San Fernando, California Building Permit Guide

To get a building permit in San Fernando, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

San Fernando’s Building and Safety Division, part of the Community Development Department at City Hall, 117 Macneil Street, reviews plans and inspects construction in the city, with applications and plan uploads taken through its Online Permit Counter.

Authority: San Fernando Building and Safety DivisionPhone: (818) 898-1227
Authority
City Building and Safety117 Macneil Street, San Fernando
Counter
Mon–Thu 8:30 a.m.–12:30 p.m.Online Permit Counter preferred
Inspections
Mon–Thu 8:30–11:30 a.m.Building and Safety inspectors
Site plan review
$4,228.09 filing feeLower for owner-occupied homes

The City of San Fernando issues its own building permits through the Building and Safety Division of the Community Development Department at City Hall, 117 Macneil Street ((818) 898-1227). The counter is open only Monday to Thursday from 8:30 a.m. to 12:30 p.m., so the city asks applicants to file building permit applications and upload plans through its Online Permit Counter; most projects first pass a Planning site plan review, whose filing fee runs from $431.66 for a small owner-occupied addition to $4,228.09 for a full review.

What requires a building permit in San Fernando?

San Fernando reviews construction plans for compliance with its building, health and safety codes and inspects all permitted construction. The Online Permit Counter takes building, mechanical, electrical and plumbing permit applications, and the city’s site plan review checklist shows the kinds of work that bring a project into review:

Reviewed work

  • New homes, accessory dwelling units and added units
  • Additions, including additions over 50% of the existing floor area
  • Accessory structures, garages and carports
  • Decks, patio covers, trellises and enclosed porches or stairs
  • Demolition
  • New walls and fences (masonry walls need a building permit)

Also in the checklist

  • New or replaced electrical, mechanical and plumbing systems
  • Re-roofing and window changes
  • Interior alterations
  • Landscaping, hardscape and removal of mature trees
  • Signs and changes of use
  • Commercial, industrial and institutional additions

The city does not post a list of permit-exempt work online; call the Community Development Department before treating a job as exempt.

What San Fernando decides and what the state holds

The city sets its zoning standards, its site plan review process and its wall and fence rules under City Code Section 106-970, and it performs residential inspections when a home is sold. Fire code enforcement is coordinated with the Los Angeles Fire Department. The state sets the building code and licenses contractors.

San Fernando building department: who handles permitting

The Building and Safety Division of the Community Development Department reviews plans, issues permits and inspects permitted construction for the City of San Fernando. It also carries out residential pre-sale inspections, helps with housing, fire protection and zoning inspections, and coordinates fire code requirements with the Los Angeles Fire Department.

Short on time to read all of this?

Get a free quote →
San Fernando permit contacts
DetailInformation
OfficeCommunity Development Department, City Hall, 117 Macneil Street, San Fernando, CA 91340
Phone and email(818) 898-1227; CommunityDevelopment@SanFernando.gov; City Hall (818) 898-1200
Building and Safety counterMonday to Thursday, 8:30 a.m. to 12:30 p.m.
Planning counterMonday to Wednesday, 8 a.m. to noon, or by appointment
City Hall hoursMonday to Thursday, 7:30 a.m. to 5:30 p.m.; Friday, 8 a.m. to 5 p.m.
InspectionsMonday to Thursday, 8:30 to 11:30 a.m.
OnlineOnline Permit Counter for applications, plan uploads and permit tracking

The city warns that immediate permit issuance at the counter cannot be guaranteed. Code enforcement can be reached on evenings and weekends at (818) 898-1267.

San Fernando permit types

The Online Permit Counter, used by homeowners, contractors and the public to apply for and track permits and cases, groups construction work into Planning reviews (accessory dwelling units, commercial business occupancy, planning review and site plan review), building permits (building, mechanical, electrical and plumbing) and Public Works permits (utility service, construction meters, sewer dye tests and fire flow tests).

Residential permits

  • Additions. An owner-occupant adding 49% or less to a single-family home pays a $431.66 planning review fee; an addition of 50% or more takes a $2,114.05 site plan review.
  • Accessory dwelling units. Converting a garage, recreation room or up to half of a house to an ADU takes a $431.66 planning review; a new attached or detached ADU, or an addition to a garage or recreation room, takes a $2,114.05 site plan review. The ADU form gives about 5 days for department review and about 5 days for plan check. Units of 500 square feet or more pay a school fee to the Los Angeles Unified School District.
  • Walls and fences. A wall and fence permit costs $142.80, and a masonry wall also needs a building permit. In residential zones a fence or hedge in the front setback may be 4 feet high, where a wall-and-fence combination may have a solid wall portion of no more than 2 feet and front-yard fences must be at least 50% see-through; side and rear fences may be 6 feet, and coyote rollers may sit on top. Block walls must be finished on both sides, and chain link, razor wire and barbed wire are not allowed.
  • Pre-sale inspection. Sellers of a home, duplex, multi-family or mixed-use property apply for a residential inspection upon resale ($345).

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

New commercial, industrial and institutional buildings and additions go through site plan review ($4,228.09 filing fee). The Online Permit Counter lists a commercial business occupancy (zoning review) among its Planning reviews. Commercial and industrial view-obscuring walls are limited to 6 feet, open fences to 8 feet, and the Director may approve an 8-foot sound wall next to a residential use. Walls along a sidewalk, alley or paseo need pilasters no more than 8 feet apart, a decorative cap, textured or plastered finish (no plain block) and two coats of anti-graffiti coating.

What comes before the building permit

  • Pre-submittal review. An informal meeting with Planning, which routes you to other divisions and explains whether staff, the Planning and Preservation Commission or another body must approve.
  • Site plan review. Two sets of site, landscape, floor, roof and elevation drawings with a PDF copy; Planning, Building, Public Works, Police and Fire review it together (about 4 weeks). The form’s checklist flags, among other things, accessory structures over 400 square feet, a new house larger than the average of nearby structures in the same zone, changes of use, and facade changes that would significantly alter a building’s original character.
  • Commission hearing. Conditional use permits, variances, general plan amendments, zone changes and subdivisions need 17 plan sets and a hearing (about 3 weeks to schedule).
  • Construction waste. The city publishes a construction and demolition waste management form.

San Fernando permit fees

The building permit fee is based on the valuation of the work, set by construction type and cost per square foot in the city’s adopted fee schedule; Public Works fees and the school fee are paid at issuance. That building fee schedule is not posted online, so ask the Community Development Department for a quote. The city’s application forms do print current Planning and inspection fees, several of them built from a base fee plus a 10% Activity Information Management System (AIMS) surcharge and a General Plan Update (GPU) surcharge:

Rather talk it over?

Call 1-855-478-4290 →
San Fernando fees printed on city forms
ItemFee
Site plan review$4,228.09 ($3,676.60 + $367.66 AIMS + $183.83 GPU)
Owner-occupied single-family addition of 50% or more; new ADU$2,114.05
Owner-occupied addition of 49% or less; ADU conversion$431.66
Environmental assessment recording (Los Angeles County Registrar/Recorder)$75
Wall and fence permit (form dated July 2026)$142.80 ($120 + $12 AIMS + $10.80 GPU)
Residential inspection upon resale (form dated July 2026)$345
Appeal of a staff or Commission decisionHalf of the application fee

The site plan review and ADU fee figures come from forms dated August 2023, while the wall and fence and resale inspection forms were revised in July 2026; confirm any older figure when you apply. The building valuation table itself is not published online.

Trade permits and who may pull them in San Fernando

Mechanical, electrical and plumbing permits are applied for through the Online Permit Counter alongside building permits. The site plan review checklist treats new, altered or replaced electrical, mechanical and plumbing systems as work the Planning Division screens to decide the level of review, so a simple trade job may still need a quick Planning sign-off.

  • Contractors. City forms such as the resale inspection application ask for the contractor’s company, state license number and license class.
  • Homeowners. The Online Permit Counter is open to homeowners as well as contractors; the city’s posted pages do not set out a separate owner-builder process, so ask the department what documents an owner must bring.
  • Fire. Fire code requirements are coordinated with the Los Angeles Fire Department, and Public Works handles fire flow tests requested through the online counter.

Rather not deal with the building department?

Get a free quote →

How to apply for a San Fernando building permit

1. Talk to Planning

Use the informal pre-submittal review to learn which approvals the project needs.

2. File site plan or planning review

Submit the drawings, a PDF copy and the filing fee; the departments meet to review the proposal.

3. Correct and get approval

Planning sends a written summary of any corrections, then approves or sends the project to a hearing.

4. Submit for plan check

Upload or submit two sets of construction plans with the plan check fee; Planning checks them against its approval first.

5. Clear other departments

Planning, Public Works and fire approvals are needed before issuance.

6. Pay and build

Pay the valuation-based permit fee, Public Works fees and school fees, then arrange inspections with the division.

Review, corrections and what causes delay

The site plan review form gives about 4 weeks for department review, about 3 weeks to reach a hearing where one is needed and about 3 weeks for building plan check; the ADU form gives about 5 days for each review. A site plan must show full dimensions for the lot, setbacks, buildings, parking, access, lighting, landscaping, off-site improvements and drainage, and incomplete sets go back for correction. Appeals of a decision must be filed with the City Clerk within 10 days.

Inspections in San Fernando

Building and Safety inspects all permitted construction. Inspections are carried out Monday to Thursday between 8:30 and 11:30 a.m.; the city’s posted pages do not explain how to request one, so ask the Community Development Department at (818) 898-1227 and track the permit on the Online Permit Counter. A certificate of occupancy is granted when construction is complete and approved.

The division also performs residential inspections when a property is sold. The application covers single-family homes, duplexes, multi-family and mixed-use properties, asks for the house size, bedrooms, baths and stories, and sends the results by mail or email.

California building code in San Fernando

The Building and Safety page still describes the city as enforcing the 2022 California Building Code and the 2017 California Fire Code; the state note below gives the edition that applies to new applications. FEMA’s Community Status Book lists San Fernando (community 060628) as participating in the National Flood Insurance Program, with no special flood hazard area shown on its current map.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Want this handled start to finish?

Get a free quote →

San Fernando building permit FAQ

Where do I apply for a building permit in San Fernando?

Through the city’s Online Permit Counter, or at the Building and Safety counter at City Hall, 117 Macneil Street, Monday to Thursday from 8:30 a.m. to 12:30 p.m.

Do I need Planning approval before a building permit?

Usually. Additions, ADUs, new buildings and many other projects go through planning review or site plan review before plan check.

How much is site plan review?

$4,228.09 for a full review, $2,114.05 for an owner-occupied home adding 50% or more, and $431.66 for a smaller owner-occupied addition.

Do I need a permit for a fence?

Yes. A wall and fence permit costs $142.80, and masonry walls also need a building permit; front-yard fences are limited to 4 feet.

Does the city inspect homes before a sale?

Yes. Building and Safety performs residential pre-sale inspections; the application fee is $345.

When are inspections done?

Monday to Thursday between 8:30 and 11:30 a.m.

How long does review take?

About 4 weeks for site plan review and about 3 weeks for building plan check, or about 5 days each for ADUs, according to the city’s forms.

San Fernando permit search and official resources

Permits and cases can be viewed and tracked on the Online Permit Counter. For older records, contact the Community Development Department at (818) 898-1227.

Inspections are where schedules slip.

Get a free quote →

Simplify San Fernando permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in San Fernando sooner?

Let Alliance prepare, file, and track your San Fernando permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about San Fernando permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.