Inside Norco, building permits come from the city’s Building and Safety Division in Community Development, at City Hall, 2870 Clark Avenue (951-270-5616; counter open 10 a.m. to 4 p.m.). Fees follow the FY 2026–2027 Adopted Fee Schedule: the valuation table result is multiplied by 2.818, and a 5% technology surcharge is added, so a $40,000 job pays about $1,687 including the General Plan maintenance fee. Only a California licensed contractor or the property owner may normally pull a permit.
What requires a building permit in Norco?
The Building and Safety Division says most construction projects need a building permit: altering, enlarging, adding to, moving, removing, repairing, demolishing or converting any building or structure, with separate plumbing, electrical and mechanical permits often needed as well. Its FAQ names common jobs that residents miss and the work it treats as exempt.
Permit required
- Re-roofing
- Installing or replacing a water heater
- Patios
- Block walls
- Outdoor lighting, except low voltage
- Air conditioning and heating
No permit required
- Portable covered pipe corrals without walls, up to 288 sq ft and 12 feet wide (Resolution 2024-13 or Ordinance 1120)
- Masonry or garden fences up to 3 feet high; wood or chain link fences under 6 feet
- Retaining walls up to 2 feet from top of footing to top of wall, unless they support a surcharge or other load or impound Class I, II or IIIA liquids
- Detached accessory buildings up to 120 sq ft, 14 feet high at most and set back 5 feet
- Painting, papering and other finishing work
The forms page carries a covered corral handout headed “No Permit Required”, an exempt accessory structures and sheds handout, and a storage shed modification handout.
What Norco decides and what the state holds
The City Council adopts the fee schedule each fiscal year, including the 2.818 multiplier on the valuation table and the 5% technology surcharge. The city sets the corral exemption by resolution and ordinance, its construction and demolition recycling rule in Section 6.42.310 of the municipal code, and its design values for plans: 102 mph wind at Exposure C, 2 inches of rain per hour, Title 24 Climate Zone 10 and Seismic Design Category D. Contractor licenses and workers’ compensation rules come from state law and the Contractors State License Board.
Norco building department: who handles permitting
The city’s Building and Safety Division, part of the Community Development department, reviews plans, issues permits and inspects construction throughout Norco. Riverside County permits only unincorporated land outside the city. Fire plan review is priced on the city’s own Fire Prevention Services schedule, Public Works approves construction waste reports, grading and work in the street, and the Finance department issues business licenses.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety Division, Norco City Hall, 2870 Clark Avenue, Norco, CA 92860 |
| Phone / counter | 951-270-5616; counter hours 10 a.m. to 4 p.m. |
| Inspections | 951-270-5600, 24 hours a day |
| Business license | 951-270-5679; Business License Division at City Hall |
| City Hall main line | 951-735-3900 |
Norco permit types
The division posts a general Building Permit Application with project checklists, authorization forms and worksheets on its Applications and Forms page. Residential solar has three routes: in person at City Hall, online through SolarAPP+, or by email. SolarAPP+ users must first complete the IREC training for rooftop solar (a separate course covers solar with batteries), and questions or refunds on that platform go to SolarAPP+, not to city staff.
Residential permits
Submittal requirement sheets cover single-family dwellings, room additions, remodels, detached garages and storage buildings, accessory dwelling units (with an ADU checklist and a second water meter requirement), pools and spas, re-roofs (with a supplemental worksheet), aluminum patio covers, electrical service upgrades and water heaters. The forms page also has an Owner Builder Acknowledgment Worksheet, a Pool Owner Declaration Worksheet with pool safety guidelines, and a worksheet for block wall or fence agreements on a property line. Demolishing an in-ground pool and connecting to sewer each have their own handouts. The Planning schedule lists ADU pre-approved plans at $361.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial work uses the Commercial Development Plan Check Requirements and the Tenant Improvement Submittal Requirements; subdivisions follow a separate submittal list. New buildings and tenant spaces pay for a certificate of occupancy ($694 each with the surcharge), and the Fire Prevention Services schedule charges plan check by floor area and occupancy, for example $433 for a commercial building under 2,000 sq ft.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning. The Planning schedule prices an Accessory Building Use Permit ($4,268), minor site plan review ($5,538), a residential variance ($4,060) and a zone verification letter ($185); a first pre-application review is listed with no fee (n/a).
- Waste plan. Most projects file a Waste Management Report and pay a performance deposit; Public Works must approve the report before a building or demolition permit is issued and has 10 business days to respond.
- Public Works. Residential grading plan review is $858 and the grading permit and inspection $2,831; a home driveway approach encroachment is $1,068 and a utility lateral $1,851.
- Fire. New homes with fire sprinklers pay a $346 base fee per model plus $7 per head; residential fire plan check is $432 under 2,000 sq ft.
Not sure this scope needs a permit?
Get a free quote →Norco permit fees
Fees are calculated from the current fiscal year’s schedule, the FY 2026–2027 Adopted Fee Schedule, dated July 1, 2026 in the city’s document center. Building valuation is based on the most current International Code Council valuation tables. The Table 1-A figure is multiplied by 2.818 to give the total fee, and the 5% technology surcharge applies to all Building and Safety fees except microfilming and the General Plan maintenance fee.
| Item | Fee |
|---|---|
| Table 1-A, valuation $25,001 to $50,000 | $391.75 for the first $25,000 plus $10.10 per extra $1,000, times 2.818 |
| Table 1-A, valuation $50,001 to $100,000 | $643.75 for the first $50,000 plus $7 per extra $1,000, times 2.818 |
| Table 1-A, valuation $100,001 to $500,000 | $993.75 for the first $100,000 plus $5.60 per extra $1,000, times 2.818 |
| General Plan maintenance | $2 per $1,000 of building valuation |
| Electrical / mechanical / plumbing | $0.60 / $0.54 / $0.59 per sq ft with surcharge |
| Residential rooftop solar up to 15 kW | $613 ($644 with surcharge); $15 per kW above 15 kW |
| Residential ground-mount solar / commercial rooftop up to 250 kW | $826 / $1,037 with surcharge |
| Demolition permit | $586 with surcharge |
| Water and sewer connection | $449 with surcharge |
| Temporary certificate of occupancy / temporary power | $587 / $588 with surcharge |
| Special inspections | $480 with surcharge |
| Address assignment | $114 with surcharge |
| Re-inspection; inspection outside business hours | $173 each; $173 per hour, two-hour minimum |
| Additional plan review for changes | $150 per hour, half-hour minimum |
Rather talk it over?
Call 1-855-478-4290 →Carports, decks, patio covers, re-roofs, pools, garden and retaining walls and signs are all charged from Table 1-A. Worked example: a $40,000 job falls in the $25,001 to $50,000 band, so Table 1-A gives $391.75 plus 15 × $10.10, or $543.25. Multiplied by 2.818 that is $1,530.88, the 5% surcharge adds $76.54, and the General Plan maintenance fee adds $80, a total of $1,687.42. The band edges do not chain exactly ($25,000 works out to $391.25 from the band below, and $50,000 to $644.25), so keep estimates inside one band. The residential solar line also cites a $500 maximum under SB 1222 next to its $613 fee, so ask the division which figure it charges.
Development impact fees. The schedule lists per-unit fees approved November 5, 2014. For a single-family home they total $35,002: parks $11,821, sewer $6,134, water $4,662, streets $4,062, public meeting facilities and library $3,318, storm drains $2,545, general government facilities $1,199, fire $1,010 and animal control $251. A multifamily unit totals $24,919. Administrative citations for building violations are $130, $700 and $1,300 for the first, second and third levels.
Trade permits and who may pull them in Norco
Electrical, mechanical and plumbing permits come from the Building and Safety Division and are charged per square foot: $0.57, $0.52 and $0.56 before the surcharge, the same for homes and commercial buildings. Manufactured home fees follow Title 25. A re-roof, an electrical service upgrade or a water heater each have their own worksheet or guideline on the forms page.
- Who may pull. Normally only a California licensed contractor or the property owner. Contractors may pull only the types of permits their license class allows, so a plumbing contractor cannot pull an electrical permit.
- Contractors bring their state contractor’s license (usually the wallet card), and someone other than the licensee needs an authorization letter on company letterhead.
- Business license. A current Norco business license is required for the contractor and every subcontractor, and the forms page carries a Contractors Business License sublist form. It runs from July 1 to June 30; an out-of-town contractor pays a $46 processing fee plus the business license tax, and renewals carry a $25 processing fee and the $4 state SB 1186 fee.
- Owners need only photo identification. A new owner not yet in the Assessor’s records shows proof of ownership, such as sale papers.
- Agents and permit services bring the owner’s authorization letter and an Owner Declaration; a permit service also needs a Norco business license and a notarized Owner Declaration.
The FAQ adds that state law requires licensed contractors to carry workers’ compensation if they have employees, or a certificate of exemption if they do not.
Rather not deal with the building department?
Get a free quote →How to apply for a Norco building permit
Compare the job with the FAQ exemption list and the corral and shed handouts.
Use the matching requirement sheet (dwelling, addition, remodel, ADU, pool, tenant improvement) and the plot plan example.
Get Norco business licenses for the contractor and every subcontractor, or the authorization letters and Owner Declaration if an agent files.
Submit the Waste Management Report to Public Works, which has 10 business days to answer, and plan for the performance deposit.
Submit the Building Permit Application and plans to the division at City Hall during counter hours (10 a.m. to 4 p.m.); residential solar can also go by email or SolarAPP+.
Fees follow the FY 2026–2027 schedule; the performance deposit is paid when all permit fees and deposits are paid.
The permit is valid for 180 days after issuance; extension and renewal request forms are on the forms page.
Review, corrections and what causes delay
Changes, additions or revisions to plans are billed at $150 an hour, and outside consultant plan check or inspection is charged at actual cost (or cost plus 30% for an inspection consultant chosen by the city). The forms page has requests to extend a plan review or application, renew a permit or withdraw one. A permit is good for 180 days after issuance, and the Building Official may grant one 180-day extension; once it expires, the project may have to start over and pay all fees again.
Inspections in Norco
The Requirements page gives 951-270-5600 for inspections, answered 24 hours a day, and the forms page posts the division’s Inspection Instructions. Re-inspections are $173 each, and inspections outside normal business hours are $173 an hour with a two-hour minimum. Special inspections are $480 with the surcharge.
- Sewer connections. As-built plans of the sewer connection (on 8.5 by 11 inch paper) and a certificate of septic tank pumping are needed before inspection. Lines are at least 3 inches, slope at least a quarter inch per foot, and need a 4-inch riser and cleanout at the property line, with more cleanouts every 100 feet. Old septic tanks are abandoned by pumping both compartments and filling them, with a city building inspector’s inspection before filling. Sewer permits expire 15 days after issuance.
- Waste diversion. Within 30 days after a demolition is finished or the certificate of occupancy is issued, the applicant turns in the completed report, weight tickets and reuse records. Once the full report is in, the city has 30 days to confirm the goal and request the deposit’s release; missing the 30-day filing deadline forfeits the whole deposit.
- Occupancy. New buildings and tenant spaces receive a certificate of occupancy ($694 with the surcharge); a temporary certificate is $587.
Want this handled start to finish?
Get a free quote →Norco’s recycling ordinance requires 100% of inert materials and at least 65% of other debris to be recycled or reused, though the refund paragraph on the same page says the official checks for at least 50% of remaining debris. The deposit is 0.75% of valuation for building projects and 1.5% for demolition, up to $30,000, in cash, check or a surety bond over $10,000. Residential remodels, and demolitions or commercial tenant improvements under 1,000 sq ft, are exempt. Appeals go in writing to the City Clerk within 10 business days.
California building code in Norco
Plans for the whole city use the design values on the division’s Requirements page: 102 mph wind at Exposure C, 2 inches of rain per hour, Climate Zone 10 and Seismic Design Category D. FEMA’s Community Status Book lists Norco (community 060256) as participating in the National Flood Insurance Program, with a current flood map dated September 12, 2024.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Norco building permit FAQ
Who issues building permits in Norco?
The city’s Building and Safety Division at City Hall, 2870 Clark Avenue (951-270-5616). Riverside County permits only unincorporated land.
Do I need a permit for a horse corral or shed?
Not for a portable covered pipe corral without walls up to 288 sq ft and 12 feet wide, or a detached accessory building up to 120 sq ft and 14 feet high with a 5-foot setback.
Do I need a permit for a fence in Norco?
Masonry or garden fences up to 3 feet and wood or chain link fences under 6 feet are exempt. Block walls need a permit.
How much does a building permit cost in Norco?
The valuation table result is multiplied by 2.818 and a 5% surcharge is added; a $40,000 job comes to about $1,687 with the General Plan maintenance fee.
Do contractors need a Norco business license?
Yes. The contractor and every subcontractor need a current Norco business license before work begins; licenses run from July 1 to June 30.
How long is a Norco building permit valid?
180 days after issuance. The Building Official may grant one 180-day extension.
Inspections are where schedules slip.
Get a free quote →Can I apply for solar online?
Yes, through SolarAPP+ after its training, or in person at City Hall or by email.
Norco permit search and official resources
Copies of permits and other public records are viewed, searched and requested through the city’s Public Records page. Fee schedules for every fiscal year since 2020–2021 are kept in the city’s online document center.
- Building and Safety Division
- Building FAQ: permits, exemptions and who may pull
- Applications and forms
- Plan, permit and construction requirements
- FY 2026–2027 Adopted Fee Schedule (PDF)
- Fee schedule archive
- Business licenses
- Public records, including permit copies
- California Building Standards Code (Title 24)
Simplify Norco permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Norco sooner?
Let Alliance prepare, file, and track your Norco permits while your crew stays on the job.
More California permitting guides
Riverside County
Read guide →Palm Desert
Read guide →Palm Springs
Read guide →Norwalk Building Permit Guide
Read guide →Novato Building Permit Guide
Read guide →Oakdale Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Norco permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.