Building permits in San Dimas are issued by the city’s Building and Safety Division at City Hall, 245 E. Bonita Avenue ((909) 394-6260). Only the owner, a licensed contractor or an agent with a notarized letter may pull a permit; a first plan check takes from 3 to 5 working days for patio covers and pools to 15 to 20 for large additions and small houses; and under the FY 2026-27 fee schedule plan check is 85% of the valuation-based building fee, plus a $44.13 issuance fee.
What requires a building permit in San Dimas?
San Dimas requires permits to construct, remodel or enlarge a building and for many other property improvements. Its own list, which it calls a guideline rather than a complete list, includes:
Permit required
- Buildings, accessory structures, additions and garage conversions
- Demolition, including patio covers
- Remodels that add, remove or enlarge walls, windows or doors
- Window installation, replacement or retrofit
- Decks, balconies and patio covers
- Roof installation, replacement or re-cover
- Fences and walls over 6 feet; retaining walls over 2 feet 10 inches, or any height with a surcharge
- Driveways and driveway approaches
- Pools, including above-ground pools, and spas
- Electrical, plumbing, water heater, furnace, A/C, sewer, septic and irrigation work
No permit
- Painting, wallpaper, carpet, cabinets and interior trim
- Roof repair of no more than 5% of the roof, or 32 square feet over three years
- Washer and faucet repairs and toilet replacement
- Repairing light fixtures, switches and plugs on existing wiring
- Pumping a septic tank
- One-story sheds under 8 feet tall and 120 square feet with no utilities
- Patios or driveways on natural grade that keep the approved drainage
Even exempt work must meet the city’s zoning rules. A plug-in portable spa needs an electrical permit, and an altered driveway approach needs a Public Works Engineering permit.
What San Dimas decides and what the state holds
San Dimas adopted the state codes with its own amendments by Ordinance No. 1275, including the Wildland-Urban Interface Code, and keeps them in Title 15 of the Municipal Code. The city also sets its fees, zoning and Development Plan Review Board approvals and requires a city business license from contractors. The state sets the building code and licenses contractors.
San Dimas building department: who handles permitting
The City of San Dimas Building and Safety Division, in the Community Development Department, administers and enforces the California building codes and the construction sections of the Municipal Code. It performs plan checks and inspections and keeps permit records for the city.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety Division, San Dimas City Hall, 245 E. Bonita Avenue, San Dimas, CA 91773 |
| Phone and email | (909) 394-6260; building@sandimasca.gov; City Hall (909) 394-6200 |
| Hours | Monday to Thursday, 7:30 a.m. to 5:30 p.m.; Friday, 7:30 a.m. to 4:30 p.m. |
| Solar questions | solar@sandimasca.gov |
| Online | Permit center for solar permits; online portal for inspections |
| Planning | Planning Division, staff to the Planning Commission and Development Plan Review Board |
The homeowner’s guide still gives Friday hours of 8 a.m. to 5 p.m.; the city website footer shows 7:30 a.m. to 4:30 p.m.
San Dimas permit types
The division uses two main permit forms. A single trade permit covers one simple trade: door or window replacement, electrical work, fences and block walls over 6 feet, mechanical replacement, stucco, plumbing such as water heaters and repipes, re-roofing without structural work, and patio covers without a roof deck. A combination permit covers the whole of a larger project, so building, electrical, mechanical and plumbing work do not need separate permits. Separate applications exist for re-roofs, electrical-only, mechanical-only, plumbing-only, signs, pools and residential solar, and every revision needs the revision application.
Residential permits
- Plans. Some single trade permits need no plans, but window change-outs, water heater relocations and new A/C condensers do. Combination permits usually need a site plan, foundation, floor, framing and roof plans, elevations, sections, details and structural calculations; added floor area needs an energy report.
- Design professionals. Non-structural plans, such as door and window replacements, can be drawn by anyone; structural work needs plans and calculations stamped by a California-licensed architect or engineer.
- Soils reports. Required for new homes, substantial additions and retaining walls over 6 feet.
- Rooftop solar. Rooftop systems on R-3 homes can be approved through SolarAPP+ and issued through the city’s permit center. Planning requires conduit painted to match, modules at least 12 inches from roof edges and ridges, and flush mounting no more than 6 inches above the roof. Ground-mounted and commercial systems are handled by the division directly.
- ADUs. The city’s 2025 ADU handout caps an ADU at 1,000 square feet, requires it to match the main house’s architecture, include washer and dryer hookups and keep 4-foot side and rear setbacks, bars exterior doors on a wall closer than 15 feet to a property line, and gives the ADU the main address followed by the letter A. Planning asks to be contacted before design ((909) 394-6250).
- Septic to sewer. Removing a septic tank and connecting to the sewer needs a permit: the tank shell and floor are removed, the inspector checks the bottom of the pit with the pump ticket on site, backfill is compacted to 90%, and proof of the Los Angeles County Sanitation Districts connection fee is required before the permit is issued.
- HOA approval. Where a homeowners’ association exists, its approval stamp must be on the plans before submittal.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial work is priced from separate tables for commercial alterations and tenant improvements, with plan check at 85% of the building fee plus the issuance fee. The division’s outside-agency sheet lists the county health department, its Recreational Waters program for commercial pools, county Public Works industrial waste and the Sanitation Districts among the reviewers a project may need. Ground-mounted and commercial solar cannot use SolarAPP+.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning. Design changes affecting exterior appearance must be approved by the Planning Division, and the fee schedule prices development plan review for a single-family home under 2,500 square feet at $2,279.97 per plan type.
- Fire. Los Angeles County Fire reviews residential and commercial plans through its EPIC-LA portal.
- Sewer or septic. The Los Angeles County Sanitation Districts handle sewer connections and septic questions ((562) 699-7411).
- School fees. Building and Safety issues the school district form needed to pay school fees.
- Public Works. Work on the sidewalk, alley, street or driveway approach needs a separate construction or encroachment permit.
San Dimas permit fees
Fees come from the city’s Schedule of Fees and Charges for fiscal year 2026-27, last updated June 25, 2026, which lists Resolutions 2021-44, 2023-58 and 2024-60 for building fees and raises them by the Consumer Price Index (3.40% this year). The current fee structure follows the user fee and cost allocation study adopted on September 26, 2023. The building fee is read from valuation tables; plan check is 85% of the building fee, and each permit adds the issuance fee. Part of the fee is collected when plans are submitted and the balance before issuance.
| Item | Fee |
|---|---|
| Alteration, remodel or additional item, valuation up to $700 | $69.65 |
| Valuation $901 to $1,000 | $104.60 |
| Valuation $19,001 to $20,000 | $617.25 |
| Valuation $49,001 to $50,000 | $1,270.53 |
| Valuation $99,001 to $100,000 | $2,054.73 |
| Plan check | 85% of the building fee |
| Issuance fee | $44.13 |
| Plan maintenance | 2% of the building fee, $15.82 minimum, $673.08 maximum |
| General plan maintenance / online permitting technology | 10% / 3% |
| Preliminary plan review (two-hour minimum) | $349.83 |
| Geotechnical site review before applying | $658.99 |
| Pool barrier inspection | $147.14 |
| Certificate of occupancy / temporary | $161.62 / $242.70 |
| Inspection outside business hours | $156.84 per hour |
| Work without a permit (investigation) | Equal to the permit fee, at least $538.04 ($269.02 for an owner-builder home) |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the alteration table: a remodel valued at $20,000 has a building fee of $617.25, plan check at 85% ($524.66) and the $44.13 issuance fee, or $1,186.04, before the plan maintenance fee ($15.82 minimum), the general plan and technology fees and state fees. Separate tables cover new residential construction, commercial work, tenant improvements and grading. Inspections themselves are included in the permit fee.
Trade permits and who may pull them in San Dimas
Electrical, mechanical and plumbing work can be permitted on its own (electrical-only, mechanical-only and plumbing-only applications, or a single trade permit) or folded into a combination permit. The FY 2026-27 schedule has separate mechanical, plumbing and electrical fee tables, each subject to the same issuance fee.
- Who may pull a permit. Only the property owner, a licensed contractor, or an agent of either carrying a notarized letter dated within one year.
- Contractors. Bring ID, a current state contractor’s license, a current San Dimas business license, proof of workers’ compensation insurance and a letter of authorization if the applicant is not the license holder, and sign the Licensed Contractor Declaration.
- Owner-builders. Homeowners may act as their own contractor on their residence and sign the Owner/Builder Declaration; proof of ownership may be needed after a recent transfer or when a company or trust owns the property.
- Changing contractors. If the contractor signed the permit, a new permit is issued for the new contractor, and the original contractor may be eligible for a refund.
- Business license. The FY 2026-27 business license fee for a business with employees is $177.22 plus $13.34 per employee or partner.
Rather not deal with the building department?
Get a free quote →How to apply for a San Dimas building permit
Use the permit list or call (909) 394-6260 to decide between a single trade and a combination permit.
Clear Planning for exterior changes and your HOA if you have one.
Three sets of plans designed to the 2025 California codes, with structural and energy documents where needed.
File the application with the owner-builder or contractor declaration; part of the fee is due now.
Fire, health, sanitation, industrial waste and school district sign-offs as they apply.
Pay before issuance, then post the job card in plain view near the work.
Review, corrections and what causes delay
The homeowner’s guide gives first-check times of 3 to 5 working days for minor projects such as patio covers and pools, 10 to 15 working days for room additions under 500 square feet, and 15 to 20 working days for larger additions, second-story additions and small houses. More plan review fees can be charged if corrections remain after several submittals. Plans drawn to earlier codes are no longer accepted, since the city takes only plans based on the 2025 California codes from January 1, 2026.
Inspections in San Dimas
Inspections are scheduled through the city’s online portal, which also shows time frames and results; the homeowner or the contractor may request them. You can ask for a morning or afternoon visit (the guide gives 9 a.m. to noon and 1 to 4 p.m.) but not a set time, and cancellations or changes go to (909) 394-6260. An adult representative must be present, and a ladder must be provided for roof or attic work.
The minimum inspections are foundation, framing, rough electrical, plumbing and HVAC, insulation, drywall, exterior lath, roof sheathing and final. A permit stays valid only if an inspection is passed at least every six months. The inspections page says construction must start within one year of issuance, with a one-time extension of up to six months for reasons beyond your control; the older homeowner’s guide says work must begin and get an inspection within 180 days. Changes to the approved scope need City approval before the related inspection.
The homeowner’s guide allows construction from 7 a.m. to dusk on weekdays and 8 a.m. to dusk on Saturdays, with no work on Sundays and holidays.
California building code in San Dimas
San Dimas enforces the 2025 California codes, including the Fire Code and the Wildland-Urban Interface Code, as amended by Ordinance No. 1275; the amendments are in Title 15 of the Municipal Code. FEMA’s Community Status Book lists San Dimas (community 060154) as participating in the National Flood Insurance Program, with a current flood map dated September 26, 2008.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Want this handled start to finish?
Get a free quote →San Dimas building permit FAQ
Do I need a permit to replace windows in San Dimas?
Yes. The city requires a permit for window installation, replacement or retrofit, and window change-outs need plans.
Do I need a permit for a fence or wall?
Fences and walls over 6 feet need a permit, as do retaining walls over 2 feet 10 inches or any wall holding back a slope.
Can a homeowner pull a permit?
Yes. An owner can act as owner-builder on their residence and sign the Owner/Builder Declaration; agents need a notarized letter dated within one year.
How much is a building permit in San Dimas?
For a $20,000 remodel the FY 2026-27 schedule gives $617.25 for the permit, $524.66 for plan check and $44.13 for issuance, plus smaller add-on fees.
How long does plan check take?
From 3 to 5 working days for patio covers and pools up to 15 to 20 working days for large additions and small houses.
Is there a charge for each inspection?
No. Inspections are included in the permit fee, though inspections outside business hours are billed at $156.84 an hour.
When does a permit expire?
It expires if no inspection is passed for six months; construction must also start within one year, with one extension of up to six months.
Can I get a solar permit online?
Yes, for rooftop systems on homes approved through SolarAPP+, filed through the city’s permit center.
San Dimas permit search and official resources
Inspection time frames and results are checked in the city’s online inspection portal. For other permit records, contact the Building and Safety Division, which maintains the city’s building records.
Inspections are where schedules slip.
Get a free quote →- San Dimas Building and Safety
- When do I need a permit
- Plan checking requirements
- Adopted codes and Ordinance No. 1275
- Inspections and FAQs
- Solar permit center (SolarAPP+)
- Forms and handouts
- Homeowner’s guide to the building permit process (PDF)
- Plan review: outside agencies (PDF)
- ADU requirements (PDF)
- Septic removal and sewer connection (PDF)
- Schedule of fees and charges
- FY 2026-27 fee schedule (PDF)
- Planning Division
- California Building Standards Code (Title 24)
Simplify San Dimas permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in San Dimas sooner?
Let Alliance prepare, file, and track your San Dimas permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →San Fernando
Read guide →San Gabriel
Read guide →San Francisco Building Permit Guide
Read guide →San Jacinto Building Permit Guide
Read guide →San Joaquin County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about San Dimas permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.