In the Town of San Anselmo, the Building Department at Town Hall, 525 San Anselmo Avenue (415-258-4616), reviews plans and issues permits for all construction and demolition in the Town. Every permit is applied for in eTrakit; small permits such as water heaters and re-roofs are issued within a few business days, while large projects take about 6–8 weeks to clear every department. The Town’s fee schedule effective July 1, 2026 (Town Council Resolution No. 2026-4615) sets the permit fee from valuation and adds plan check at 65% of that fee.
What requires a building permit in San Anselmo?
The Town requires a building permit for all construction, demolition, repair, reconstruction, rehabilitation, alteration, addition or other improvement of a building or structure unless the work is on its exemption list. Exempt work must still meet the state code, and several exemptions come with Town limits that send you to Public Works instead.
No building permit
- One-story sheds or playhouses up to 120 sq ft and 8 feet tall, with no utilities
- Fences 7 feet or less
- Retaining walls under 4 feet that hold back only level ground
- Walkways or driveways under 150 sq ft on grade
- Freestanding decks up to 200 sq ft and 30 inches above grade that do not serve an exit door
- Painting and similar finish work; awnings projecting up to 54 inches
- Swapping receptacles, switches, breakers or fixtures with no wiring changed
Town limits that still apply
- Sheds count toward lot coverage and floor area; in R-1 zones they may sit in side and rear setbacks
- Any fence or structure within 20 feet of the front property line needs a Public Works fence permit and is limited to 3 feet
- More than 150 sq ft of new or replaced paving needs a flatwork permit
- More than 500 sq ft of impervious surface must include bioretention
- HVAC units, heat pumps and mini splits must stay under 40 dB at the property line
What San Anselmo decides and what the state holds
The Town sets its own fees each fiscal year, construction hours, rainy-season grading limits, noise limits for mechanical equipment, flatwork and fence rules, and its floodplain development permit. Building standards come from the state code, which the Town’s Building Department enforces, and contractors are licensed by the state.
San Anselmo building department: who handles permitting
The Building Department enforces the California construction and energy codes, reviews plans and issues permits for any construction and demolition in the Town. Planning handles design review, and Public Works issues encroachment, fence, flatwork, watercourse and floodplain development permits. Plan reviews for larger projects involve all of these departments.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Department, Town Hall, 525 San Anselmo Avenue, San Anselmo, CA 94960 |
| Permit technicians | (415) 258-4616 or (415) 258-4646; permits@sananselmo.gov |
| Counter hours | Monday to Thursday 8:30 to 11:45 a.m.; closed Fridays |
| Building inspectors | (415) 258-4618, Monday to Thursday 7:30 to 8:30 a.m. and 3:00 to 3:30 p.m., Friday 7:30 to 8:30 a.m.; inspector@sananselmo.gov |
| Online filing | eTrakit (applications, payments and inspections) |
| Planning | planning@sananselmo.gov |
San Anselmo permit types
eTrakit accounts are open to residents, licensed contractors, design professionals and agents acting for a resident. Homeowners use a Public account; contractors use a Contractor account. Every application that needs plans must include the Town’s Permit Submittal Checklist, and files are named “Street Number Street Name_Permit Number_Document Type_Submittal #”.
| Permit type | Review time |
|---|---|
| Water heater, furnace, plumbing, electrical, re-roof | Up to 3 business days |
| Existing kitchen or bath replaced in kind | Up to 3 business days, then a pre-inspection |
| Solar PV (eTrakit) / Symbium instant solar | Up to 5 business days / documents in 1–2 business days |
| Window or door replacement | Up to 1 week (1–2 weeks if openings change) |
| Residential building or pool, without / with structural calcs | 1 week / 2–3 weeks |
| ADU or JADU | 3–4 weeks, resubmittals 2–3 weeks |
| Commercial, simple / complex | Up to 1 week / 3–4 weeks |
Residential permits
- Residential Building covers demolition, new construction, remodels, gates and other work not listed elsewhere.
- Kitchen and bath remodels replaced in kind use their own checklist and get a pre-inspection before approval. The schedule prices a minor bathroom remodel at $1,174.20 for projects up to $15,000 and a minor kitchen remodel at $1,452.30 up to $25,000.
- Re-roofs need the Radiant Barrier Reroof Acknowledgement Form; window and door permits need the U-factor of every window and glazed door.
- ADUs and JADUs are filed as attached, detached or junior units; a separate checklist covers legalizing an ADU built before 2020. The building permit fee is waived for an ADU with a 55-year recorded affordability restriction for low-income renters.
- Solar can go through eTrakit with the Town’s photovoltaic checklist, or through Symbium, which approves eligible systems instantly.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial Building permits are filed as general, ADA improvement, shell, tenant improvement or new construction work. Alterations and additions to existing buildings need a Statement of Access Compliance, and any change to exterior mechanical equipment in a commercial zone needs Planning design review before the mechanical permit is approved. A commercial pre-application meeting with the Building Department is free; a non-commercial one costs $232.78 plus $100 to the Ross Valley Fire Department.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Design review. Residential or commercial design review by the Planning Director starts with a $1,350 deposit.
- Floodplain. Work in a special flood hazard area needs a Public Works floodplain development permit ($206), with elevation or floodproofing certifications and, where required, a recorded non-conversion agreement; building permits for flood gates are free.
- Creeks and trees. Work affecting a watercourse needs a $325 watercourse permit, and heritage tree removal starts at $325 for the first hour of review.
- Right-of-way. Driveway curb cuts, street cuts, sidewalks and temporary street obstructions need encroachment permits ($257.50 for minor work).
San Anselmo permit costs and fees
The Town Council adopted the Schedule of User Fees by Resolution No. 2026-4615 on April 28, 2026, a 3.0% CPI update that took effect on July 1, 2026. The posted schedule prints the FY 2025-26 rates beside the FY 2026-27 rates; the FY 2026-27 column, still headed “Proposed” in that file, carries the adopted amounts shown here. The building permit fee comes from the valuation table, and plan check is 65% of it. The initial plan check usually covers two rounds; further rounds are billed hourly.
| Item | Fee |
|---|---|
| Valuation $1–$3,999 | $205.80 |
| Valuation $4,000–$24,999 | $205.80 plus $26.84 per $1,000 |
| Valuation $25,000–$49,999 | $769.28 plus $16.32 per $1,000 |
| Valuation $50,000–$99,999 | $1,177.35 plus $12.34 per $1,000 |
| Valuation $100,000–$499,999 | $1,794.18 plus $10.03 per $1,000 |
| Valuation $500,000–$999,999 / $1,000,000 and up | $5,807.73 plus $8.67 / $10,142.00 plus $6.83 per $1,000 |
| Plan check | 65% of the permit fee |
| Plumbing, electrical or mechanical permit | 15% of the building permit fee, or $168 on its own |
| Energy fee (work affecting heated space) | 15% of the building permit fee |
| Technology / training / General Plan maintenance | 3% / 3% / 10% |
| Water heater or furnace replacement | $257.50 |
| Residential re-roof / window replacement | $319.30 / $484.10 |
| Swimming pool / spa or hot tub | $1,091.80 / $545.90, plus $772.50 plan check each |
| Solar PV or EV charging | $450 |
| Demolition | $648.90 |
| Work without a permit | Up to 5 times the permit fee, $500 minimum |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the valuation table: new construction valued at $200,000 falls in the $100,000–$499,999 band, so the permit fee is $1,794.18 plus 100 × $10.03, or $2,797.18, and plan check is 65% of that, $1,818.17, for $4,615.35. Trade, energy, technology, training and General Plan charges, the state seismic and green building fees, and the contractor gross receipts tax of $0.50 per $1,000 of valuation are added on top.
Waivers, penalties and payment
Electrical permit fees are waived for EV charging, rooftop solar and tankless water heaters, plumbing fees for graywater systems, re-roof fees for cool roof projects, and building fees for flood gates. For unpermitted work, the Building Official or department director sets the penalty at up to 5 times the permit fee ($500 minimum): it may be waived or held to 1–3 times if the owner stops work and fixes things promptly. Reinstating a permit costs 50% of the building permit fee and an extension $195.70; revisions after issuance are $330.01 an hour. Some over-the-counter permits are paid in eTrakit when you apply; others are paid online after staff review, in person at the counter, or by check in the drop box outside Town Hall or by mail. Card payments carry a 2.8% processing fee. Public Works charges $154.50 for a flatwork permit under 1,000 square feet and $200.85 for a fence within a street-side setback.
Trade permits and who may pull them
Plumbing, electrical and mechanical permits are issued by the Building Department through eTrakit. Plumbing and electrical permits normally need no documents because the work is inspected in the field, though staff may ask for them if the scope is unclear; most are issued within 3 business days.
- Mechanical. Furnace permits need no submittal. HVAC units, heat pumps and mini splits need a sound calculation showing less than 40 dB at the property line, using the Town’s inverse-square-law worksheet.
- Homeowners apply with a Public eTrakit account, as can someone acting on a homeowner’s behalf.
- Contractors use a Contractor account and must hold an active Town of San Anselmo business license. The Town charges a gross receipts tax of $0.50 per $1,000 of valuation on projects done by a contractor, and the annual business license tax runs by gross receipts, starting at $15 for up to $7,500.
- Changes of owner, contractor, architect or engineer on a permit carry a $154.50 administrative fee.
Rather not deal with the building department?
Get a free quote →How to apply for a San Anselmo building permit
Use the Town’s exemption list, and check Public Works rules for fences near the street, paving and creeks.
Get design review, floodplain, watercourse or tree approvals first where they apply; a pre-application meeting is available.
Choose a Public account (homeowners and their agents) or a Contractor account with an active Town business license.
Pick the permit type, then upload the plan set and completed Permit Submittal Checklist using the paper clip icon and the Town’s file naming rule.
Pay plan check fees, answer review comments and pay the remaining fees online or at the counter.
Keep the inspection card and Town-stamped plans on site and book inspections in eTrakit.
Review, corrections and what causes delay
Large projects usually take 6–8 weeks to be reviewed by all departments, and resubmittals 2–3 weeks. Plan check fees normally cover two rounds; repeated reviews, or plans that do not meet the Town’s minimum standards, can bring extra fees at hourly staff rates, and projects sent to a third-party reviewer pay the consultant cost plus Town charges. Exterior mechanical changes in commercial zones wait for Planning design review, and kitchen and bath replace-in-kind permits wait for the pre-inspection.
Inspections in San Anselmo
All inspections are booked online in eTrakit once the permit shows “Issued”. You choose a morning window (9:00 a.m. to 12:30 p.m.) or an afternoon window (1:00 to 4:00 p.m.), and someone must be on site for the whole window with the inspection card and Town-stamped plans. Results appear in eTrakit the next day, and correction questions go to inspector@sananselmo.gov or the inspector phone line during its morning and afternoon call hours.
- Permit life. Each passed inspection extends the permit for 180 days from the inspection date.
- Construction hours. Monday to Friday 7 a.m. to 7 p.m., with only quiet work before 8 a.m.; Saturday 9 a.m. to 5 p.m.; Sunday noon to 5 p.m.; no work on Town holidays. In the Bald Hill area, work is limited to weekdays 8 a.m. to 4:30 p.m.
- Rainy season. Erosion and sediment controls must be in place by October 15 and kept working until April 15, and no grading, excavation or fill is allowed in the rainy season without the Public Works Director’s approval.
Want this handled start to finish?
Get a free quote →California building code in San Anselmo
The Building Department enforces the California construction and energy codes, and the Town’s Municipal Code is published on Municode. On November 10, 2025 the Town Council adopted findings of local conditions for changes to the California Fire Code and the California Wildland-Urban Interface Code (Resolutions No. 2025-4601 and 2025-4602). Its floodplain sections (7-11.402 through 7-11.506, as the fee schedule cites them) call for certifications of lowest-floor elevation, floodproofing and floodway encroachment for development in special flood hazard areas. FEMA’s Community Status Book lists the Town of San Anselmo (community 060180) as participating in the National Flood Insurance Program, with a current flood map dated March 16, 2016, and as a Community Rating System class 8 community, which gives eligible flood insurance policies a 10% discount.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
San Anselmo building permit FAQs
Who issues building permits in San Anselmo?
The Town’s Building Department at Town Hall, 525 San Anselmo Avenue (415-258-4616), for all construction and demolition in the Town.
How much is a building permit in San Anselmo?
It depends on valuation: $200,000 of new construction carries a $2,797.18 permit fee and $1,818.17 plan check, before trade, energy and percentage charges. A water heater or furnace permit is $257.50.
Do I need a permit for a fence?
Fences 7 feet or less need no building permit, but any fence within 20 feet of the front property line needs a Public Works fence permit and may not exceed 3 feet.
How long does plan review take?
Small permits take up to 3 business days, house and pool permits 1 to 3 weeks, ADUs 3–4 weeks, and large projects about 6–8 weeks across all departments.
Can a homeowner apply for a permit?
Yes. Homeowners, or someone acting for them, create a Public account in eTrakit and apply online.
How do I schedule an inspection?
Book it in eTrakit for a morning (9:00 a.m. to 12:30 p.m.) or afternoon (1:00 to 4:00 p.m.) window, and have someone on site the whole time.
What are San Anselmo’s construction hours?
Weekdays 7 a.m. to 7 p.m. (quiet work only until 8 a.m.), Saturday 9 a.m. to 5 p.m. and Sunday noon to 5 p.m., with no work on Town holidays.
San Anselmo permit search and official resources
Permits, inspection results and fee estimates are tracked in eTrakit, and the Town posts a daily inspection schedule. For older permit records on a property, ask the permit technicians at permits@sananselmo.gov or (415) 258-4616.
Inspections are where schedules slip.
Get a free quote →- San Anselmo building permits and contacts
- Building & Safety: construction hours and rainy season rules
- Do I need a permit?
- Permit process
- Apply for a permit (eTrakit accounts)
- Permit submittal instructions by permit type
- Permit submittal checklist
- Permit fees and payment
- Schedule of User Fees, effective July 1, 2026
- Resolution No. 2026-4615 adopting the fee schedule
- Building inspections
- 2025 California Title 24 building standards
- FEMA Community Status Book, California
Simplify San Anselmo permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in San Anselmo sooner?
Let Alliance prepare, file, and track your San Anselmo permits while your crew stays on the job.
More California permitting guides
Marin County
Read guide →San Rafael
Read guide →Larkspur
Read guide →San Bernardino Building Permit Guide
Read guide →San Bernardino County Building Permit Guide
Read guide →San Bruno Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about San Anselmo permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.