Highland, California Building Permit Guide

To get a building permit in Highland, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Highland’s Building & Safety Division issues building, electrical, mechanical, plumbing and demolition permits inside city limits from City Hall at 27215 Base Line, and takes Building and Fire Prevention permit applications through an online portal.

Authority: City of Highland Building & SafetyOffice: 27215 Base LinePhone: 909-864-6861 ext. 232
Counter
Mon–Thu, 7:30 a.m.–5:30 p.m.Permits issued until 5:00 p.m.
Inspections
Mon–Thu plus alternate FridaysMorning or afternoon blocks
Fire sprinklers
All new structuresAnd some additions
Impact fees, new house
$31,349Detached dwelling, non-subdivided, since April 1, 2024

In Highland, the city’s Building & Safety Division, led by Building Official Matt Wirz, issues building, electrical, mechanical, plumbing and demolition permits for all work inside city limits. The counter at City Hall, 27215 Base Line, takes plan check submittals Monday to Thursday from 7:30 a.m. to 5:30 p.m., and Building and Fire Prevention permits can also be filed online. Every new structure needs fire sprinklers, and a new detached house on non-subdivided land outside East Highlands Ranch pays $31,349 in development impact fees.

What requires a building permit in Highland?

Highland requires permits for new buildings, additions such as bedrooms, bathrooms and family rooms, residential work including decks, garages, fences, fireplaces, pools and water heaters, renovations such as garage conversions and kitchen expansions, re-roofing or roof repairs, electrical and solar systems, plumbing systems and HVAC systems. The division’s Permit Exceptions page, which still quotes Section 105.2 of the 2019 California Building Code, lists the work that is exempt, while noting that exempt work must still meet the technical codes and city, county and state ordinances.

Permit required

  • New buildings and additions
  • Decks, garages, fences, fireplaces, pools and water heaters
  • Garage conversions and kitchen expansions
  • Re-roofing or roof repairs
  • Electrical and solar systems, plumbing and HVAC
  • Finish work that removes or replaces sinks, electrical items or drywall
  • Masonry or concrete fences over 3 feet and other fences over 6 feet
  • Retaining walls over 4 feet, or any that support a surcharge or a slope steeper than 2:1

No permit

  • One-story detached accessory structures of 120 square feet or less
  • Masonry or concrete fences up to 3 feet; wood, vinyl or chain-link fences up to 6 feet that are not part of a pool barrier
  • Painting, papering, tiling, carpeting, cabinets and countertops
  • Platforms, sidewalks and driveways no more than 30 inches above grade
  • Prefabricated above-ground pools under 18 inches deep holding up to 5,000 gallons
  • Decks up to 120 square feet, no more than 30 inches above grade, not attached and not serving the required exit door
  • Window awnings on houses projecting no more than 54 inches

Exempt structures still need separate electrical, plumbing or mechanical permits for any trade work, and zoning setbacks and fence heights still apply; the Planning counter answers those questions at 909-864-8732 ext. 258. Every residential retaining wall, even an exempt one, must include the footing and wall reinforcement set out in the city’s Policy 355 unless specifically exempted.

What the city decides and what the state holds

Highland’s municipal code incorporates the California Building Standards Code with modifications for local climatic, geographic and topographic conditions, set out in Title 15. The city also requires fire sprinklers in all new structures and some additions, allows multipurpose fire sprinkler systems with CPVC or PEX piping, and publishes its own construction policies, from tile roof engineering to temporary occupancy of an owner-builder’s custom house. The state sets the building standards and licenses contractors.

Short on time to read all of this?

Get a free quote →

Highland building department: who handles permitting

The City of Highland Building & Safety Division performs plan review for all commercial, industrial and residential projects within city limits, including new structures, additions and remodels, and inspects architectural, structural, plumbing, electrical, mechanical, energy, accessibility, green building, fire and life-safety work. Matt Wirz is the Building Official. Fire Prevention permits are filed through the same portal, and Public Works issues grading permits for commercial and tract projects. Land outside the city is permitted by San Bernardino County.

Highland permit contacts
DetailInformation
Building & SafetyCity Hall, 27215 Base Line, Highland, CA 92346; 909-864-6861 ext. 232; fax 909-862-3180
Counter hoursMonday to Thursday, 7:30 a.m. to 5:30 p.m. for plan check submittals; permits issued 7:30 a.m. to 5:00 p.m.
Online portalBuilding and Fire Prevention permit applications, uploads, invoices and inspection requests, linked from the city’s permit portal page
Planning909-864-8732 ext. 258 (counter) or 909-864-6861; planning@highlandca.gov
Fire Marshal909-864-6861 ext. 248
Fire flow testsEast Valley Water District, 909-888-8986

Highland permit types

The division issues five categories of permit: building, electrical, mechanical, plumbing and demolition. Its forms page carries the building permit application, separate declaration packets for contractors, property owners and owner-builders, a common wall agreement, a construction and demolition waste program guide, a demolition packet, a deputy inspector registration form, an ADU and junior ADU packet, standard plans for patio covers, block walls, pilasters and retaining walls up to 6 feet, and a sample at-risk, hold harmless and concurrent review letter.

Residential permits

  • New houses and additions: the plan check page asks for three plan sets covering the site, structure, electrical (with load calculations), plumbing, mechanical and duct layout, trusses, Title 24 energy, precise grading and conditions of approval, plus two sets of soils and geology reports and structural and truss calculations.
  • Fire flow: new construction and additions need a fire flow test report from East Valley Water District, and the site plan must show the nearest hydrant and its distance to the farthest point of the building as the hose lays.
  • Grading: Building & Safety handles grading plan review, permits and inspections for residential additions and single new houses.
  • Solar: residential solar needs plan check before installation, and expedited review should take no more than one to two days; licensed contractors can use SolarAPP+ for roof-mounted systems up to 38.4 kW AC. Ground-mounted systems, and systems on a structure designated historic, need Planning approval first, and panel upgrades need a separate electrical permit.
  • ADUs: the city publishes an ADU and junior ADU information packet.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and tract projects get their grading permits from Public Works, and tenant improvements follow their own submittal list. The submittal list also covers a site accessibility plan, a commissioning plan when required, fire sets and one set of approved Health Department plans. Seismic design is generally no lower than Category D, the design rainfall is 2 inches per hour, the climate zone is 10, and the ground snow load is zero. Electric vehicle charging stations have an expedited permitting process.

What comes before the building permit

  • Planning: every new structure goes through the Planning Division’s process before construction plans are submitted to Building & Safety.
  • Fire hazard zones: the city’s Fire Hazard Severity Zone page posts the State Fire Marshal’s Local Responsibility Area map published March 25, 2025, which the page says the city must adopt by ordinance within 120 days; the city’s Fire Marshal (ext. 248) takes questions on it.
  • Fire sprinklers: sprinkler plans go to the fire department for review before installation; deferred truss and sprinkler submittals must be in before the building permit issues.
  • Approvals: before issuance and again before final, staff route an approval list to city divisions and outside agencies.

Highland building permit fees

Highland’s Building & Safety pages do not post a building permit fee schedule. Staff calculate fees when they review an application and email an invoice with a payment link; at the counter, the application fee for a solar permit is collected at submittal and the rest when the permit is pulled. Planning and development impact fees are published.

Rather talk it over?

Call 1-855-478-4290 →
Planning fees (Resolution No. 2025-033, updated September 3, 2025)
ApplicationFee
Design review, minor / major$5,310 fixed / $9,000 deposit
Conditional use permit, minor / major$3,905 fixed / $13,900 deposit
Variance, minor / major$2,370 / $4,995
Tree removal review and permit$610
Sign permit$225
Temporary use permit, minor / major$75 / $615
Lot line adjustment$2,720
Staff review$100
Water quality management plan review, major$6,100 deposit

Deposit-based applications are billed against the deposit at fully burdened hourly rates, and the Community Development Director may reduce an initial deposit for a less complex project.

Development impact fees, non-subdivided development (effective April 1, 2024)
UseTotal
Detached dwelling$31,349 per unit
Attached dwelling$22,287 per unit
Mobile home$19,408 per unit
Commercial lodging$14,188 per lodging unit
Commercial or office$20.949 per sq ft
Industrial$15.604 per sq ft

The detached dwelling total is made up of regional circulation ($16,409), general facilities ($3,473), park land and facilities ($3,537), local circulation ($2,814), regional flood control ($2,687), library ($1,563), fire suppression ($779) and law enforcement ($87). The fee is locked in when the permit application is filed (Resolution 2023-040) and collected at building permit issuance or occupancy. All new units also pay an inclusionary housing fee of $3,750. East Highlands Ranch has its own fee schedule, and some properties fronting Greenspot Road pay an added Greenspot impact fee.

Residential building expansions are not charged an impact fee for the first 499 square feet; larger expansions of a detached dwelling are charged at $20.899 per square foot, and of an attached dwelling at $14.858.

Trade permits and who may pull them in Highland

Electrical, mechanical and plumbing permits are separate permit categories issued by Building & Safety, including for trade work on structures that are themselves exempt. The Permit Exceptions page lists the trade work that needs no permit, such as replacing a fixed motor or appliance of the same type and rating in the same location, repairing switch parts, clearing stoppages and leaks, and replacing a toilet, sink, disposal or dishwasher without moving valves, pipes or fixtures.

Rather not deal with the building department?

Get a free quote →

Contractor declarations must be signed by the licensed contractor or a person listed on the license in CSLB’s records; if an employee or representative pulls the permit, the city asks for a notarized letter of authorization. For solar permits, the city checks that the contractor holds a current Highland business license, required under Municipal Code 5.04.030 for anyone doing business in the city. Owner-builders apply without a contractor, using the Property Owners Package and the 2023 owner-builder declaration; if they hire a licensed contractor, the contractor’s details go in the application’s contractor, architect and engineer fields.

How to apply for a Highland building permit

1. Clear Planning

New structures complete the Planning Division’s process first; ground-mounted solar and work on historic structures also need Planning approval.

2. Prepare the submittal

Use the new plan check checklist, the plan set and report counts, the fire flow test from East Valley Water District and the city’s policies.

3. Apply online or at the counter

Choose “Building Permit Application” in the portal, or file at the Building Counter in City Hall.

4. Upload declarations

Contractors upload signed declarations; owner-builders upload the property owner package; agents add a notarized authorization.

5. Completeness review and invoice

Staff review the application within one to three business days and email a request for missing items or an invoice.

6. Receive the job card

After payment and approval, the applicant receives a link to the job card and the approved plans.

7. Book inspections

Request each inspection through the portal.

Review, corrections and what causes delay

Most online applications are processed the same business day, or the next day for after-hours submittals, but complete plan check takes longer and re-submittals have their own required checklist. Once a project has started electronically, the city asks that it stay electronic. Deferred truss and sprinkler submittals must be in before the permit issues, and the approval routing list is checked again before final.

Highland building inspections

Request Building & Safety and Fire Prevention inspections through the electronic permit portal; the day’s inspection schedule is posted by 8:00 a.m. Building inspections run Monday to Thursday from 8:00 a.m. to 5:00 p.m. and on alternate Fridays shown on the city’s 2026 inspection calendar, excluding federal holidays. Inspectors work in morning (8:00 a.m. to noon) and afternoon (noon to 5:00 p.m.) blocks and cannot promise exact times; Friday inspections are mornings only, and Fire Prevention inspections are mornings only, Monday to Thursday.

Want this handled start to finish?

Get a free quote →

An adult over 18 must give the inspector access, and the job card and approved construction documents must be on site. If the site cannot be reached or the plans are missing, cancel before 8:00 a.m. on the inspection day at 909-864-6861 ext. 232. Ladders must be tied off and secured, and access details such as a garage code go in the request. Work must be inspected before it is covered.

California building code in Highland

Highland’s adoption of the state codes and its local amendments are in Title 15 of the municipal code. FEMA’s Community Status Book lists the City of Highland (community 060732) as participating in the National Flood Insurance Program, with flood maps effective October 30, 2025.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Highland building permit FAQs

Do I need a permit for a fence in Highland?

Masonry or concrete fences over 3 feet, and wood, vinyl or chain-link fences over 6 feet or forming part of a pool barrier, need a permit; zoning height limits apply to all fences.

Are fire sprinklers required?

Yes, in all new structures and some additions; the city allows multipurpose systems using CPVC or PEX piping.

Can I apply online?

Yes. Building and Fire Prevention permits can be filed through the city’s portal; most are processed the same or the next business day.

When are inspections done?

Monday to Thursday from 8:00 a.m. to 5:00 p.m. in morning or afternoon blocks, plus alternate Friday mornings.

How much are impact fees on a new house?

$31,349 for a detached dwelling on non-subdivided land, plus a $3,750 inclusionary housing fee.

Who is Highland’s Building Official?

Matt Wirz.

Does a small shed need a permit?

Not if it is a one-story detached structure of 120 square feet or less, but setbacks still apply and trade work needs its own permit.

Highland permit search and official resources

Permit holders can look up their permit in the portal by number to upload revisions or check inspections; for other permit records, call Building & Safety at 909-864-6861 ext. 232.

Inspections are where schedules slip.

Get a free quote →

Simplify Highland permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Highland sooner?