In Newark, the City’s Building Inspection Division, part of the Public Works Department at City Hall, 37101 Newark Boulevard ((510) 578-4261), reviews plans, issues building permits and inspects construction in the city. All permits are now issued electronically: simple residential jobs are applied for by emailing the permit application to permits@newarkca.gov, eligible home solar goes through SolarAPP+, and plan check status is shown in eTRAKiT. Under the FY 2026-27 Master Fee Schedule the minimum permit fee is $161, and a job valued up to $2,000 pays a $289 building permit fee.
What requires a building permit in Newark?
Newark answers the “do I need a permit” question with its Building Permit Requirements brochure, and its fee schedule shows the range of work it permits: new buildings and additions, remodels, re-roofs, demolition, signs, manufactured homes and their foundations, grading and stormwater work, window retrofits, water heaters, and electrical, plumbing and mechanical installations. Some permits need no plans at all; the Division lists the common residential jobs that can be applied for with only the application form.
Permit, no plans usually needed
- Water heater replacements
- Electrical service upgrades and minor electrical work
- Re-piping an existing home and minor plumbing work
- Re-roofing
- Replacement HVAC equipment in the same location
- Repairs of pest control damage
Plans or a special handout
- New homes, multifamily buildings and additions (SFD and MFD submittal checklist)
- Commercial buildings and tenant improvements (commercial checklist)
- Rooftop solar that does not qualify for SolarAPP+ (plans may be emailed)
- Grading, demolition and swimming pool demolition, which have their own handouts
When you are unsure whether a job needs plans, the Division asks you to contact the Building Inspection office before applying.
What Newark decides and what the state holds
Newark sets its own permit, plan check and inspection fees in a Master Fee Schedule the City Council adopts each year, runs its own engineering, planning and fire prevention reviews, and has its own grading, stormwater and flood hazard handouts and fees. It also posts handouts on earthquakes, near-source factors and residential foundations for designers. Contractor licensing is a state matter; Newark’s part is the business license and contractor registration.
Newark building department: who handles permitting
The Building Inspection Division reviews construction documents for compliance with state and local codes and federal disabled access standards, issues the permits, and inspects the work. Planning and engineering reviews come from the City’s Community Development and Engineering divisions, and fire plan review from the Fire Department, all billed through the same Master Fee Schedule.
Short on time to read all of this?
Get a free quote →| Office | Details |
|---|---|
| Building Inspection Division | City Hall, 37101 Newark Blvd, Newark, CA 94560; main line (510) 578-4261 |
| Permit applications | permits@newarkca.gov |
| Inspection requests | birequests@newarkca.gov or (510) 578-4261 |
| Code and permit history questions | building.inspection@newarkca.gov |
| Business license | (510) 578-4264 |
| City Hall main line | 510-578-4000 |
Newark permit types
Newark splits permits into those that do not require plans, applied for by email with the Permit Application form, and those that do, filed with plans for review. A separate fast lane, SolarAPP+, gives instant permits for new residential rooftop solar and battery systems that meet its eligibility checklist, without a full plan set and with three free revisions; every other solar or PV system needs a regular building permit.
Residential permits
- New homes and multifamily. The SFD and MFD submittal checklist, a certified plot plan form and handouts on residential foundations and fuel gas pipe sizing.
- Remodels. A kitchen or bathroom remodel of one room is a single $662 permit that includes plan check; kitchen and bathroom remodel handouts list the requirements, and alterations must follow the accessible path of travel handout where it applies.
- Re-roofs. Preset fees for single-family homes: $249 for composition shingles or wood shakes, $374 for lightweight tile and $499 for heavy tile over 6 pounds.
- Equipment swaps. Replacing a storage water heater with another storage water heater is $222, plus the application, state and records fees; retrofit windows set in existing frames are $40 in total.
- Manufactured homes. Installation is $250 per unit, with foundation permits on their own valuation scale.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects use the commercial submittal checklist and the building occupancy classification inventory form, and pay the valuation-based plan check and permit fees. Fire Department construction plan review, which includes the fire inspections, is $1,382 for multifamily, commercial and industrial buildings and $691 for a new single-family house or a tenant improvement; sprinkler systems are $691 under NFPA 13D and $988 under NFPA 13R, and fire permits are valid for 180 days. Wall signs are $161 for the first sign and $21 for each more at the same business.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning: Planning Division forms cover zoning approvals, and a property zoning verification letter is $875.
- Address: new address assignments are $100.
- Grading and drainage: rough grading plan review is $462 up to 500 cubic yards, and the grading permit handout sets the rules.
- Stormwater: a stormwater quality control plan review, required under the City’s NPDES permit, is $250 for a four-plex or smaller and $500 for parcels of 10,000 square feet to one acre.
- Waste management plan: the Division posts a construction waste management plan form among its most requested items.
- Other agencies: the Development Related Agencies sheet lists the outside approvals.
Newark permit costs and fees
Building fees are in section G of the City of Newark Master Fee Schedule for FY 2026-27. Its cover says it is effective July 1, 2026, while the City’s link to it reads “Effective September 21, 2026”; the schedule notes that changes are adopted each year by the City Council. Each application pays a nonrefundable application fee ($96 over the counter, $192 with plan check, $96 for demolition), then a plan check fee and a building permit fee from the valuation tables. For small projects the permit fee is either the valuation fee or a fee based on the number of inspections needed ($259 an hour), whichever is higher.
| Valuation | Plan check fee | Building permit fee |
|---|---|---|
| Up to $2,000 | $118 | $289 |
| $2,001 to $20,000 | $118 + $13.40 per $1,000 over $2,000 | $289 + $23 per $1,000 over $2,000 |
| $20,001 to $50,000 | $360 + $5.90 per $1,000 over $20,000 | $707 + $2.60 per $1,000 over $20,000 |
| $75,001 to $100,000 | $1,542 + $8.20 per $1,000 over $75,000 | $1,035 + $21 per $1,000 over $75,000 |
| $100,001 to $500,000 | $1,748 + $3.30 per $1,000 over $100,000 | $1,550 + $4.10 per $1,000 over $100,000 |
| $500,001 to $1,000,000 | $3,087 + $2.60 per $1,000 over $500,000 | $3,198 + $6.70 per $1,000 over $500,000 |
| $1,000,001 to $2,000,000 | $4,374 + $1.60 per $1,000 over $1,000,000 | $6,546 + $1.60 per $1,000 over $1,000,000 |
| Over $2,000,000 | $5,919 + $1 per $1,000 over $2,000,000 | $8,091 + $1.60 per $1,000 over $2,000,000 |
Rather talk it over?
Call 1-855-478-4290 →The $50,001 to $75,000 band is left out above because the schedule prints it oddly: plan check is “538 + 40 for each 1,000 over 50,000”, far above the neighboring rates, and the permit fee “784 + 10 for each 1,000” is counted “over 75,000”, so ask the Division for a figure in that range. A records automation and maintenance fee of 10% of building permit fees ($5 minimum, $10,000 maximum) and the state Building Standards and Strong Motion fees are added to permits.
Worked example on the valuation tables: a $200,000 addition has a plan check fee of $2,078 ($1,748 plus 100 × $3.30) and a building permit fee of $1,960 ($1,550 plus 100 × $4.10); with the $192 application fee and the $196 records fee, the City’s charges come to $4,426 before state fees and any fire or engineering reviews.
| Item | Fee |
|---|---|
| Minimum permit fee | $161 |
| Minor or over-the-counter plan review | $59 |
| Temporary permit, no drawings and no concealed work | $206 |
| Third and later plan reviews | City hourly rate, or consultant cost plus 25% |
| Inspections on non-scheduled days | $387 an hour, 4-hour minimum |
| Copy of an existing certificate of occupancy | $42 |
| Temporary permit with drawings and inspections | Standard valuation fees or $250, whichever is greater |
| Building relocation evaluation inspection | $156 an hour, 2-hour minimum, plus travel |
| Termination of a notice of violation | $103 |
| Scanning of soils reports / large sheets | $5 per report / $2 per page |
Card payments are capped at $15,000 per payment. Questions about the schedule go to the Finance Department at (510) 578-4310.
Rather not deal with the building department?
Get a free quote →Trade permits and who may pull them
Electrical, plumbing and mechanical work is permitted by the Building Inspection Division under the same application and valuation tables, and many trade jobs (service upgrades, minor electrical and plumbing work, repipes and replacement HVAC units) need no plans. The Division posts load calculation sheets for dwelling and existing feeders and services and a fuel gas pipe sizing handout. Building permits are issued only to the property owner or to a properly licensed contractor.
Anyone doing business in Newark needs a City business license; the City sorts licenses into commercial, home-based, out-of-town (such as construction contractors) and specialized businesses needing police approval. Licenses are issued for the calendar year and expire December 31. The schedule lists a $129 fee for a new in-city business, $33 for an out-of-city business and $32 for a contractor’s annual registration (or $10 a quarter, up to $30 a year) under Resolution No. 6108. Renewals must be paid or postmarked by January 31, and approval takes about 10 business days. The Finance Department’s page says it would not accept new applications or renewals for 2027 until the result of the November 2026 ballot measure on the Business License Tax Ordinance was determined, so ask Finance whether it is taking them now.
How to apply for a building permit in Newark
Check the no-plans list, or ask the Building Inspection office; eligible rooftop solar and batteries can use SolarAPP+ instead.
Fill in every field; jobs with plans also follow the SFD/MFD or commercial submittal checklist.
Staff review the form and enter it in the City’s permit tracking system.
You receive an invoice and payment instructions; Finance tells you when the payment is processed.
Building Inspection staff email the permit for signature, and it must be emailed back before inspections can be booked.
Email birequests@newarkca.gov or call (510) 578-4261 at least 24 to 48 hours ahead.
Review, corrections and what causes delay
For permits without plans, applications received before 4 p.m. may be processed the same working day but can take up to one business day; those received after 4 p.m. are processed the next business day. The Division asks that every field of the form be filled in, since missing information slows processing. Projects with plans are reviewed by City staff, and their plan check status shows in eTRAKiT; the third and later reviews of the same project cost extra, and expedited review by an outside consultant can be arranged at the added cost plus 25%. Geotechnical peer reviews are billed at actual cost plus 25%.
Want this handled start to finish?
Get a free quote →Inspections in Newark
After the permit is issued and signed, request each required inspection by emailing birequests@newarkca.gov or calling (510) 578-4261, allowing at least 24 to 48 hours. Give the project address, the permit number in the City’s PREFIX YEAR-NUMBER format (for example SFD2021-0001), the type of inspection, the name and phone of the on-site contact, the day you want and whether you prefer the morning window (8:30 a.m. to noon) or the afternoon (1 to 4:30 p.m.). Staff call or email back to confirm, and eTRAKiT shows a narrower time window on the day. Developers needing several inspections use the multi-inspection request form.
Newark does not issue paper job cards: inspection results are emailed after each visit to the person named as the on-site contact. Re-inspections allowed under the municipal code are charged at the hourly rate, and the Division posts a list of the inspections a permit requires.
California building code in Newark
The Building Inspection Division reviews plans for compliance with applicable state and local codes and federal disabled access standards. FEMA’s Community Status Book lists the City of Newark (community 060009) as participating in the National Flood Insurance Program, with flood maps effective August 3, 2009; the Division’s Flood Hazard Zones handout covers building in mapped areas.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Newark permit search and official resources
Recent permits can be searched in the City’s eTRAKiT site, which also shows plan check status. For older permit history or copies of plans, email building.inspection@newarkca.gov with the property address and what you are looking for; a copy of an existing certificate of occupancy costs $42.
- Newark Building Inspection Division
- Applying for a permit (no plans)
- Requesting an inspection
- Building Inspection FAQs
- Master Fee Schedule FY 2026-27
- Business license
- FEMA Community Status Book, California
Inspections are where schedules slip.
Get a free quote →Newark building permit FAQs
Who issues building permits in Newark?
The Building Inspection Division of the Public Works Department, at City Hall, 37101 Newark Boulevard.
Can I apply by email?
Yes. Permits that need no plans are applied for by emailing the completed Permit Application to permits@newarkca.gov.
How much is a re-roof permit for a house?
$249 for composition shingles or wood shakes, $374 for lightweight tile and $499 for heavy tile, plus the application and records fees.
Can a homeowner pull a permit?
Yes. Permits go only to the property owner or a properly licensed contractor.
How do I schedule an inspection?
Email birequests@newarkca.gov or call (510) 578-4261 at least 24 to 48 hours ahead and ask for a morning or afternoon window.
Where is my job card?
Newark issues none; inspection results are emailed after each inspection to the on-site contact.
Can I get an instant solar permit?
Yes, through SolarAPP+ for new residential rooftop solar and storage that meets the eligibility checklist.
Do contractors need a Newark business license?
Yes. Out-of-town contractors are a business license category, and the contractor’s annual registration is $32.
Simplify Newark permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Newark sooner?
Let Alliance prepare, file, and track your Newark permits while your crew stays on the job.
More California permitting guides
Alameda County
Read guide →Oakland
Read guide →Piedmont
Read guide →Newman Building Permit Guide
Read guide →Newport Beach Building Permit Guide
Read guide →Norco Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Newark permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.