in special circumstances.
- The approved plans and the permit card must be on site, the address easy to find and the property lines established.
- The site must be safe, with trenches filled promptly, and the inspector needs access, such as an approved ladder and panel covers removed.
- Someone should be on site; the inspector may refuse to perform an unsupervised inspection.
- The inspector approves or rejects the work at the visit, verbally or in writing. After two failed inspections the city charges $102 an hour (1-hour minimum).
- Complaints or code interpretation requests go in writing to the Building Official.
After-hours inspections, when available, cost $162 an hour and holiday inspections $253 an hour, each with a two-hour minimum. A certificate or temporary certificate of occupancy costs $61, and a duplicate permit or inspection card $30.
California building code in San Jacinto
The division checks that structures in the city meet the current construction codes, city codes and health and safety standards, and the fee schedule charges an energy conservation review on every building permit. Local building rules sit in the San Jacinto Municipal Code. FEMA’s Community Status Book lists San Jacinto (community 065056) as participating in the National Flood Insurance Program, with a current flood map dated April 19, 2017; the city also collects a flood control impact fee per acre.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
San Jacinto building permit FAQ
Who issues building permits in San Jacinto?
The city’s Building and Safety Division at City Hall, 595 South San Jacinto Avenue (951-487-7330). Riverside County only permits unincorporated land outside the city.
Can I apply in person?
The city requires every permit application to go through the San Jacinto Connect online portal; staff at City Hall answer questions Monday to Thursday.
How much is a building permit in San Jacinto?
It depends on valuation. A $60,000 job has an $847.62 permit fee and $550.95 plan check; with the energy, fire and life safety, imaging, issuance and state fees it comes to about $1,652 before surcharges.
How much is a re-roof or patio cover permit?
A re-roof is $79 and a deck or patio on the city standard is $122, plus the $51 issuance fee.
How do I get a solar permit?
Registered contractors can use SolarAPP+ for an instant permit on eligible rooftop systems. Otherwise solar review is $125 an hour plus $288 for inspections.
When do inspectors come?
Between 8:00 and 11:30 a.m. the day after a request made before 4:00 p.m.
Which school district fees apply?
San Jacinto Unified or Hemet Unified, depending on the address; the city’s fee schedule lists both districts’ fee contacts.
San Jacinto permit search and official resources
San Jacinto Connect shows the status of each permit and the documents it still needs, and applicants print their own permits there. For older records on an address, contact Building and Safety at 951-487-7330 or building@sanjacintoca.gov.
Inspections are where schedules slip.
Get a free quote →- Building and Safety Division
- San Jacinto Connect online portal
- Development Services Fee Schedule, effective July 1, 2026 (PDF)
- Development impact fees, revised July 1, 2026 (PDF)
- Instant solar permit (SolarAPP+)
- Building and Safety forms and handouts
- Guidelines for inspections (PDF)
- Plot plan sample and checklist (PDF)
- Statement of Intended Use (PDF)
- Planning Division
- Business license
- Riverside County Fire in San Jacinto
- California Building Standards Code (Title 24)
Simplify San Jacinto permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in San Jacinto sooner?
Let Alliance prepare, file, and track your San Jacinto permits while your crew stays on the job.
More California permitting guides
Riverside County
Read guide →Temecula
Read guide →Wildomar
Read guide →San Joaquin County Building Permit Guide
Read guide →San Jose Building Permit Guide
Read guide →San Juan Capistrano Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about San Jacinto permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.