Skip to main content
Municipal GuideCaliforniaNovato · Marin County

Novato, California Building Permit Guide

To get a building permit in Novato, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Novato’s Building Division reviews plans, issues building permits and inspects work across the city from the Permit Center at 922 Machin Avenue, with applications, payments and inspection requests handled in the Novato Permits portal.

Authority: Novato Community Development, Building DivisionPhone: 415-899-8989Inspections: Novato Permits portal
Authority
City Building DivisionPermit Center, 922 Machin Ave.
Apply
Novato Permits portalOnline since October 1, 2025
Re-roof
$283 up to 2,000 sq ftPlus $94 per extra 1,000 sq ft
Counter
Mon–Thu 9 to 11 a.m.Drop-in Permit Resource Center

Inside Novato, building permits come from the city’s Building Division, part of Community Development, at the Permit Center, 922 Machin Avenue (415-899-8989, permitinfo@novato.gov). Since October 1, 2025 applications go through the Novato Permits portal, which needs an account. Fees come from the Master Fee Schedule adopted by Resolution No. 2022-059 and effective July 1, 2026 in its current form: a like-for-like water heater is $94 and a house re-roof up to 2,000 sq ft is $283.

What requires a building permit in Novato?

Novato’s permit rules come from city ordinances, zoning regulations and the state building codes. The fee schedule shows what the Building Division permits: new buildings, additions, tenant improvements and remodels, priced by valuation, and a long list of small jobs with flat fees that already include plan review and inspection.

Valuation-based permits

  • New buildings and additions
  • Tenant improvements and residential remodels
  • Commercial and multi-family re-roofs and window jobs
  • New water, drain or gas lines beyond the flat-fee limits
  • Major demolition

Flat-fee permits

  • Water heater, HVAC and water filtration change-outs
  • House re-roofs, windows and sliding doors
  • Fences and temporary power poles
  • Service panels, generators and up to two lights or circuits
  • Residential and commercial solar
  • Investigative and minor interior demolition up to 500 sq ft

The city’s permit pages do not post a list of exempt work. Ask the Permit Center before you skip a permit: work done without one carries an investigation fee equal to the permit fee, on top of the permit itself.

What Novato decides and what the state holds

The city sets its own fees, zoning and development review, impact fees and the Residential Development Tax in Municipal Code section 16-4.5, and it decides which small jobs qualify for an over-the-counter Express Permit. The Building Official sets the final valuation of every permit. Contractor licensing is a state matter; the city’s part is the Novato business license that contractors must hold.

Novato building department: who handles permitting

The City of Novato Building Division handles plan review, permit issuance and field inspections for property inside city limits; Bob Curry is the Chief Building Official. Planning, Public Works engineering and code enforcement work from the same building, and Novato Fire, North Marin Water and the Novato Sanitary District are separate agencies whose staff join the city at its Permit Connections sessions. Land outside the city is unincorporated Marin County, where the county’s Community Development Agency issues permits (see the Marin County guide).

Short on time to read all of this?

Get a free quote →
Novato permit contacts
DetailInformation
OfficePermit Center, City Administrative Offices, 922 Machin Avenue, Novato, CA 94945
Permit questions415-899-8989; permitinfo@novato.gov
Inspectionsbuilding@novato.gov; inspection hotline 415-899-8240
Office hoursMonday to Thursday 9 a.m. to 5 p.m., and alternating Fridays
Public counterBuilding, planning and code enforcement permitting, Monday to Thursday 9 to 11 a.m.
Planning415-899-8989; planning@novato.gov
Public Works engineering415-899-8246; pw@novato.gov (encroachment and engineering permits)
After-hours emergencies415-897-4361

The Permit Resource Center is open for drop-in use during counter hours; outside them, book an appointment for its self-service kiosk.

Novato permit types

All building permits are applied for in the Novato Permits portal. If you need help setting up an account or filing, book an appointment with Permit Center staff.

Residential permits

  • Express Permits. Ten common home jobs can be applied for and paid online and issued without waiting for plan review, once fees are paid and the forms are signed: like-for-like bath and kitchen remodels, residential electrical (panels, subpanels, circuits, lighting), like-for-like mechanical and plumbing replacements, like-for-like re-roofs and siding, window and door replacements, and SolarAPP+ rooftop solar with or without battery storage. Kitchen and bath express permits are limited to non-structural work that keeps the room layout and fixture locations unchanged.
  • Standard permits. Anything outside those categories, from additions and new houses to structural remodels, goes through the standard application with plan review.
  • Second units. A second unit for an existing single-family home has its own, lower development impact fee in the schedule.

Commercial permits

New commercial buildings, tenant improvements and commercial re-roofs or window jobs are priced by valuation, and commercial solar has its own flat fees. New non-residential space pays development impact fees per 1,000 sq ft before the permit is issued, and inside the Downtown Overlay district new non-residential space, expansions or changes of use that need more parking either provide it on site or pay the in-lieu fee, listed as $5,000 per required stall (a footnote in the schedule describes a later step to $10,000, so ask Planning for the current amount).

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Pre-application help. The first half-hour pre-application meeting with staff is free; an additional meeting of up to an hour costs $574. Property research without a meeting is free for the first half hour.
  • Planning review. Projects that need zoning review pay Planning’s plan check fee, from a $118 zoning clearance to $530 for a new house.
  • Public Works. Pools, fences, signs and new construction can need an engineering plan check, and work in the street needs an encroachment permit from Public Works.
  • Water and sewer. Water service comes from North Marin Water and sewer from the Novato Sanitary District, both separate from the city; bring questions about connections to a Permit Connections session.
  • Permit Connections. On the first and third Thursday of each month, from 9 to 11 a.m., staff from building, planning, Public Works, code enforcement, Novato Fire, North Marin Water and the sanitary district meet the public at the Permit Center, with no appointment needed.

Novato permit fees

The City Council adopted Novato’s user and regulatory fees on May 24, 2022 by Resolution No. 2022-059, after a citywide fee study, with full cost recovery for building services. An update approved at a public hearing on November 19, 2024 took effect on February 1, 2025 and lowered the fees for the most common minor permits. Fees may rise each July 1 with the San Francisco-Oakland-Hayward Consumer Price Index; the schedule in force is the one effective July 1, 2026, with a 2.18% adjustment for FY 2026-27.

Selected Novato building fees (Master Fee Schedule, effective July 1, 2026)
ProjectFee
Water heater, like for like$94
Water heater relocation or type change (tankless, heat pump, solar)$189
HVAC change-out, like for like / new A/C or relocation / new HVAC$95 / $189 / $252
House re-roof up to 2,000 sq ft of roof$283, plus $94 per additional 1,000 sq ft
House windows or sliding doors, up to 5$189 (over 5: $190 plus $25 each)
Fence$189
Residential solar, 15 kW or less$330 (above 15 kW: $330 plus $15 per kW)
Service panel or generator, residential$163
Water, drain or gas line replacement (gas up to 5 outlets)$189
Minor interior demolition, 500 sq ft or less$263
Permit issuance fee$79
Plan review, when required80% of the building permit fee (covers two plan checks)
General Plan maintenance and technology fees10% of the permit fee each (minor permits exempt)
Re-inspection (second or more) / missed inspection$94 each
Permit extension / temporary certificate of occupancy (30 days)$189 / $283

Rather talk it over?

Call 1-855-478-4290 →

The flat fees above include plan review and inspection; the permit issuance fee and state fees are added. Larger work is priced from Section D of the schedule: $187.95 for the first $2,000 of valuation, plus $22.55 per added $1,000 up to $25,000; $706.65 for the first $25,000 plus $20.75 per added $1,000, $1,225.36 for the first $50,000 plus $13.19 per $1,000, $1,884.76 for the first $100,000 plus $10.37 per $1,000, $6,032.29 for the first $500,000 plus $9.05, and $10,556.77 for the first $1,000,000 plus $5.43 per $1,000 above that. When the job needs plumbing, electrical or mechanical review, 10% of the base permit fee is added for each trade.

Worked example. A $30,000 remodel with no trade, Planning or Public Works review: permit fee $706.65 + 5 × $20.75 = $810.40; plan review at 80% = $648.32; General Plan maintenance and technology fees at 10% each = $81.04 + $81.04; issuance $79. That totals $1,699.80, plus the state strong-motion fee ($30,000 × 0.00013 = $3.90) and the $2 Building Standards fee, or $1,705.70.

Development fees and taxes

  • Development impact fees, paid before a building permit is issued for new development: $31,853.20 per single-family home, $22,191.17 per multi-family unit, $11,095.57 for a second unit on an existing house lot, and per 1,000 sq ft of floor area $20,786.95 commercial, $18,060.97 office and $12,541.50 industrial.
  • Residential Development Tax: $490 for a one-bedroom unit, $730 two bedrooms, $900 three, $1,070 four, $1,240 five and $170 for each additional bedroom.
  • Affordable housing in-lieu fee: developments of one or two single-family homes under 3,000 sq ft are exempt; subdivisions of 3 to 7 units pay a fee based on their size (ask the Housing Coordinator), and larger ones must include an affordable unit.
  • Quimby park fees apply only to residential subdivisions, and school developer fees are set by the Novato Unified School District.
  • Encroachment permits start at a $269 minimum or 5.5% of the engineer’s estimate for the first $10,000.

Rather not deal with the building department?

Get a free quote →

Refunds: up to 80% of plan review fees before review starts, or of permit fees before inspections start; nothing is refunded 180 days after payment.

Trade permits and who may pull them in Novato

Electrical, plumbing and mechanical permits are issued by the Building Division through Novato Permits. Common replacements (panels, circuits and lighting; furnaces, air conditioners, heat pumps and ductwork; water heaters, supply, drain and gas lines) are Express Permits; new systems and larger installations are priced from the valuation table or added to a building permit at 10% of the base fee per trade.

  • Homeowners, licensed contractors and qualified permit agents may apply for Express Permits; each applicant submits credentials with the Novato Permits account, and some permit types require a specific trade license.
  • Business license. Contractors must hold a valid City of Novato business license, handled online through HdL Companies (415-899-8917, bl@novato.gov).

How to apply for a Novato building permit

1. Check the project type

Compare it with the ten Express Permit categories; anything else is a standard permit.

2. Ask early

Use the free first half-hour pre-application meeting or a Permit Connections morning.

3. Create an account

Register in Novato Permits and submit your credentials; staff can help by appointment.

4. Apply and pay plan check

Upload plans; plan check fees are paid when you apply.

5. Clear reviews

Answer corrections from Building, Planning and Public Works.

6. Pay and get the permit

Impact fees and remaining permit fees are paid before issuance.

7. Book inspections

Use “My Inspections” in the portal once the permit is issued.

Review, corrections and what causes delay

The plan review fee covers two plan checks; the Chief Building Official may bill hourly for further rounds, so a complete first submittal saves money. Revisions to approved plans are also billed hourly. If the Building Official finds the stated valuation too low, the permit is denied unless a signed construction contract shows the full cost. Projects in a flood zone carry an added Building Division flood review at 15% of the plan check fee.

Inspections in Novato

Inspection requests are made only in the Novato Permits portal, under “My Inspections”, and only for permits that have been issued. The person asking must be a listed contact on that permit record. The Building Division aims for next-day inspections, though heavy workloads sometimes push them back, and the portal will not book city non-working days or holidays; it offers the next available business day first.

Want this handled start to finish?

Get a free quote →

All construction must be inspected before it is covered; ask your building inspector at permit issuance which inspections your project needs. A second or later re-inspection and a missed inspection each cost $94; after-hours inspections are $226 an hour with a two-hour minimum.

Construction is allowed Monday to Friday from 7 a.m. to 6 p.m. and Saturday from 10 a.m. to 5 p.m., never on Sundays or federal holidays. A temporary certificate of occupancy runs 30 days at a time.

California building code in Novato

Novato applies the state codes through its own Building Division; any local amendments are in the Novato Municipal Code. FEMA’s Community Status Book lists Novato (community 060178) as participating in the National Flood Insurance Program, with a current flood map dated March 16, 2016, and as a Community Rating System class 6 community, which gives policyholders a 20% flood insurance discount.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Novato building permit FAQ

How much is a building permit in Novato?

Small jobs have flat fees, such as $94 for a like-for-like water heater or $283 for a house re-roof up to 2,000 sq ft, plus the $79 issuance fee. Larger work is priced by valuation, with plan review at 80% of the permit fee.

Can I skip plan review for a small job?

For the ten Express Permit types, yes: they are issued online without waiting for plan review once fees are paid and forms signed.

Do I need a permit for a fence in Novato?

The schedule lists a fence permit at $189, and Public Works may add a $106 plan check where its review applies.

Can a homeowner pull the permit?

Yes, homeowners may apply for Express Permits alongside licensed contractors and permit agents, using a Novato Permits account.

How do I schedule an inspection?

In the Novato Permits portal under “My Inspections”, for an issued permit on which you are a listed contact.

Do contractors need a Novato business license?

Yes. The city requires contractors to hold a valid Novato business license, issued through HdL Companies.

What are the development impact fees for a new house?

$31,853.20 per single-family home under the July 1, 2026 schedule, paid before the building permit is issued, plus the Residential Development Tax by bedroom count.

Inspections are where schedules slip.

Get a free quote →

Where can I talk to every department at once?

At Permit Connections, held on the first and third Thursday of the month from 9 to 11 a.m. at the Permit Center.

Novato permit search and official resources

The Building Division’s pages include a permit status lookup and an online records search for past permits; Novato Permits shows your own applications, fees and inspections. Permit questions go to permitinfo@novato.gov.

Simplify Novato permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Novato sooner?

Let Alliance prepare, file, and track your Novato permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Novato permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.